A picture containing sky, outdoor, clouds, cloudy

Description automatically generated

 

Agenda and
Business Paper

 


Ordinary Meeting of Council

 

 

 

To be held on
Monday 22 August 2022

at 6:00pm

 

 

 

Civic Centre cnr Baylis and Morrow Streets,
Wagga Wagga NSW 2650 (PO Box 20)
P 1300 292 442
P council@wagga.nsw.gov.au


wagga.nsw.gov.au


NOTICE OF MEETING

 

The proceedings of all Council meetings in open session, including all debate and addresses by the public, are recorded (audio visual) and livestreamed on Council’s website including for the purpose of facilitating community access to meetings and accuracy of the Minutes.

 

In addition to webcasting council meetings, audio recordings of confidential sessions of Ordinary Meetings of Council are also recorded, but do not form part of the webcast.

 

A person wearing glasses and a suit

Description automatically generated with medium confidence

 


WAGGA WAGGA CITY COUNCILLORS

 

Graphical user interface, application, Teams

Description automatically generated

 

STATEMENT OF ETHICAL OBLIGATIONS

Councillors are reminded of their Oath or Affirmation of Office made under Section 233A of the Local Government Act 1993 and their obligation under Council’s Code of Conduct to disclose and appropriately manage Conflicts of Interest.

 

QUORUM

The quorum for a meeting of the Council is a majority of the Councillors of the Council who hold office for the time being who are eligible to vote at the meeting.

 


Reports submitted to the Ordinary Meeting of Council to be held on Monday 22 August 2022.

Ordinary Meeting of Council AGENDA AND BUSINESS PAPER

Monday 22 August 2022

ORDER OF BUSINESS:

CLAUSE               PRECIS                                                                                       PAGE

ACKNOWLEDGEMENT OF COUNTRY                                                                          3

REFLECTION                                                                                                                3

APOLOGIES                                                                                                                 3

Confirmation of Minutes

CM-1           ORDINARY COUNCIL MEETING - 8 AUGUST 2022                                    3

DECLARATIONS OF INTEREST                                                                                    3

Motions Of Which Due Notice Has Been Given

NOM-1         NOTICE OF MOTION – ROADSIDE VERGE GARDENS                              4

Reports from Staff

RP-1            Final Peer Review of the 2018 Wagga Wagga Floodplain Risk Management Study & Plan                                                               20

RP-2            Planning Proposal (LEP21/0004) Cleek Street, Currawarana - Amendment to Minimum Lot Size of the Wagga Wagga Local Environmental Plan 2010                                                                                                                27

RP-3            PLANNING PROPOSAL (LEP21/0005) 77 GURWOOD STREET - ADDITIONAL PERMITTED USE                                                                                     32

RP-4            Planning Proposal (LEP21/0006) 7066 Holbrook Road, Rowan - Amendment to land zoning, minimum lot size and urban release area provisions of the Wagga Wagga Local Environmental Plan 2010                 36

RP-5            Administrative Changes to Wagga Wagga Development Control Plan 2010                                                                                                         43

RP-6            Update to Fees and Charges to reflect amended Planning Proposal Guidelines                                                                                            48

RP-7            RESPONSE TO NOTICE OF MOTION - SHADE SAILS OVER PLAYGROUNDS    54

RP-8            RESUABLE CLOTH NAPPY AND MENSTRUAL PRODUCT REBATE TRIAL       61

RP-9            Revised Public Art Plan 2022-2026                                                  67

RP-10          Revised Community Safety Action Plan 2022 - 2026                    89

RP-11          REVISED ALL ABILITIES INCLUSION ACTION PLAN 2022 - 2026            92

RP-12          MORTIMER PLACE PETITION                                                                  94

RP-13          CHILDREN'S CROSSING - WILLIAM STREET NORTH WAGGA WAGGA 97

RP-14          FINANCIAL PERFORMANCE REPORT AS AT 31 JULY 2022                 134

RP-15          RESOLUTIONS AND NOTICES OF MOTIONS REGISTERS                    161


 

 

RP-16          RESPONSES TO QUESTIONS WITH NOTICE                                         183

RP-17          QUESTIONS WITH NOTICE                                                                    186

Committee Minutes

M-1              FLOODPLAIN RISK MANAGEMENT ADVISORY COMMITTEE MINUTES MEETING 7 JULY 2022                                                                                              187

M-2              LOCAL TRAFFIC COMMITTEE MEETING - 27 JULY 2022                      194   

Confidential Reports

CONF-1       RFT2023-07 CONCRETE WORKS AT THE LIVESTOCK MARKETING CENTRE SHEEP YARDS DESIGN AND CONSTRUCT                                                       199

CONF-2       PROPOSED RENEWAL OF LEASES - 36-40 GURWOOD STREET, WAGGA WAGGA   200

 


 

 

ACKNOWLEDGEMENT OF COUNTRY

Wagga Wagga City Council acknowledges the traditional custodians of the land, the Wiradjuri people, and pays respect to Elders past, present and future and extends our respect to all First Nations Peoples in Wagga Wagga.

We recognise and respect their cultural heritage, beliefs and continuing connection with the land and rivers. We also recognise the resilience, strength and pride of the Wiradjuri and First Nations communities

 

 

RELECTION

Councillors, let us in silence reflect upon our responsibilities to the community which we represent, and to all future generations and faithfully, and impartially, carry out the functions, powers, authorities and discretions vested in us, to the best of our skill and judgement.

 

 

APOLOGIES

 

 

Confirmation of Minutes

CM-1              ORDINARY COUNCIL MEETING - 8 AUGUST 2022       

Recommendation

That the Minutes of the proceedings of the Ordinary Council Meeting held on 8 August 2022 be confirmed as a true and accurate record.

 

 

 

Attachments

 

1.

Minutes - 8 August 2022

201

 

 

DECLARATIONS OF INTEREST


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

NOM-1

 

Motions Of Which Due Notice Has Been Given

NOM-1           NOTICE OF MOTION – ROADSIDE VERGE GARDENS

Author:            Councillor Richard Foley

 

 

Summary:

The purpose of this Notice of Motion is to request a report on the process of trialling roadside vegetable gardens and/or small orchards in multiple trial locations across the City of Wagga Wagga Local Government Area (LGA).

 

 

Recommendation

That Council receive a report detailing:

a       relevant information specific to this concept already in operation in several other LGA’s across Australia

b       listing some of the potential locations and streets that council could consider constructing a roadside verge garden and/or small orchid

c        broad estimated costing analysis to develop and construct roadside verge gardens including all inputs such as quality locally available composts, soils, surface mulches and plants

 

Report

This proposed Notice of Motion is focused upon facilitating a trial process of roadside verge gardens in multiple locations across the City.

 

Whilst this proposal is nothing new, being already currently done in several council LGA’s across Australia, I believe it is a much better alternative for some streets that currently have messy verges growing noxious weeds and long grasses requiring council maintenance or intervention via mowing, slashing or weed spraying.

 

It would be appropriate that any report dealing with this proposal listed the full estimated costings to council to properly establish these verge gardens with quality inputs and plants all of which must be sourced locally.

 

If the costings are viable for installing a roadside verge garden, I would propose that the next stage was progressed to consider allocating funds from the relevant area of the council budget. Further to this stage expressions of interest from any local residents to have the concept trialled in their streets needs to be a key priority.  

 

In order for this proposal to be successful it would be imperative that local residents supported the program and were committed to protecting and maintaining the vegetables, herbs and/or fruit trees that may be planted in the roadside verge gardens after council had established the gardens.

 

All food produced by these roadside verge gardens would be freely available to any local residents to harvest and use for themselves. Aside from the positive aspect of food production grown locally this proposal could go a long way to seeing local neighbours building better friendships and positive local community spirit.

 

A fine example of this concept with comprehensive guidance can be seen by looking at the Footpath Garden Policy of the Sydney City Council (attached).

 

Financial Implications

N/A

Policy and Legislation

N/A

 

Link to Strategic Plan

Community Place and Identity

Objective: Our community are proud of where we live and our identity

Promote a strong sense of place

 

Risk Management Issues for Council

N/A

Internal / External Consultation

N/A

 

 

Attachments

 

1.

Footpath Gardening Policy Sydney City Council

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

NOM-1

 

A picture containing text, tree, outdoor, ground

Description automatically generated

A picture containing graphical user interface

Description automatically generated

Text

Description automatically generated

Graphical user interface, text

Description automatically generated

Text

Description automatically generated

Graphical user interface, website

Description automatically generated


Text

Description automatically generated

Text

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Graphical user interface, website

Description automatically generated

Diagram

Description automatically generated

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-1

 

Reports from Staff

RP-1               Final Peer Review of the 2018 Wagga Wagga Floodplain Risk Management Study & Plan

Author:          Peter Thompson 

         

 

Summary:

The purpose of this report is to provide Council with a copy of the Peer Review of the 2018 Floodplain Risk Management Study and Plan (FRMS&P) and to establish the next steps for flood mitigation options in North Wagga and the surrounding areas.

 

 

Recommendation

That Council:

a       accept the final Peer Review of the 2018 Floodplain Risk Management Study and Plan (FRMS&P)

b       note the outcome of the final Peer Review shows there were no findings which would materially change the outcomes of the 2018 FRMS&P 

c        endorse the inclusion of the final Peer Review as an addendum to the 2018 FRMS&P

d       recommence the Feasibility Study for Flood Mitigation Options for North Wagga and Surrounding Floodplain Area as it was previously constituted, incorporating a thorough communication and consultation process

e       note the recommendation in M-1 regarding the establishment of process for appointment, terms of membership and termination for co-opted members of the Floodplain Risk Management Advisory Committee

 

Report

Background

 

The Wagga Wagga Floodplain Risk Management Study Plan (FRMSP) was adopted in March 2018 after several years of preparation. It replaced the study of 2009.  The review and updating of the floodplain risk management study and plan is routine under the NSW Flood Prone Land Policy and is usually triggered by the availability of better data and methodology which improves the quality of the study and plan or a significant flood event. This was the case with the FRMSP.   

 

One of the areas of Wagga which is greatly impacted by flooding is North Wagga. The settlement of North Wagga is situated in the floodway of the Murrumbidgee River. This fact means that there are many factors to consider in relation to assessing risk associated with the flood event itself and the best approach to mitigating the impact of flood events.

 

While the community was consulted in the preparation of the FRMSP study adopted in 2018, there were calls from the North Wagga community that their views had not been given due weight in the recommendations which were made in the FRMSP and plan. Ultimately there were three options which were recommended for further investigation and feasibility assessment.  One was voluntary house purchase, the second was house raising (or a combination of both). The other was increasing the height of the levee around North Wagga to protect it from a 5% AEP event (which is often referred to as a 1 in 20-year flood event).

 

The next step in the process of delivering flood mitigation works to North Wagga was to undertake a feasibility study into the three recommended options. Tenders were called and a contract was issued to the Centre for International Economics to undertake this work.

 

As noted above, during the preparation of the FRMSP from 2015 to 2018 there was public commentary from the North Wagga community that their views had not been properly taken into account in the study and were not reflected by the three options which were adopted for further investigation. The view expressed by the representatives of the North Wagga community that a levee which protected the village from a flood event greater than a 5% AEP should be considered. It was said that this should be a 1% AEP event but there was also acknowledgement that something less than this would be acceptable whereas 5% AEP and voluntary house raising and house purchase was not acceptable.

 

Council, with the Floodplain Risk Management Advisory Committee (FRMAC), wrote to the Minister requesting that funding be provided to undertake a feasibility study for a levee which provided greater protection to what was recommended in the FRMSP. The Minister responded that he would not fund such a feasibility study as it was not endorsed by the current FRMSP. He suggested that Council might like to undertake a brief review of the study and he would reconsider the question.

 

Again, with the endorsement of Council and the FRMAC, a Peer Review of the current FRMSP was pursued. The representatives of the North Wagga community which form the North Wagga subcommittee on the FRMAC participated in reaching the way forward and also participated directly in the preparation of the scope of work for the Peer Review. The Council, the FRMAC and the representatives of North Wagga subcommittee reached agreement on the scope of works and ultimately the same groups also endorsed a successful tenderer which was BMT.

 

The feasibility study for the first three options commenced at about this time and communication with the North Wagga community was commenced by the Consultant. The North Wagga Residents Association objected to this process continuing given the Peer Review process was underway.  Council agreed to suspend work on the options for flood mitigation in North Wagga which had been approved for further investigation and this suspension remains in place pending and outcome to the Peer review process.

 

BMT consulted with a range of stakeholders and the extent of this consultation was left to the discretion of BMT.  It should be remembered that the Peer Review was not intended to redo the flood study.  Its aim is to test the process followed and the outcomes reached in the FRMSP and plan. While Council did not dictate the stakeholders which were consulted by BMT, Council did ensure that the North Wagga Residents Association had direct input and consultation with BMT.

 


 

Preliminary Report

 

In September 2021 a Preliminary report from BMT was submitted to Council.  The reason for this being a Preliminary report is that BMT reached the point in their assessment that they needed a range of issues to be addressed before they could answer the key question in their scope of work which was: (5) Determine if there is a cause to reasonably conclude that a flood protection levee greater than a 5% AEP level of protection should be considered in the feasibility study.

 

The Preliminary Report issued by BMT identified several issues which BMT stated should be addressed to enable them to answer this question. WMAWater were provided with the Preliminary Report to provide some interim comment, however it was noted that BMT and WMA had not yet consulted directly with each other in relation to the matter. At the 27 September 2021 Ordinary Council Meeting it was resolved:

 

That Council:

 

a       receive and note the Preliminary Report of the Peer Review of the Wagga Wagga Floodplain Risk Management Study & Plan

 

b       receive and note the initial response from WMAwater Pty Ltd (WMA) and request that they formally respond to the Preliminary Report

 

c       request a copy of the submission prepared on behalf of the North Wagga Residents Association submitted to BMT for consideration in the development of the Peer Review

 

d       direct Council officers to arrange for BMT and WMA to meet between themselves to clarify the issues identified in their respective reports to exclude any issues capable of explanation by agreement between the consultants

 

e       direct Council officers if necessary, to request the Department of Planning, Industry and Environment (Environment, Energy and Science) to review the BMT Peer Review and the WMA response and provide Council with a way forward with regard to this matter.

 

f        following the clarification process identified in (d) above, direct Council officers to instruct WMA to attend to the work which is required for BMT to complete the scope of work and produce a Final Report which answers all questions in the brief

 

g       following receipt of the Final Report as identified in (f), direct Council officers to arrange a meeting of the Floodplain Risk Management Advisory Committee (FRMAC), including the members of the North Wagga Residents Association to review the report and recommend the next steps

 

h       receive a further report which includes the Final Report of BMT and the recommendation from the FRMAC

 


 

Final Report

 

Responses to Initial Peer Review Findings

 

Below is a summary of the timeline of additional responses received by BMT following documentation of the Preliminary Report:

 

23 November 2021

Council provided BMT with WMAwater’s responses to potential issues identified in the initial findings of the peer review.

23 November 2021

Council provided BMT with clarification from Mr Steve Manwaring of DPIE on a number of items.

19 January 2022

BMT provided a response to the additional information and clarification provided by both WMAwater and DPIE (outlined in the points above).

23 February 2022

Peer review meeting was attended by representatives from Council, WMAwater and BMT. The purpose of this meeting was to discuss any outstanding peer review items (at that time). At this meeting, BMT and WMAwater agreed on the additional information required to be provided to BMT by WMAwater for review to potentially close-out outstanding issues and enable finalisation of the peer review.

21 April 2022

Council provided BMT with WMAwater’s final written responses relating to outstanding peer review issues.

 

Conclusions of the Final Peer Review Report

 

Below is an extract of the Conclusions of the Peer Review Finalisation as per page ii of the attached Final Peer Review Report:

 

Following final review of all additional inputs and responses provided by WMAwater and DPIE, BMT can close out the final phase of our work on the peer review. However, in their final response WMAwater noted an action to prepare an addendum to the FRMS&P 2018 report (which will include this peer review report) with the aim to clarify details for a number of potential issues (refer Table 1 for further detail). Thus, there is future action to be undertaken by WMAwater to close out their work related to the peer review.

 

One of the objectives of the peer review was to determine if there is cause to reasonably conclude that a flood protection levee greater than 5% AEP level of protection for the North Wagga Levee should be considered in the feasibility study. It is a conclusion of the peer review that no such cause was identified. The information in the FRMS&P 2018, together with the outcomes of the peer review, is sufficient to reasonably determine that a 5% AEP level of protection, rather than a 1% AEP level of protection, be recommended for future investigation.

 

It is noted that, on balance, the additional information and updated outputs provided by WMAwater do not materially change the outcomes of the study.

 

In particular, the ranking of options in the multi-criteria assessment (MCA) is predicted to remain largely consistent with that documented in the FRMS&P 2018 based on an assessment of sensitivity of rankings of proposed North Wagga Levee options (i.e. Options L3(A) to L6) completed as part of BMT’s review of final written responses from WMAwater. This assessed the sensitivity of rankings to:

 

·     equal weighting of all MCA criteria (i.e. no double weighting of “Risk to Life” undertaken by halving the “Risk to Life” score in the MCA);

·     removal of certain MCA criteria that may potentially be double counted, including separately removing “Risk to Life”, “Impact on SES” and “Impact on Property Damages”;

·     both equal weighting of all MCA criteria (as outlined in the point above) and removal of the criterion “Impact on SES”; and

·     both equal weighting of all MCA criteria (as outlined in the point above) and removal of the criterion “Impact on Property Damages”.

 

More specifically, Option L4(B) (i.e. 5% AEP North Wagga Levee upgrade with Hampden Avenue upgrade

and conveyance improvements through Wilks Park) ranks most favorably of all the North Wagga Levee options assessed in the FRMS&P 2018 (noting that it still has a negative score in the MCA). This ranking is consistent not only in the FRMS&P but always in the outcomes of the sensitivity assessments listed above. Therefore, it is considered reasonable that Option L4(B) has been recommended for future investigation in the Floodplain Risk Management Plan documented in the FRMS&P 2018. It is also considered reasonable that it forms the preferred levee option considered for North Wagga in a more detailed feasibility study.

 

However, as discussed throughout this report and outlined in the ‘Floodplain Development Manual’ (2005), the responsibility for the decision to proceed with any flood risk management option initially rests with the FRMAC and ultimately rests with Council. Therefore, the City of Wagga Wagga, in consultation with the FRMAC, make the final decision which proposed options, if any, to pursue as part of future work.

 

Next Steps

 

It is recommended that the final Peer Review be added as an addendum to the 2018 FRMS&P, and that Council immediately recommences the original Feasibility Study for Flood Mitigation Options for North Wagga and Surrounding Floodplain Area (Feasibility Study) as previously constituted. The Feasibility Study was put on hold pending the finalisation of the Peer Review.

 

Council staff will review the communication and engagement strategy for the Feasibility Study to ensure that it is current and meets the needs of the local community. It is also recommended that Council seek expressions of interest from members of the North Wagga community to act as subcommittee members for the life of the Feasibility Study project. However, this process is subject to the Floodplain Risk Management Advisory Committee and Council receiving a further report regarding the process of appointment, terms of membership and termination for co-opted members.

 


 

Financial Implications

Project name

Total Project Budget

Expended + Committed as at 17 August 2022

Total Project Budget

Flood Mitigation Option Feasibility Study for North Wagga & Floodplain Residents 

FM-0071 - (19555)

$234,000

$241,046

($7,046)

 

The initial grant for the North Wagga Flood Mitigation Investigation was $234,000. The initial quote provided by the successful consultant was $175,586.

 

Council were initially going to fund the Peer Review from existing budgets, however with the quote for the North Wagga Flood Mitigation Investigation coming in under budget a request was made to DPIE to utilise this unspent money to finance the Peer Review. This request was approved by DPIE and the Peer Review has been funded from within the original grant from DPIE.

 

At this point in time, Council has expended $53,886 on the Peer Review.

Policy and Legislation

Floodplain Development Manual (2005)

 

Link to Strategic Plan

The Environment

Objective: Create and maintain a functional, attractive and health promoting built environment

Outcome: We look after and maintain our community assets

 

Risk Management Issues for Council

Floodplain Development Manual (2005)

Internal / External Consultation

BMT consulted with a range of stakeholders in developing the Preliminary Report. The Preliminary Report was presented to the FRMAC meeting held on 2 September 2021, a Councillor Workshop on 20 September 2021 and the Council Meeting held 27 September 2021.

 

Various discussions and meetings were held between September 2021 and June 2022 (these are outlined above under the “Responses to Initial Peer Review Findings” heading). The Final Report was presented to the FRMAC meeting held on 7 July 2022 and a Councillor Workshop was held on 25 July 2022.

 


 

Attachments

 

1.

Peer Review of the 2018 Floodplain Risk Management Study and Plan (FRMS&P) - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-2

 

RP-2               Planning Proposal (LEP21/0004) Cleek Street, Currawarana - Amendment to Minimum Lot Size of the Wagga Wagga Local Environmental Plan 2010

Author:         Chloe Boyd 

Executive:    Scott Gray

         

 

Summary:

At its Ordinary Meeting on Monday 21 March 2022, Council resolved to support LEP21/0004 and seek a Gateway Determination from the NSW Department of Planning and Environment.

 

The planning proposal sought to amend the minimum lot size provisions for land located on 46 Cleek Street, Currawarna from 200ha to 2ha. On assessment, it was recommended to expand the reduction in minimum lot size to 60 Cleek Street and 15 Thomas Street, Currawarna to reflect the existing lot size pattern.

 

Council received a Gateway Determination on 16 May 2022, authorising the planning proposal to proceed, subject to public exhibition.

 

The planning proposal was placed on public exhibition from 18 June 2022 to 29 July 2022 (inclusive).

 

The purpose of this report is to provide feedback on the public consultation and submissions received. The report also requests adoption and gazettal of the amendment to the Wagga Wagga Local Environmental Plan 2010.

 

 

Recommendation

That Council:

a       note the results of the public exhibition for planning proposal LEP21/0004

b       adopt planning proposal LEP21/0004 to amend the Wagga Wagga Local Environmental Plan 2010; and

c        gazette the plan and notify landowners, submitters and the NSW Department of Planning and Environment of the decision

 

Application Details

Submitted Proposal:

Council received a planning proposal (LEP21/0004) to reduce the minimum lot size from 200 hectares to 2 hectares for land located at 46 Cleek Street, Currawarna.

Council Revisions:

Council’s assessment of the planning proposal resulted in a recommendation for an addendum to the planning proposal. This involved extending the change in minimum lot size to 60 Cleek Street and 15 Thomas Street, Currawarna, the two lots adjoining 46 Cleek Street to the west.

Applicant:

Kristen Roberts

Landowners:

Refer to confidential attachment (Attachment 1).

 

Proposal

Council is in receipt of a planning proposal to amend the Wagga Wagga Local Environmental Plan 2010 (LEP) to reduce the minimum lot size from 200 hectares to 2 hectares at three sites in Currawarna (see Attachments 2 and 3).

 

The purpose of the planning proposal is to allow a dwelling to be approved at 46 Cleek Street and 15 Thomas Street, Currawarna, respectively.

 

Changes proposed in the application would be achieved by amending the minimum lot size map to reflect the outcomes shown in Figure 1.

 

Figure 1: Proposed amendments.

Gateway Determination

The NSW Department of Planning and Environment issued a Gateway Determination for the planning proposal on 16 May 2022. A copy of the Gateway Determination is provided at Attachment 4.

 

Public Exhibition and Agency Consultation

The planning proposal and accompanying exhibition material were placed on public exhibition from 18 June 2022 to 29 July 2022 (inclusive). No agency referrals were required, pursuant to the Gateway Determination.

 

During the submission period, two (2) submissions were received (Attachment 5). A summary of key issues raised in submissions and a response is provided under Internal/External Consultation below.

Financial Implications

In accordance with Council’s 2021/22 Fees and Charges, a Standard LEP Amendment fee of $16,000 applied at the time of the application being submitted. The proponent has paid these fees.

 


 

It is anticipated that the LEP amendment will result in an additional two dwelling applications in the future. Council’s contributions plan enables Council to levy contributions and developer charges based on the likely increased demands that the new development will have.

Policy and Legislation

Environmental Planning and Assessment Act 1979

Environmental Planning and Assessment Regulation 2000

Wagga Wagga Local Strategic Planning Statement 2020

Wagga Wagga Local Environmental Plan 2010

Link to Strategic Plan

The Environment

Objective: We plan for the growth of the city

Outcome: We have sustainable urban development

 

Risk Management Issues for Council

The planning proposal process requires consultation and engagement with affected landowners and the wider community to understand concerns. Further concerns can be raised at the development application stage and will be considered at that time.

Internal / External Consultation

During the public exhibition period, two (2) submissions were received. The submissions are provided as Attachment 5. The public exhibition occurred from 18 June 2022 to 29 July 2022 (inclusive).

 

A summary of the issues raised and a response to each are provided below:

 

No.

Submission

Officer Response

1

·    Object to proposal as we do not want our rates going up.

·    Everyone else we have spoken to in Cleek St is also objective towards it.

·    Rates are determined by property values and where property values increase, rates can change. The impact on property values is not a planning related consideration and cannot be considered as relevant grounds to refuse a planning proposal. The Valuer General determines land value based on ‘highest and best permitted use’ and, in most cases, this is based on current zoning and planning restrictions. Land value is on land only and not the value of structures on the land.

 

2

·    Notes the subject land is located within an area previously identified for development in the current LSPS.

·    The proposed sites have the potential for ongoing productive agriculture or are close to draft State Significant Agricultural Land.

·    As there are no land use strategies providing guidance on non-agricultural land use developments on rural land for the Wagga Wagga LGA, DPI is concerned about ongoing expansion of residential, large lot and rural residential developments creating land use conflicts and impacting on the viability of agricultural enterprises around the council area.

·    The subject site is located on land identified as suitable for growth in the LSPS, demonstrating the proposal has strategic merit.

·    The proposal will not prevent the use of the land for some agricultural uses and two lots provide a buffer between the site and the draft State Significant Agricultural Land.

·    As outlined in the LSPS, Council is working towards preparing a Rural Lands Strategy, which will assist in managing agricultural land and other competing uses. Council’s LSPS also provides principles to manage agricultural land and housing. The subject proposal aligns with Council’s LSPS and the growth area identified for Currawarna.

 

The planning proposal and associated exhibition material were made available on Council’s Connect Wagga page: https://connect.wagga.nsw.gov.au/cleek-street

 

During the exhibition period, the page received interest relative to the simplicity of the planning proposal, as shown in Figure 2 below.

 

A picture containing line chart

Description automatically generated

 

Figure 2: Connect Wagga page statistics.


 

 

 

 

Mail

Media

Community Engagement

Digital

Rates notices insert

Direct mail

Letterbox drop

Council news story

Council News advert

Media releases

TV/radio advertising

One-on-one meetings

Your Say website

Community meetings

Stakeholder workshops

Drop-in sessions

Surveys and feedback forms

Social media

Email newsletters

Website

Digital advertising

TIER

Consult

 

 

x

 

 

 

x

 

 

 

 

x

 

 

 

Attachments

 

1.

LEP21/004 - Cleek St, Currawarna - Owners Details

This matter is considered to be confidential under Section 10A(2) of the Local Government Act 1993, as it deals with: personnel matters concerning particular individuals. - Provided under separate cover

 

2.

LEP21/0004 - Cleek St, Currawarna - Planning Proposal - Provided under separate cover

 

3.

LEP21/0004 - Cleek St, Currawarna - Planning Proposal Addendum - Provided under separate cover

 

4.

LEP21/004 - Cleek St, Currawarna - Gateway Determination - Provided under separate cover

 

5.

LEP21/004 - Cleek St, Currawarna - Combined Submissions - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-3

 

RP-3               PLANNING PROPOSAL (LEP21/0005) 77 GURWOOD STREET - ADDITIONAL PERMITTED USE

Author:          Siobhan Nielsen 

Executive:    Scott Gray

         

 

Summary:

At the Ordinary Meeting of Council on 21 March 2022, Council resolved to support a planning proposal and seek Gateway Determination from the NSW Department of Planning and Environment.

 

The planning proposal sought to amend Wagga Wagga Local Environmental Plan 2010 to include ‘office premises’ as an additional permitted use in Schedule 1 of the Wagga Wagga Local Environmental Plan 2010 for 77 Gurwood street, Wagga Wagga.

 

Council received a Gateway Determination from the NSW Department of Planning and Environment on 12 May 2022 to proceed with the above-mentioned planning proposal subject to public exhibition.

 

The planning proposal was placed on exhibition from 4 June 2022 to 15 July 2022 (inclusive).

 

The purpose of this report is to provide feedback on the public consultation and submissions received. The report also requests adoption and gazettal of the amendment to the Wagga Wagga Local Environmental Plan 2010.

 

 

Recommendation

That Council:

a       note the results of the public exhibition for planning proposal LEP21/0005

b       adopt planning proposal LEP21/0005 (as exhibited) to amend Wagga Wagga Local Environmental Plan 2010

c        gazette the plan and notify landowners and NSW Department of Planning and Environment of the decision

 

Application details

Submitted proposal:

To amend Wagga Wagga Local Environmental Plan 2010 to include ‘office premises’ as an additional permitted use in Schedule 1 of the Wagga Wagga Local Environmental Plan 2010 for 77 Gurwood street, Wagga Wagga.

Applicant:

The Planning Hub

Director - Jeremy Swan

Director – Mairead Hawes

Landowners:

Refer to confidential Attachment 9

Proposal

 

Council is in receipt of a planning proposal (Attachment 1) to amend Wagga Wagga Local Environmental Plan 2010 (LEP) to add ‘office premises’ as an additional permitted use for 77 Gurwood Street, Wagga Wagga.

 

The purpose of the planning proposal is to allow the future use of the site as office premises.

 

Changes proposed in the application would be achieved by amending Schedule 1 of the LEP to include ‘office premises’ as an additional permitted use at 77 Gurwood Street, Wagga Wagga.

 

Site and Locality

The site is the former Wagga Wagga Commercial Club premise located at 77 Gurwood Street, Wagga Wagga. The site is zoned RE2 Private Recreation which is consistent with the previous use as a Commercial Club.

 

Gateway Determination

The NSW Department of Planning and Environment issued a Gateway Determination for the planning proposal subject to public exhibition. A copy of the Gateway Determination is provided as Attachment 4.

 

In response to the conditions of the Gateway Determination, an Addendum was prepared to include a zoning map, additional information on the options to achieve the objectives of the proposal, a project timeframe, and other minor amendments.

 

Public Exhibition

The planning proposal (Attachment 1) and accompanying exhibition material were placed on public exhibition from 4 June 2022 to 15 July 2022 (inclusive).

 

During the exhibition period, no submissions were received.

 

Financial Implications

In accordance with Council’s 2021/22 Fees and Charges, a Standard LEP Amendment Fee of $16,000.00 applied at the time of the application being submitted. The proponent has paid these fees.

 

It is anticipated that the LEP amendment will result in a change of use of the subject site and building in the future. Council’s contribution plans and development servicing plans enable Council to levy contributions and developer charges based on the likely increased demands that the new development will have on public facilities, sewer and/or stormwater.


 

Policy and Legislation

Environmental Planning and Assessment Act 1979

Wagga Wagga Local Strategic Planning Statement – Wagga Wagga 2040

Wagga Wagga Local Environmental Plan 2010

 

Link to Strategic Plan

The Environment

Objective: We plan for the growth of the city

Outcome: We have sustainable urban development

 

Risk Management Issues for Council

The planning proposal was subject to public consultation where no objections were received against the proposal. The consultation shows a general level of support from nearby landowners.

Internal / External Consultation

The planning proposal was placed on public exhibition between 4 June 2022 to 15 July 2022 (inclusive) with engagement as per the table below:

 

 

Mail

Media

Community Engagement

Digital

Rates notices insert

Direct mail

Letterbox drop

Council news story

Council News advert

Media releases

TV/radio advertising

One-on-one meetings

Your Say website

Community meetings

Stakeholder workshops

Drop-in sessions

Surveys and feedback forms

Social media

Email newsletters

Website

Digital advertising

TIER

Consult

 

x

 

x

 

 

x

 

 

 

x

x

 

 

 

The planning proposal and accompanying exhibition material were made available for viewing by the public on Council’s website, on the online Planning Portal, and at Council’s Customer Service Counter in the Civic Centre between 4 June 2022 to 15 July 2022 (inclusive). Notices were provided to affected and adjoining landowners.

 

During the public exhibition period, no submissions were received.

 

The Visitors Summary for Connect Wagga showed a total of 31 visitors.

 


 

Attachments

 

1.

LEP21/0005- Planning Proposal Application - Provided under separate cover

 

2.

LEP21/0005 - Assessment Report - Provided under separate cover

 

3.

LEP21/0005 - Addendum - Provided under separate cover

 

4.

LEP21/0005 - Gateway Determination - Provided under separate cover

 

5.

LEP21/0005 - Existing Site Plan - Provided under separate cover

 

6.

LEP21/0005 - Acoustic Statement - Provided under separate cover

 

7.

LEP21/0005 - Traffic and Transport Assessment - Provided under separate cover

 

8.

LEP21/0005 - Planning Proposal Checklist - Provided under separate cover

 

9.

LEP21/0005 - Landowners

This matter is considered to be confidential under Section 10A(2) of the Local Government Act 1993, as it deals with: personnel matters concerning particular individuals. - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-4

 

RP-4               Planning Proposal (LEP21/0006) 7066 Holbrook Road, Rowan - Amendment to land zoning, minimum lot size and urban release area provisions of the Wagga Wagga Local Environmental Plan 2010

Author:          Crystal Atkinson 

Executive:    Scott Gray

         

 

Summary:

Council is in receipt of a planning proposal to amend the Wagga Wagga Local Environmental Plan 2010 to achieve the following:

1.   Rezone land from RU1 Primary Production and R5 Large Lot Residential to R1 General Residential, R5 Large Lot Residential, B2 Local Centre and RE1 Public Recreation

2.   Remove the minimum lot size of 200 hectares from proposed R1, B2 and RE1 proposed areas and reduce the minimum lot size from 200 hectares to 4,000m² for the proposed R5 area

3.   Introduce urban release area provisions

The purpose of this planning proposal is to provide additional residential land immediately adjoining the existing large lot residential area. The site is located directly south of the Springvale large lot residential area and directly west of another planning proposal under consideration. The land is currently zoned RU1 Primary Production and used for agricultural purposes.

 

 

Recommendation

That Council:

a       provide in principle support for planning proposal LEP21/0006 to amend the Wagga Wagga Local Environmental Plan 2010 land zoning, minimum lot size and urban release area provisions

b       prepare an addendum to the application to address statutory requirements and site-specific matters

c        request the proponent prepare and submit a biodiversity development assessment report, which includes offsets and impacts on future public land

d       prepare an amendment to the Wagga Wagga Development Control Plan that covers LEP21/0001 and LEP21/0006 to demonstrate high-level structure planning and incorporate site-specific controls

e       continue preparations of a contribution framework to fund identified infrastructure upgrades for the Southern Growth Area

f        require a further report to be prepared seeking endorsement to submit the planning proposal for Gateway Determination once the information identified in (b) above is received and items (c) and (d) are completed

g       prepare a high-level structure plan for the remaining growth area and infill corridor to coordinate development outcomes across both urban releases

h       not consider any planning proposals within this area until this structure planning is complete

 


 

Application details

Submitted planning proposal:

Council is in receipt of a planning proposal (LEP21/0006) to rezone land at 7066 Holbrook Road, Rowan from RU1 Primary Production and R5 Large Lot Residential to R1 General Residential, R5 Large Lot Residential, B2 Local Centre and RE1 Public Recreation and remove the minimum lot size from proposes R1, B2 and RE1 areas and reduce the minimum lot size from 200 hectares to 4,000m².

Applicant:

DevCore Property Group

on behalf of

Rowan Village Pty Ltd

Director – Paul John Thompson

Director – Benjamin Frederick Hogan

Landowners:

Refer to confidential attachment

 

Proposal

Council is in receipt of a planning proposal to amend Wagga Wagga Local Environmental Plan 2010 to achieve the following:

 

1.    Rezone land from RU1 Primary Production and R5 Large Lot Residential to R1 General Residential, R5 Large Lot Residential, B2 Local Centre and RE1 Public Recreation

2.    Remove the minimum lot size of 200 hectares from proposed R1, B2 and RE1 areas and reduce the minimum lot size from 200 hectares to 4,000m² for the proposed R5 area

3.    Introduce urban release area provisions

 

The purpose of the planning proposal is to provide additional residential land immediately adjoining the existing large lot residential area of Springvale and directly west of another planning proposal under consideration. The land is currently under consideration.

 

This proposal relates to land identified as 7066 Holbrook Road, Rowan. The site is located east of Holbrook Road and is a direct southern extension of the Springvale large lot residential area located on Lloyd Road, Springvale and a direct western extension of the Sunnyside proposal.

 

The intended outcome of this proposal is to establish approximately 2,100 residential lots, neighbourhood shops and open space corridors.

 

The planning proposal is accompanied by an Urban Design Report providing a vision, site analysis and master plan for the subject site and the adjoining Sunnyside site. The master plan overview is shown in Figure 1.

Graphical user interface, map

Description automatically generated

Figure 2: Master Plan Overview Source: Planning Proposal, Urbis

 

Background

At the Ordinary Meeting of Council on 11 October 2021, Council resolved to support the Sunnyside proposal (report and minutes attached):

 

That Council:

a.   provide in principle support for planning proposal LEP21/0001 to amend the Wagga Wagga Local Environmental Plan 2010 land zoning, minimum lot size and urban release area provisions

b.   prepare an addendum to the application to address statutory requirements and site-specific matters

c.   prepare an amendment to the Wagga Wagga Development Control Plan 2010 to incorporate site-specific controls relevant to the site to be exhibited alongside the planning proposal

d.   require infrastructure servicing plans to be prepared and supported by a defined infrastructure contributions framework that identifies infrastructure upgrades and funding to be exhibited alongside the planning proposal

e.   receive a further report for endorsement of items (b), (c) and (d) above prior to submission to NSW Department of Planning, Industry and Environment for Gateway Determination

Key Considerations

A review of the planning proposal indicates that the site has strategic merit with several key matters required to be addressed before the planning proposal is submitted for a Gateway Determination.

 


 

It is considered the site has strategic merit based on the following:

 

1.    The site can be developed to provide residential accommodation to meet the projected population growth identified in Council’s adopted Local Strategic Planning Statement (LSPS).

2.    The site is a direct extension of the existing large lot urban area.

3.    The site is low agricultural grade and not identified as Significant Agricultural Land.

 

Providing ‘in principle’ support based on strategic merit and seeking further details to demonstrate site specific merit is consistent with the approach taken with Sunnyside development. This approach will provide ‘in-principle’ support prior to seeking further detailed investigations and studies and is intended to seek better outcomes and provide more certainty for Council and the community. For all major planning proposals that require detailed investigations and studies, this process will be adopted.

 

Coordination of Planning Proposals

 

This planning proposal and planning proposal LEP21/0001 are adjoining and having both proposals lodged and not yet submitted to Gateway, provides an opportunity to coordinate planning outcomes for the Southern Growth Area. The planning proposal locations and Southern Growth Area extent is shown in figure 2.

 

Map

Description automatically generated

Figure 2: Southern Growth Area Source: Prepared by Staff

 

A key outcome of this proposal is the vision for general residential in the southern growth area rather than the large lot residential approach proposed by LEP21/0001. General residential will facilitate more efficient provision of infrastructure and avoid the long-term management of intensification of a large lot residential area in the future. The existing large lot residential fringe on the southern boundary of the city continues to place pressures on Council to consider intensification and manage infrastructure upgrades to support this intensification. Proposing general residential within the Rowan Village area will avoid this.

 

With both planning proposals being lodged, forward planning for the southern growth area is now critical with this planning proposal providing an opportunity for Council to direct growth outcomes for this site. The urban design report for this proposal has considered the current proposal for LEP21/0001 and shown connectivity and coordination across both sites.

 

Sewer, stormwater and traffic modelling is currently being finalised to inform the contributions framework for the southern growth area.

 

Future Planning

 

Whilst this planning proposal provides the opportunity to prepare a planning framework for the urban release area between Plumpton and Holbrook Roads, the broader growth area will need forward planning to ensure we can consider how development will occur over time. Council is already receiving enquiries about infill in the area to capitalise on the infrastructure planning undertaken for these proposals. Continued ad-hoc planning of multiple infill areas will place added resourcing pressures on Council.

 

It is proposed to seek a budget variation to fund structure planning for the remaining southern growth area that links in with the work done as part of this planning proposal.

Conclusion

The planning proposal has demonstrated strategic planning merit and is consistent with the vision and outcomes provided in the LSPS.

 

There are additional pieces of work that need to be completed prior to providing full support and submitting for a Gateway Determination. This is a shift in focus and emphasis on infrastructure design, provision, and financing to provide Council and the community with more certainty and understanding of the impacts and implications of the proposal. This will require financial investment and resourcing from the proponent to undertake this work. It is considered ‘in-principle’ approval from Council will provide evidence of Council’s support to proceed with the further investigations.

Financial Implications

In accordance with Council’s 2020/21 Fees and Charges, a Major LEP Amendment has a total application fee of $44,000.00. The proponent has paid these fees.

 

It is anticipated the LEP amendments will result in new development on the subject land in the future. This has financial implications for Wagga Wagga City Council.

 

Contribution and development servicing plan addendums will be required for any future development of the land. These addendums will be developed and exhibited alongside the planning proposal.

 

To ensure we can adequately plan for growth and development, a budget variation to fund structure planning will need further consideration on the budget implications. However, this up-front planning will provide greater certainty on infrastructure requirements to inform long-term financial planning.


 

Policy and Legislation

Environmental Planning and Assessment Act 1979

Wagga Wagga Local Strategic Planning Statement – Wagga Wagga 2040

Wagga Wagga Local Environmental Plan 2010

 

Link to Strategic Plan

The Environment

Objective: We plan for the growth of the city

Outcome: We have sustainable urban development

 

Risk Management Issues for Council

The planning proposal has been assessed has been identified to have strategic merit. Further studies and work may raise issues not previous identified.

 

Placing a moratorium on planning proposal may cause community criticism that we are delaying the release of land for housing.

Internal / External Consultation

A Councillor workshop on this Planning Proposal was held on 20 June 2022.

 

Full consultation details and a consultation plan will be reported back to Council along with a proposed DCP amendment and addendum to existing city-wide contributions plans.

 

 

Attachments

 

1.

LEP21/0006 - Planning Proposal Report - Provided under separate cover

 

2.

LEP21/0006 - Urban Design Report - Provided under separate cover

 

3.

LEP21/0006 - Draft Site Specific DCP - Provided under separate cover

 

4.

LEP21/0006 - Landscape Masterplan - Provided under separate cover

 

5.

LEP21/0006 - Site Survey - Provided under separate cover

 

6.

LEP21/0006 - ACHA & Cultural Values Assessment - Provided under separate cover

 

7.

LEP21/0006 - Heritage Impact Statement - Provided under separate cover

 

8.

LEP21/0006 - Ecological Assessment - Provided under separate cover

 

9.

LEP21/0006 - Strategic Bushfire Study - Provided under separate cover

 

10.

LEP21/0006 - Site Stormwater Managment Strategy - Provided under separate cover

 

11.

LEP21/0006 - Preliminary Site Investigation - Contamination - Provided under separate cover

 

12.

LEP21/0006 - Desktop Geotechnical Assessment - Provided under separate cover

 

13.

LEP21/0006 - Services Infrastructure Assessment - Provided under separate cover

 

14.

LEP21/0006 - Residential and Retail Market Demand Assessment - Provided under separate cover

 

15.

LEP21/0006 - Social Infrastructure Assessment - Provided under separate cover

 

16.

LEP21/0006 - Transport Impact Assessment - Provided under separate cover

 

17.

LEP21/0006 - Sewer System Assessment - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-5

 

RP-5               Administrative Changes to Wagga Wagga Development Control Plan 2010

Author:          Crystal Atkinson 

Executive:    Scott Gray

         

 

Summary:

This report recommends administrative changes to the Wagga Wagga Development Control Plan 2010.

 

The proposed changes will:

1.   Reorder controls within Section 10, Business Development for the B6 Enterprise Corridor to clarify what controls apply to all precincts and what site-specific controls apply to Precinct 7 only

2.   Identify a repeal of the Bomen Urban Release Area chapter upon commencement of the State Environmental Planning Policy (Precincts – Regional) 2021, Schedule 1A Wagga Wagga Activation Precinct and Bomen SAP Delivery Plan.

3.   Update references to Environmental Zones throughout the Wagga Wagga Development Control Plan 2010 and notify the amendments to be in force from 14 days of the notice being provided.

4.   Update references to employment zones upon commencement of the Employment Zone reforms and notify the amendments to be in force from 14 days of the notice being provided.

 

 

Recommendation

That Council:

a       support the administrative amendments to the Wagga Wagga Development Control Plan 2010

b       endorse the amendments as administrative only, not requiring public exhibition

c        adopt the proposed changes to Section 10, Business Development to be effective from 14 days of the changes are notified

d       adopt the repeal of Section 13, Bomen Urban Release Area to be effective upon commencement of the State Environmental Planning Policy (Precincts – Regional) 2021, Schedule 1A Wagga Wagga Activation Precinct and 14 days from when the changes are notified

e       adopt the changes to Environmental Zones references throughout the Wagga Wagga Development Control Plan 2010 and notify the amendments to be effective 14 days from the notice being provided

f        adopt the changes to references to employment zones upon commencement of the Employment Zone reforms and notify the amendments to be effective 14 days from the notice being provided

 


 

Section 10, Business Development

Section 10 of the Wagga Wagga Development Control 2010 provides controls for development for the following:

 

10.1    City Centre

10.2    Mixed use development

10.3    Local centres

10.4    Neighbourhood Shops

10.5    Business Development Zone

10.6    Enterprise Corridor Zone

10.7    Awning Controls

10.8    Morgan, Murray, and Forsyth Streets Mixed Use Precinct

 

The proposed amendments relate to Section 10.6, Enterprise Corridor zone.

 

Specifically, the amendment seeks to relocate the additional controls for Precinct 7 to sit underneath the general controls for all development withing the Enterprise Corridor Zone as shown in attachment 1.

 

Section 13, Bomen Urban Release Area

The Wagga Wagga Special Activation Precinct Master Plan came into effect on 21 May 2021 to capitalises on the Inland Rail Project, bringing manufacturing, agribusiness, and freight and logistics in Wagga Wagga.

 

During the exhibition of the Master Plan, a discussion paper detailing the Explanation of Intended Effect of an amendment to the State Environmental Planning Policy (Activation Precincts) 2020 (SEPP) was also exhibited to facilitate the Wagga Wagga Special Activation Precinct coming into effect upon completion of a Delivery Plan.

 

Stage 1 of the Delivery Plan was approved on 1 August 2022 enabling the SEPP to come into effect. The SEPP, Schedule 1A identifies that the Wagga Schedule will come into effect on 30 September 2022. Upon coming into effect, the Wagga Wagga Local Environmental Plan 2010 (LEP) and Wagga Wagga Development Control Plan 2010 will no longer apply to the Bomen Special Activation Precinct. The LEP will automatically be updated by NSW Department of Planning and Environment and the DCP Bomen Chapter will be repealed upon notification by Council.

 

Environment zones renamed

The NSW Government recently renamed the ‘environment zones’ as the name was too broad and open to multiple interpretations, which can cause confusion about the purpose and intent of the zone.

 

The renaming reflects ‘conservation’ land use function more clearly, the focus, purpose, and intent of these zones is clearly signalled with the renaming. The purposes of the zones are to conserve the environmental values and natural qualities in areas where this land use zoning is applied. The naming also aligns better with the objectives of the zones as being about conservation.

 

The renaming is purely administrative and of name only. Land uses that are permitted and prohibited remained unchanged. The changes have already been made to the Wagga Wagga Local Environmental Plan 2010 (LEP).

 

These changes will make administrative changes to the Wagga Wagga Development Control Plan 2010 to reflect the zone renaming completed in the LEP.

 

Employment zone reforms

The NSW Government are implementing employment zone reforms with the introduction of 5 new employment zones and 3 supporting zones into the Standard Instrument (Local Environmental Plans Order) 2006. The new employment zones will be in force within the Wagga Wagga Local Environmental Plan 2010 by 1 December 2022 when the existing Business and Industrial zones will be repealed.

 

The reforms are intended to have the following benefits:

 

·     A more legible suite of zones

·     Greater flexibility within the proposed zones

·     Vibrant and viable centres for communities

·     Support the city to develop and meet the operations needs of businesses and communities

·     Innovation for emerging land uses and unique precincts that require a flexible planning response

·     Managing industrial land use conflicts and amenity impacts

·     Responding to the changing nature of industry and business

·     Reduce need for a spot rezoning

·     Increase in jobs closer to homes reduces journey to work

·     Reduce administrative costs and complexity of future application processes

·     Greater business output potential

 

The transition in the Wagga Wagga Local Environmental Plan 2010 will see the following changes:

 

Existing Zone

New Zone

B1 Neighbourhood Centre

E1 Local Centre

B2 Local Centre

E1 Local Centre

B3 Commercial Core

E2 Commercial Centre

B4 Mixed Use

MU1 Mixed Use

B5 Business Development

E3 Productivity Support

B6 Enterprise Corridor

E3 Productivity Support

IN1 General Industrial

E4 General Industrial

IN2 Light Industrial

E4 General Industrial

 

The renaming impact on the Wagga Wagga Development Control Plan 2010 is purely administrative and will result in changes to references to zones and precinct that relate to land zoning. Once these changes are made to the Wagga Wagga Local Environmental Plan 2010 (LEP), notification will be provided that the respective amendments have been made to the DCP.

 

Amendment or repeal requirements for development control plans

The NSW Environmental Planning and Assessment Regulations 2000 include provisions for the amendment and repeal of a development control plan:

 

16     Amendment or repeal of development control plan

 

(1)     A council may amend a development control plan by a subsequent development control plan

 

(2)     A council may repeal a development control plan

 

a.      by a subsequent development control plan, or

b.      by publishing notice of a decision to repeal the plan on its website.

 

(3)     At least 14 days before repealing a development control plan under subsection (2)(b), the Council must publish notice of its intention to repeal the plan, and the reasons for the repeal, on its website.

 

(4)     The repeal of a development control plan under subsection (2)(b) takes effect on the day on which the notice under subsection (2)(b) is published on the council’s website.

 

Under these provisions, the amendments are proposed to occur with a 14-day newspaper and website notice only without community consultation.

 

Financial Implications

There are no known financial implications because of the proposed amendment.

Policy and Legislation

Environmental Planning and Assessment Act 1979

Environmental Planning and Assessment Regulation 2000

Wagga Wagga Local Environmental Plan 2010

Wagga Wagga Development Control Plan 2010

 

Link to Strategic Plan

The Environment

Objective: We plan for the growth of the city

Outcome: We have sustainable urban development

 

Risk Management Issues for Council

The extensive reforms will require a transition period for staff, developers, and the community to adjust to the changes despite them being of administrative nature only.


 

Internal / External Consultation

Consultation is not proposed as part of the changes as they are administrative in nature only.

 

 

Attachments

 

1.

Wagga Wagga Development Control Plan - Section 10 amendment - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-6

 

RP-6               Update to Fees and Charges to reflect amended Planning Proposal Guidelines

Author:         Chloe Boyd 

Executive:    Scott Gray

         

 

Summary:

This report proposes updates to part of Council’s Fees and Charges to reflect recent updates to the planning proposal process. These changes will align Council’s Fees and Charges to the current Department of Planning and Environment Local Environmental Plan Making Guideline, making it clearer for applicants to understand which fees apply to their planning proposal.

 

The changes will also recognise basic planning proposals that have minimal impacts and establish a fee for the new, formal pre-lodgement phase outlined by the Guideline.

 

The restructure of the LEP amendment fees will not result in an increase in the maximum possible fee for planning proposals, as the proposed new charges have been drawn from the existing phases and the costs redistributed to be no greater than they are currently.  

 

 

Recommendation

That Council:

a       place the following new fees and charges on public exhibition for a period from 23 August 2022 to 20 September 2022 (28 days):

Item No.

Fee Name

Pricing Policy ID

Year 21/22 Last Yr Fee

Fee

Year 22/23 GST

Total Fee

GST Applicable

Basis

Basic LEP Application

NEW

Scoping Proposal

E

NEW

$5,000

$0.00

$5,000

N

Each

NEW

Preparation/processing of planning proposal

E

NEW

$5,000

$0.00

$5,000

N

Each

NEW

Requires DCP amendment

E

NEW

$2,500

$0.00

$2,500

N

Each

Standard LEP Application

NEW

Scoping Proposal

E

NEW

$5,000

$0.00

$5,000

N

Each

0878

Lodgement

E

$8,000

$5,200

$0.00

$5,200

N

Each

0879

Preparation/processing of planning proposal

E

$8,000

$6,200

$0.00

$6,200

N

Each

0880

Requires DCP amendment

E

$8,000

$8,200

$0.00

$8,200

N

Each

Complex LEP Application

NEW

Scoping Proposal

E

NEW

$5,000

$0.00

$5,000

N

Each

0881

Lodgement

E

$23,000

$20,575

$0.00

$20,575

N

Each

0882

Preparation/processing of planning proposal

E

$23,000

$21,575

$0.00

$21,575

N

Each

0883

Requires DCP amendment

E

$23,000

$23,575

$0.00

$23,575

N

Each

 

b       invite public submissions on the proposed new fees and charges until 20 September 2022.

c        receive a further report following the public exhibition period:

i         addressing any submissions made in respect of the proposed new fees

ii        proposing adoption of the new fees and charges unless there are any recommended amendments that will require a further public exhibition period.

 

Report

1.    Introduction

In December 2021, the NSW Department of Planning and Environment released a revised Local Environmental Plan Making Guideline (Attachment 1). The Guideline provides a detailed explanation of the steps of the NSW Local Environmental Plan making process to assist and guide councils, communities, State agencies, proponents, and practitioners.  Following a review of the updated Guideline, Council has identified that two key changes to the fees and charges for LEP amendments would enhance the clarity and transparency of fees associated with the planning proposal process and better reflect the revised process established by the Department.

 

2.    Update 1 – Planning Proposal Categories

The first proposed update is to introduce a new category of LEP amendment into Council’s Fees and Charges. The December 2021 Guideline outlines four categories of planning proposals – basic, standard, complex and principal. Of these four categories, only the first three are undertaken by proponents and thus require fees.

 

Currently, Council’s Fees and Charges cater to two types of planning proposals – standard and complex. The definitions of these two categories have been historically developed by Council. However, the December 2021 Guideline provides clear parameters for each of the four categories of planning proposal. Aligning Council’s Fees and Charges to reflect these categories will make it clearer for both proponents and Council to identify the timeframes, requirements, resources and fees needed to undertake a planning proposal.

 

To effect this change, a new set of fees for Basic planning proposals will be introduced. The new Basic LEP Application fees will be the lowest and have only three phases, to reflect the minor nature of such applications. The other two categories will remain unchanged (beyond the second update below) but Council will now classify planning proposals received based on the parameters set by the Guideline and charge the fees accordingly.

 

3.    Update 2 – Introduction of Scoping Proposal fee

The second proposed amendment is to incorporate a ‘Scoping Proposal’ fee within all three planning proposal categories. The Guideline introduced a new initial stage within the process – the pre-lodgement stage. The pre-lodgement stage incorporates early meetings with Council and the submission of a scoping proposal. The scoping proposal outlines the intended outcomes for the site and identifies key issues, consultation and reports required, should the proposal progress to the next stage of the planning proposal process. The scoping proposal is prepared by the applicant and submitted to Council.

 

The scoping proposal is designed to allow Council and the applicant to identify and discuss key issues relating to the scoping proposal, to streamline any subsequent planning proposal. It also provides Council with the opportunity to identify where a proposal has no strategic or site-specific merit, ideally reducing the number of planning proposals in the system that will not be supported by Council. Council is required to provide written advice to the applicant on the scoping proposal, providing a clear opinion and progression pathway (should the proposal be supported). Council views the introduction of the pre-lodgement stage and scoping proposal as positive, as it enables frank and transparent dialogue with applicants before the lodgement of any planning proposal.

 

Council’s fees and charges require updating to reflect the introduction of the pre-lodgement stage. While only one scoping proposal has been received by Council thus far, undertaking this amendment now will ensure any future scoping proposals are captured within Council’s Fees and Charges.

 

The introduction of a scoping proposal fee within all three planning proposal categories will enable Council to levy a fee for the work required to undertake an initial assessment and provide written advice to the applicant. This should also ensure that any scoping proposals lodged with Council have been carefully considered prior to lodgement.

 

The pre-lodgement process has historically been provided free to all applicants on a more informal basis. The introduction of the fee and the process outlined in the Guideline will formalise the existing process. The opportunity for applicants to meet with Council and discuss potential scoping proposals will remain free-of-charge and unlimited in number.

 

4.    No increase on existing fees

While the updates would introduce a new fee to the two existing categories of planning proposals, the overall maximum fee for that type of planning proposal will not increase.

 

The $5,000 fee for scoping proposals in each category has been drawn from the fees for the existing planning proposal stages, redistributing the costs to ensure that the maximum possible charge does not change for applicants. This indicates that the scoping proposal adds to the planning proposal process, rather than adding an additional fee.

 

Figure 1 provides the calculations that demonstrate this.

 

Table

Description automatically generated

 

Figure 1: Comparison of existing and proposed fees and charges.

 

5.    Broader updates to complement the updated Fees and Charges

Council’s website will be updated to reflect the December 2021 Guidelines, to ensure clear messaging around the planning proposal process updates are provided to the community and applicants. Council’s internal processes will also be updated to allow easy and efficient implementation of the updated fees and lodgement of scoping proposals. This will ensure a holistic approach is undertaken to the updated planning proposal process, with the updates to Council’s Fees and Charges just one part of this approach.

 

Financial Implications

The introduction of a scoping proposal fee may reduce the overall number of planning proposals lodged and subsequent revenue, as the advice provided by Council will be clear on whether support is likely to be provided for the proposal.

 

It is noted that Council does not rely exclusively on income generated by planning proposals and the proposed changes will not alter the anticipated income from planning proposals each financial year. The number of planning proposals lodged each financial year varies and is difficult to predict.

 

The introduction of a basic planning proposal category will provide a more feasible option for applicants seeking a minor variation to Council’s Local Environmental Plan, subject to in-principle support being provided as part of the scoping proposal process.

Policy and Legislation

Environmental Planning and Assessment Act 1979

 

Local Government Act 1993

 

Chapter 15, Part 10, Division 1:

·   Section 608 Council fees for services

 

Chapter 15, Part 10, Division 2:

·   Section 610B Fees to be determined in accordance with pricing methodologies

 

Chapter 15, Part 10, Division 3:

·   Section 610D How does a council determine the amount of a fee for service?

·   Section 610F Public notice of fees

 

Local Government (General) Regulation 2005

Regulation 201 Annual statement of council’s revenue policy

 

 

Link to Strategic Plan

Community Leadership and Collaboration

Objective: City of Wagga Wagga services reflect the needs of the community

Outcome: The City of Wagga Wagga has efficient and effective processes

 

Risk Management Issues for Council

The provision of a fee for the scoping proposal phase may increase the number of scoping proposals received. This may place additional strain on existing Council resources.

 

The provision of a fee for the scoping proposal process may also mean less planning proposals are lodged, which may result in a loss of revenue for Council.

 

Updating Council’s Fees and Charges requires consultation with the community to understand any concerns they may have. Educating the community and industry about the proposed changes and guiding them through the process once the changes are finalised is an important but often resource-intensive task that may impact Council resourcing for a short period.


 

Internal / External Consultation

The proposed new fees will be publicly exhibited on Council’s website and in the local newspaper, seeking public submissions. Council will be available to have one-on-one discussions with any interested stakeholders during this time.

 

 

Mail

Media

Community Engagement

Digital

Rates notices insert

Direct mail

Letterbox drop

Council news story

Council News advert

Media releases

TV/radio advertising

One-on-one meetings

Your Say website

Community meetings

Stakeholder workshops

Drop-in sessions

Surveys and feedback forms

Social media

Email newsletters

Website

Digital advertising

TIER

Consult

 

 

 

x

 

 

 

 

 

 

 

x

 

 

 

Attachments

 

1.

Fees and Charges Update - Planning Proposal Process Updates - LEP Making Guidelines (DPE) - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-7

 

RP-7               RESPONSE TO NOTICE OF MOTION - SHADE SAILS OVER PLAYGROUNDS

Author:         Kadison Hofert 

Executive:    Scott Gray

         

 

Summary:

In March 2022 Council Strategic Recreation staff completed a shade audit of all 100 playgrounds across the Local Government Area. The shade audit was in response to a Notice of Motion on Shade Sails over Playgrounds at the 31 January Council Meeting.

 

 

Recommendation

That Council:

a       note the results of the playground shade protection audit

b       endorse the planting of 4 advanced trees at each playground within the Local Government Area

c        set as a benchmark a minimum of 40% of the playground area shaded at each playground in the Local Government Area

d       endorse staff applying for grant funding to install shade sails at an additional 26 playgrounds

e       approve the budget variation/s as detailed in the Financial Implication section of the report

 

Report

The Wagga City Council playground network boasts 100 playgrounds across the LGA. The 100 playgrounds consist of 58 local minor playgrounds, 28 local major playgrounds, 10 suburban playgrounds and 4 regional playgrounds (Attachment 1).

 

Playgrounds are an important community asset as they contribute to childhood development whilst also acting as community hubs that encourage interaction and community wellbeing.

 

In March 2022 Council Staff completed a shade audit of all playgrounds across the LGA that included consultation with stakeholders and shade structure suppliers to investigate the possibility of installing shade sails over every playground.

 

This shade audit was completed in response to a Notice of Motion endorsed by Council at the 31 January Council meeting which stated:

 

That Council receive a report auditing the degree of shade protection over all Wagga Wagga City Council (Council) owned playgrounds, and the costs of installing shade sails over all Council owned playgrounds, including but not limited to:

a       audit of Council playgrounds which:

i.    have a shade sail over the play equipment

ii.  have continual shading over the play equipment from tree canopies

iii. have minimal shading over the play equipment from tree canopies

iv. have no shade over the play equipment

v. have shade for carers who are sitting still

b            options for providing adequate shade in the short, medium, and long term to those playgrounds identified in the audit as not having sufficient shade

c            the cost of installing shade sails and the cost of planting mature trees over the playgrounds which have minimal or no shading over the play equipment (citing economies of scale when receiving quotes)

d            the process for introducing mandatory shade sail requirements for all future playgrounds (including ones currently being built) for playgrounds owned and maintained by Council

e            an investigation into alternate funding models for the cost of shade sails (for example, charity/corporate sponsorships or fundraisers)

 

To fully understand the type of shade at each playground the shade audit included the following six categories:

·  Shade sails over playground equipment

·  Continual shade over playground equipment from tree canopies

·  Partial shade over playground equipment

·  Minimal shade over playground equipment from tree canopies

·  No shade over playground equipment

·  Shade for carers sitting

 

The audit found that 19 playgrounds have shade sails over the whole or at least parts of the playground equipment. 7 playgrounds have continued shade over playground equipment from tree canopies, 29 playgrounds have partial shade over playground equipment whether this be natural shade from tree canopies or from shade structures. 34 playgrounds have minimal shade over playground equipment from tree canopies depending on the time of day, 29 playgrounds were found to have no shade over playground equipment and 90 playgrounds have shade for carers who are sitting whether this be natural shade from trees or shade from shade structures (Attachment 2&3).

 

The results from the shade audit are shown in the table below.

 

Category

Number of Playgrounds

Percentage %

Shade sails over playground equipment

19

19%

Continual shade over playground equipment from tree canopies

7

7%

Partial shade over playground equipment

29

29%

Minimal shade over playground equipment from tree canopies

34

34%

No shade over the playground equipment

29

29%

Shade for carers who are sitting

90

90%

 

During the investigation Council staff met with representatives from the Cancer Institute NSW and Cancer Council NSW. The meeting discussed a recent research project ‘Benchmarking Shade in NSW Playgrounds’ conducted by the Cancer Institute NSW, the Queensland University of Technology and the University of Southern Queensland.

 

The project was the first of its kind in Australia and the purpose was to provide comprehensive state-wide data about shade and sun protection in playgrounds. The research results are currently being finalised but the initial discussions suggest that the recommended shaded area of a playground should be at least 40% (this figure has not been published due to ongoing evaluation). Further discussions with the Cancer Institute NSW suggest a preference for 80% of playground areas to be shaded which aligns with the draft NSW Government Green Places Design Guide. It is not considered appropriate to shade entire areas as the users will require sunlight in the cooler months.  

 

There are currently 19 playgrounds across the LGA that have shade sails. The estimated capital cost to install shade sails at the additional 81 playgrounds is $2,965,063[1].

 

In consideration of the capital and ongoing operational costs it is proposed that Council set an initial benchmark of 40% of the playground area be shaded at playgrounds classified as a Local Major, Suburban or Regional playgrounds. To achieve this benchmark a combination of shade structures and natural shade will need to be installed. For local minor playgrounds it is proposed that natural shade continue to be the primary source of shade as Local Minor playgrounds are designed to service local neighbourhoods and have a short 20-minute duration of stay. However, it is noted that this approach would mean that some suburbs and villages would not have access to a playground with a shade sail.  To address this, it is proposed that some local minor playgrounds also have shade sails installed where there is no other shaded playground within the suburb or village.  Once a shade sail is installed it is expected that shade coverage will be approximately 80% of the playground space.

 

To ensure this approach to shade sail installation continues to be implemented in future developments it is proposed the 40% benchmark if endorsed be included in the revised playground strategy which is currently under review. This benchmark would then be subject to review every five (5) years in line with the ongoing Playground Strategy review.

 

To achieve the proposed shade coverage 26 playgrounds will need sails installed. Local major playgrounds that have continuous shade from tree canopies throughout the day have not been recommended for shade sail installation. The estimated cost of completing this project is $969,443[2].  It is proposed that the installation of shade sails be staged and implemented over time to lessen the financial impact. Please note that the estimated costs are current however rapidly changing market conditions could significantly impact the project cost over time.

 

The table below identifies which playgrounds are recommended to shade sails installed under this proposal:

 

Playground

Suburb

Hierarchy

Estimated Size of shade sail

Estimated Capital Cost $ (inclusive of 10% contingency and 10% project management)

Webb Park

Ashmont

Suburban

10m x 15m

$35,664

Graham Park

Ashmont

Local Major

10m x 15m

$35,664

Lineal Park

Boorooma

Local Major

10m x 15m

$35,664

Bedervale St Park

Bourkelands

Suburban

10m x 15m

$35,664

Lonergan Place Playground

East Wagga

Local Minor

10m x 15m

$35,664

Menneke Park

Estella

Local Major

10m x 15m

$35,664

Eucalypt Park

Forest Hill

Local Major

10m x 15m

$35,664

Galore Reserve

Galore

Local Major

10m x 15m

$35,664

Undurra Drive Park

Glenfield Park

Local Major

10m x 15m

$35,664

Humula Park

Humula

Local Major

10m x 15m

$35,664

Ladysmith Park

Ladysmith

Local Major

10m x 15m

$35,664

Apex Park

Lake Albert

Regional

20m x 22m

$65,165

Ray Beddoe Park

Lake Albert

Local Major

10m x 15m

$35,664

Lingiari Park

Lloyd

Local Major

15m x 18m

$41,523

Brookedale Hall playground

Lockhart

Local Minor

10m x 15m

$36,664

Mangoplah Park

Mangoplah

Local Major

10m x 15m

$35,664

Pomingalarna Reserve Playground

Moorong

Local Minor

10m x 15m

$35,664

Jack Avenue

Mt Austin

Local Major

10m x 15m

$35,664

Albert Burgman Park

North Wagga Wagga

Local Major

10m x 15m

$35,664

Norman Duck Oval Playground

San Isidore

Local Major

10m x 15m

$35,664

Sterling Boulevard

Tatton

Local Major

10m x 15m

$35,664

Chambers Park

Tolland

Suburban

15m x 18m

$41,523

Kessler Park

Tolland

Local Major

10m x 15m

$35,644

Uranquinty Sportsground Playground

Uranquinty

Local Major

10m x 15m

$35,664

Cox Park

Wagga Wagga

Local Major

10m x 15m

$35,644

Wiradjuri Estate Playground

Wagga Wagga

Local Major

10m x 15m

$35,664

 


 

In additional to capital costs, additional annual maintenances costs would be required to maintain shade sails as they are a highly vandalised asset. Local suppliers recommend a 12 monthly visual inspection, and re-tension of sails every 3-4 years, this costs typically $1,200-$1,500 depending on the sail size and equipment required. The cost of replacement would also need to be considered as the average useful life span of a shade sail is 15 years. Replacement of shade sails can start anywhere from $8,000 to upwards of $19,000 dependent on size.

 

It is also recommended that in addition to the proposed shade sails Council plant at least four advanced trees at each playground on the eastern and western sides, planting trees at each playground is the preferred and most cost effective option when providing shade for playgrounds. This will ensure that in future years there will be a reduced reliance on built shade as trees mature. Advanced trees are trees that have been grown in at least a 100-litre pot and are typically between two and three metres tall. When planting the advanced trees fast growing deciduous species are selected however it can still take up to ten years of growing to provide adequate shade.

 

It is proposed the following elements would be considered in the future when using trees for the primary shade source in a playground:

 

·  Where appropriate, new playgrounds be located to the east and west side of existing, mature shade trees

·  Where appropriate, playgrounds being renewed be relocated to the east and west side of existing mature shade trees

·  Only advanced trees to be planted for those existing local minor playgrounds that lack appropriate shade

·  Tree species to also consider other environmental benefits including wind protection, habitat for local fauna and improvement to the visual amenity of the area

·  Tree species consider passive surveillance

·  Trees must be guarded to increase their protection against vandalism

 

The cost of planting advanced trees is:[3]

 

Advanced Tree Supply

$250 per tree

Tree Mulch

$14 per tree

Growing Mix

$17 per tree

Protective Cages

$100 per tree

 

The estimated cost to plant four advanced trees at all 100 playgrounds is $152,400. The calculated estimated cost included tree mulch, growing mix and protective cages for the trees. Additional to capital costs annual maintenance budgets would need to incorporate funding for tree establishment, watering trees when they are young and ongoing pruning throughout the life of the tree. 

 

In order to maximise the community benefit of the playground network and fund the cost of the shade sails partnership opportunities will be explored by Council staff. The partnerships could be considered are works in-kind with local community organisations, sponsorship from businesses or grants from other levels of Government.

 

Council could also consider an adopt a park model where local community organisations or businesses contribute funding or works in kind to provide shade for playgrounds. This model would give participating organisations or businesses acknowledgement of their contribution to the playground, this acknowledgement could be recognised through a plaque or media coverage.

 

In addition to the tree planting it is proposed that Staff also trial a location where a simple structure is developed over a playground and a deciduous vine or creeper be grown over the structure to determine if this will provide an adequate amount of shade and is manageable from an operation maintenance point of view.

 

Structures with a Colourbond or similar roof were considered however were not investigated in detail as these would have been more expensive due to the need to have stormwater infrastructure and would have resulted in very cold playgrounds during winter.

 

Financial Implications

It is recommended that $152,400 be allocated from the Parks and Recreation reserve to fund the advanced tree planting in the 2022/23 financial year.  The current balance of this reserve is $597,030.

Policy and Legislation

Recreation, Open Space and Community Strategy 2040

Wagga Wagga Playground Strategy 2016-2036

 

 

Link to Strategic Plan

Safe and Healthy Community

Objective: We are safe

Outcome: We create safe spaces and places

 

Risk Management Issues for Council

The risks associated with implementing the shade structures and tree plantings relate to process, cost, environmental, WHS and contractor performance. These risks are addressed as part of Council’s project management and contractor performance management systems.

Internal / External Consultation

Internal consultation was undertaken with Council’s Environment, Park Operations and City Strategy Divisions.

 

External Consultation was undertaken with the NSW Cancer Institute and NSW Cancer Council.

 

 

 

Attachments

 

1.

Playground Hierarchy - Provided under separate cover

 

2.

Existing Playgrounds with Shade Sails - Provided under separate cover

 

3.

Playgrounds Audit - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-8

 

RP-8               RESUABLE CLOTH NAPPY AND MENSTRUAL PRODUCT REBATE TRIAL

Author:          Ray Graham 

Executive:    Scott Gray

         

 

Summary:

Due to the success of the six-month trial of the rebate, it is proposed that a continuation of the trial of the rebate program for reusable nappies and women’s menstrual products be undertaken.

 

 

Recommendation

That Council:

a       continue the Nappy and Menstrual product rebate scheme trial for the 2022/23 financial year from 1 Sept 2022 to 30 June 2023

b       undertake promotion via website, council news and social media

c        offer a rebate of 50% of the purchase price of up to a maximum rebate of $100 per child for Nappies

d       offer a rebate of 50% of the purchase price of up to a maximum rebate of $50 per person for Menstrual products

e       that the rebate only be applied within the existing budget on a first in basis

f        undertake a review of the program in January 2023

g       approve the budget variation/s as detailed in the Financial Implications section of the report

 

Report

Council at its ordinary meeting of 26 April 2021 resolved:

 

That Council:

 

a.    Add information and resources to the “your waste” web site to encourage the use of alternatives to disposable items in all possible areas to reduce waste to landfill and conserve resources.

b.    Implement an educational and information program on reusable nappies, engaging with the Australian Nappy Association and through normal procurement processes engage a provider to conduct a series of workshops, over 6 months to educate and assess community interest.

c.    Engage and consult with community Women’s health and wellbeing groups in Wagga Wagga and work with the groups to develop the educational programs and workshops.

d.    Implement a trial rebate scheme to commence in the 2021/2022 financial year, offering a rebate of 50% of the purchase price of up to a maximum rebate of $100 per child.

e.    Receive a further report following the trial period and prior to the 2022/23 budget.


 

 

f.     Approve the budget variations a detailed in the Financial implications of the report.

 

Council commenced a trial of the reusable Nappy and Menstrual product rebate from 1 July 2021 to 1 January 2022. To promote the trial council undertook promotion via the following avenues:

 

·    Council’s website

·    Social Media i.e. Facebook

·    Council newsletter

·    And several workshops which included some webinars which included sample materials for demonstration

 

It should be noted that Council still retained the promotional sample materials purchased for the original trial period, as well as the webinars which can be re-used.

 

Eligible products for the rebate included the following items:

·    Modern Cloth nappies

·    Re-usable nappy inserts and liners

·    Re-usable menstrual products

 

With a rebate of 50% of the actual spend up to a maximum rebate of $100 per person or child.

 

Customers were able to lodge applications for the rebate through a portal on Councils website or in person at the Customer Service desk in the Council administration building.

 

At the end of the trial the following take- up was recorded:

·    Re-Usable Nappy rebate applications – 70

·    Re-usable Menstrual Product rebate applications – 162

 

Of these applications 7 were declined for the following reasons:

·    Multiple applications that exceeded the allowed rebate per person

·    Applications from outside Wagga Wagga LGA

 

The 232 applications to the rebate scheme exceeded initial estimates. This appears to indicate there was significant interest in the community to invest in these products.

 

As part of the review of the initial trial council undertook a direct survey with the participants with an online survey request emailed directly to each of the participants. 65 participants completed this survey providing feedback on the reusable product rebate.

 


 

In summary:

 

·    45% of the participants stated it was their first time trialing a re-usable product,

·    100% of participants stating they would continue to use re-usable products,

·    98% of the participants liked the re-usable products they purchased with the remaining 2% indicating they didn’t like the particular product they tried

·    68% of the participants tried re-usable products due to their environmental advantage,

·    10% of the participants decided to try the reusable products for economic reasons

·    Council advertisements contributed to 50% of how the participants heard about the rebate; and

·    100% of the participants said that they would recommend these products to family and friends.

 

Overall, the survey contained positive feedback regarding the rebate and the application process with all responses encouraging Council to continue the rebate going forward.

 

Research

 

Nappies:

 

Based on the average of 6 to 8 nappy changes per day – the average baby goes through 2,500 Nappies per year. A used disposable nappy on average weighs approximately 195 grams. Based on this average the weight to landfill of disposable nappies per baby per year is around 485kg.

 

From the trial based on 70 applications and assuming that each baby did not then use a disposable nappy this equates to approximately 33,000 kg of waste not being transported and disposed of in landfill just from disposable nappies alone over a 12 month period.

 

Menstrual products:

 

A study undertaken in the UK in April of this year indicates the estimated product use by the average person for menstrual products over the person’s lifetime can be between 40kg and 80kg. Based on a 40-year span this equates to approximately 2kg per person per year.

 

From the trial based on the 162 applications and assuming that the applicants used only the re-usable product this equated to approximately 315 kg of waste not being transported to and disposed of in landfill from disposable menstrual products alone.

 

The desired outcome is for council to continue the trial for a 10-month period being 1 September 2022 to 30 June 2023 the following can be assumed.


 

Product

2021

Processed Trial Applications

2022/23

estimated applications

Cost @ $100 each

Estimated waste diverted (kg)

Nappies

68

110

$11,000

53,350 kg

Menstrual Products

157

260

$26,000

520 kg

Totals

225

370

$37,000

53,870 kg

 

Based on these projected figures which assumes that the figures for the 6-months will translate directly to a 10-month take up means that Council will require a budget of $37,000 to cover the rebates, let alone promotional budget.

 

Based on the impact to Council’s waste streams, the Nappy impact is an estimated 53,000kg being a magnitude larger than the Menstrual Product impact. The anticipated diversion of waste from the pit equates to a saving of $8,300 based on 55 tonnes @ $155 per tonne.

 

Several Local Government trial with the rebates have had a distinction between the rebate for Nappies and menstrual products.

 

Wyndham City Council Nappies max $100

·    Menstrual Products max $50

 

City of Casey

·    Nappies max $150

·    Menstrual products max $100

 

Parramatta City

·    Nappies max $150

·    Menstrual Products max $100

 

Shire of Augusta

·    Nappies – max $100 Menstrual Products max $50

 

It is proposed that Council implement a 2-part rebate system that distinguishes between Nappies and Menstrual products recognizing the overall impact on the waste stream.

 

Product

2022/23

estimated applications

Rebate

per person

Cost

Nappies

110

$100

$11,000

Menstrual Products

260

$50

$13,000

Totals

370

 

$24,000

 


 

To continue the trial, including setting up, processing rebates, advertising as well as fielding enquiries is a time-consuming process with the equivalent of 0.7 FTE staff required. Previous experience indicated that the majority of time spent by staff was in the processing of the claims end. During the trial this workload was taken on by existing staff however moving forward this is unsustainable.

 

It is proposed that if Council wishes to continue along these lines that a new role be added within the waste staffing for a waste education officer to undertake the Nappy Rebate as well as other waste education initiatives to improve the quality of the waste received at Gregadoo Waste Management Centre.

 

The continuation of the trial for the 2022/23 financial year within the existing budgetary allowance will continue to highlight the alternatives to the disposable products and encourage some of the community to make a change. It will also allow council to understand the ongoing staff time impacts and potential efficiencies in procures that can be achieved moving forward.

 

Financial Implications

Based on the take-up for the trial period of 225 applications to the rebate for the 6 month period of the trial, Council can assume that the annual take-up would be in the order of 370 applications being 110 for Nappies and 260 for Menstrual products.

 

Based on the 2-part rebate this will result in an expected cost of approximately $24,000. It is proposed to allow a budget for the 2022/23 financial year of $30,000 funded from the Solid Waste Reserve, which has current capacity. 

 

Based on the administration from the trial in 2021/22 the staffing impact amounted to the equivalent of 0.7 FTE. This time involved the following activities:

·    Administration and processing of applications

·    Processing of rebate payments

·    Dealing with enquiries relating to the program

·    Setting up of promotional information i.e. Facebook,

 

The extension of the trial will allow Council to refine the staff time impacts and consideration of a future direction.  The staff resourcing for the continuation of the trial will be undertaken from within existing staff resources across Council.

 

Job consolidation: 70171 – Nappy & Menstrual Product Rebate

Policy and Legislation

N/A

 

Link to Strategic Plan

The Environment

Objective: We create a sustainable environment for future generations

Outcome: We are proactive with our waste management

 


 

Risk Management Issues for Council

In the initial report risks identified included abuse and misuse of the rebate, and Oversubscription. The application process for the rebate was monitored by staff with a small quantity of applications being rejected due to not being from within the Wagga Local Government Area, or exceedance of the household limit for the rebate. However, this was minimal and easily managed through the application of the rebate. Further management of the program should include the following mitigations:

·    Only one application per person / child for an indefinite period

·    The rebate program will be paused at any time when the budget allocation has been exhausted.

Internal / External Consultation

A survey of the participants from the initial trial was undertaken.

 

Ongoing consultation and promotion of the continuing trial will be undertaken with community health, mothers’ groups as well as utilizing Council’s social media accounts.

 

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-9

 

RP-9               Revised Public Art Plan 2022-2026

Author:         Lauren Reynolds 

Director:       Janice Summerhayes

         

 

Summary:

The revised Public Art Plan 2022-2026 is presented to Council for adoption after completion of the public exhibition period from 15 June 2022 to 12 July 2022.

 

 

Recommendation

That Council:

a       receive and note the submissions received during the exhibition period

b       adopt the revised Public Art Plan 2022-2026 with the recommended changes as detailed in the report

 

Report

Council endorsed the revised Public Art Plan 2022-2026 (Plan) for public exhibition on 15 June 2022 to 12 July 2022. During the exhibition period ten (10) submissions were received along with one (1) late submission, primarily expressing support for the Plan and encouraging continued focus on public art in the Wagga Wagga Local Government Area (LGA).

 

The table below provides an overview of the key issues or comments received in the submissions, along with responses and any amendments made to the draft Plan (full submissions are provided under separate cover).

 

Sub No.

Submission Summary

Response

1

Budget increase – Call for Council to reinstate policy for the Public Art Reserve to receive the full 1% levy on capital works projects.

The current resolution and related Policy of Council is an annual budget allocation to the Public Art Reserve which is the first $50,000 raised annually from the 1% levy on the budget of all capital works projects, as described in the Public Art Policy (POL 109). Staff also actively look for alternate funding opportunities or opportunities through collaborative projects to fund public art works. Any increase to the public art budget would require a change to Council’s current policy and resolution for Public Art.

2

Impact of public art – Support for the public art plan and creating new artworks that connect with Wiradjuri culture, new generations and different cultures in the LGA

This plan includes a new commission/s that continues Council's commitment to celebrating Wiradjuri Heritage and Culture, page 11. The guiding principles are inclusive of the whole of the community and the new works that will be commissioned through the life of this plan will engage with different generations and cultures that live in the Wagga Wagga LGA.

3

Mural opportunities – Professional mural artist expressing enthusiasm for the plan and interest in being commissioned for new works

The commissioning process for new public artworks involves calling for Expressions of Interest, allowing multiple artists to put forward their varied concepts and artistic practices for consideration. There are multiple opportunities within this plan that may allow for the commissioning of new murals and artists are able to sign up to the public art mailing list to be notified of upcoming opportunities.

4

Sustainable materials – Support for the plan and a call made for considering sustainable materials in new works

The importance of environmental sustainability is one of the commissioning principles on p 19 which helps guide decision making in the assessment of Expressions of Interest. Acknowledging the importance of using sustainable materials and investigating opportunities to use recycled materials will be considered on an individual project basis and will be included in the Expression of Interest brief for artists.

5

Funding allocation

Support for the plan as written but critical of Council’s reduction in Public Art funding from the previous policy of receiving the full 1% levy on capital works projects

The current resolution and related Policy of Council is an annual budget allocation to the Public Art Reserve which is the first $50,000 raised annually from the 1% levy on the budget of all capital works projects, as described in the Public Art Policy (POL 109). Staff also actively look for alternate funding opportunities or opportunities through collaborative projects to fund public art works. Any increase to the public art budget would require a change to Council’s current policy and resolution for Public Art.

6

Graffiti management

Supportive of public art in Wagga Wagga and would like to see more murals to help combat graffiti.

This plan includes a range of commissioning opportunities, not restricted to certain art forms and aims to reach across the LGA through neighbourhoods, suburbs, villages and the city's events. There is scope for murals to be considered in the commissioning of new works across the projects outlined in this plan. The effectiveness of using street art to combat illegal graffiti is acknowledged in Council’s Graffiti Management Plan 2017-2021 and Council encourages other organisations or businesses to also commission their own property murals with an example of this at Romanoes Hotel.

 

7

Public art trails – Support for the plan and complimentary towards public art works and trails featured in other regions.

The WWWCC Public Art Collection is a significant collection in regional NSW and this plan aims to grow this collection as well as celebrate it. The projects outlined in this plan aim to be ambitious and innovative and the Public Art Audio Trail will celebrate the stories behind the works and provide a point of interest for visitors and locals.

8

Placemaking and link to Council’s Cultural Plan

Complimentary of the plan and its varied schedule of works that links to placemaking and a commitment to the outcomes of the Wagga Wagga City Council Cultural Plan 2020-2030. Comments made to certain items as follows:

The Wagga Wagga City Council Cultural Plan 2020-2030 is the parent document to this revised Public Art Plan and along with the Community Strategic Plan 2040 guides the projects of this plan and their outcomes. The revised Plan working in side step with the Cultural Plan shows Council's commitment to being a thriving, innovative, connected and inclusive community on the Murrumbidgee, where culture and creativity engage and involve the whole community.

River Life Project

Recommendation to acknowledge on p 11 the 'River Life' project that has been delayed from the previous public art plan 'Enliven Public Art Plan 2017-2021'

Text added on p 11:

'River Life' (refer to Enliven Public Art Plan 2017-2021) is a major commission currently underway in partnership with the local Wiradjuri community, see Schedule of Works pg 21. Council will continue this commitment to celebrate Wiradjuri culture with a second major commission as detailed below.

City, Suburbs and Villages

Recommendation to amend the project title 'Suburbs and Villages' on p 15 to include the city, so as not to exclude the CBD from this projects scope

Amendment to title on p 15:

City, Suburbs & Villages

Lighting Projects

Concern the outcomes of the 'Creative Light Spaces' project on p 17 will not be focused on creating great art and may be utilised to fix poorly executed projects or installed in places that are not proven to be in need of safety improvements. Call for including a rationale for how locations are chosen and deep community engagement to determine specific needs and opportunities for a commission.

The description for this project specifies that the commissions will be in 'identified locations to improve public safety and amenity'. Although not yet identified at the time of writing, these locations will be identified with public safety and amenity as priority through consultation with the community and analysis of up to date crime statistics. This will be further detailed in the Expression of Interest process when commissioning these installations. To reflect this intention of collaboration, the table on p 17 was amended to read:

Collaborate - Wagga Wagga City Council; partner agencies and communities

Procurement

Supportive of flexible procurement processes being included in the commissioning guidelines on p 19

Text on p 19 amended to align with Public Art Policy (POL109):
The Public Art Advisory Panel will call for an Expression of Interest (EOI) when commissioning new public art works, through public and targeted processes, in accordance with Council's procurement guidelines.

Public Art Officer

Call for a full-time Public Art Officer to be employed - currently public art responsibilities sit with the Cultural Officer position

Public Art responsibilities are part of the full time employed Cultural Officer role at Wagga Wagga City Council.

9

Collaboration

Support for the plan and encouraging of collaborations across various art forms.

The plan on p 7 acknowledges that public art is varied and is not restricted to traditional art forms, for example it can be sound and light works, performances, or multimedia. 'Collaborate' is a pillar of the guiding principles on p 9 and any opportunity for collaboration between artists will be encouraged.

10

Support for Villages in the LGA – Enthusiastic support for the plan, particularly for the continuation of public art being featured in the villages of the LGA, as well as acknowledging public art can be temporary or permanent. Appreciation shown for past public art works that are loved by the community and the continued support from Council with future community-led public art projects. Acknowledges the importance of public art making Wagga Wagga a vibrant place to live and extends full support towards celebrating new artworks and events across the LGA.

This submission speaks specifically to the guiding principles on p 9 and embraces Council's aim to 'Promote the cultural and social diversity of the whole community through enhancement of the visual and environmental beauty of the city'. There have been multiple successful public art projects carried out in the villages in the past that remain important features of the WWCC Public Art Collection. This Plan continues this commitment of reaching out across the whole of the LGA when seeking new commissioning opportunities, and Council will continue to work closely with and support communities in our neighbourhoods, suburbs and villages.

11

Error in artist credit

(late submission as mentioned above)

Raised a mis-credit on p 23 for the artwork Wiradjuri Ceramic Mural.

Text amended on p 23:

2. Amanda Gay, Rachelle Mascini, Chris Helyar, David O’Neill and youth from the Riverina Juvenile Justice Centre, Wiradjuri Ceramic Mural

 

Financial Implications

The Public Art Reserve receives a budget allocation of $50,000 annually as described in the Public Art Policy (POL 109). Projects listed in the draft Plan are either funded, utilising this reserve allocation or not funded, this is where alternative options will be pursued for example funding applications to State and Federal government agencies or to potential sponsors to support these projects.

 

The proposed schedule of works included in the revised Public Art Plan 2022 –2026 include:

 

 

2022/23

2023/24

2024/25

2025/26

Estimated Opening Balance

$211,150*

$69,662

$39,662

$39,662

Public Art Annual Allocation

$50,000

$50,000

$50,000

$50,000

Total Reserve Funds

$261,150

$119,662

$89,662

$89,662

Projects

Wiradjuri Heritage & Culture

unfunded

unfunded

unfunded

unfunded

River Life (from Enliven Public Art Plan 2017-2021) Wiradjuri Commission

$141,488

 

 

Events

$10,000

$10,000

$10,000

$10,000

Neighbourhood Engagement

$20,000

$20,000

$20,000

$20,000

Suburbs & Villages

$15,000

$15,000

$15,000

$15,000

Creative Light Spaces

-

$30,000

-

$30,000

Listen In – Audio Art Trail

-

-

-

-

Administration Fee

$5,000

$5,000

$5,000

$5,000

Total Projects

$191,488

$80,000

$50,000

$80,000

Estimated Closing Balance

$69,662

$39,662

$39,662

$9,662

 

 

* Please note that the 2021/22 financials have not been finalised, so the opening balance is based on the estimated figure at the time of this report.

Policy and Legislation

POL109 – Public Art Policy

Wagga View – Community Strategic Plan 2040

Cultural Plan 2020-2030

Wiradjuri and First Nations Community Cultural Protocols 2021

Reconciliation Action Plan 2025

Recreation, Open Space and Community Strategy and Implementation Plan 2040

Draft Community Safety Action Plan

Draft Wiradjuri Trail Master Plan

Create in NSW: The NSW Arts and Cultural Policy Framework (2015)

NSW Aboriginal Arts and Culture Protocols

 

Link to Strategic Plan

Community Place and Identity

Objective: We are proud of where we live and our identity

Outcome: We have a strong sense of place

Risk Management Issues for Council

N/A

Internal / External Consultation

In preparation of the revised Public Art Plan 2022-2026 internal consultation was undertaken with relevant departments across Council’s organisation and with Council’s Executive. A Councillor workshop was held on Monday 23 May 2022 which also informed the revised Public Art Plan 2022-2026 to be placed on public exhibition.

 

External consultation was undertaken as part of Council’s extensive cultural planning consultation processes, with Council’s appointed Public Art Advisory Panels, and key stakeholders.

 

Notification of the public exhibition period was distributed through Council’s cultural networks and was advertised through Council News and Council social media platforms.

 

Attachments

 

1.

WWCC Public Art Plan 2022-2026 - Provided under separate cover

 

2.

All Public Art Plan Exhibition Submissions Received

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-9

 

Text, email

Description automatically generated

Text, application, email

Description automatically generated

Text, application, email

Description automatically generated

Text, email

Description automatically generated

Text, application, email

Description automatically generated

Text, email

Description automatically generated

Text, application, email

Description automatically generated

Text

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, email

Description automatically generated

Graphical user interface, text, application

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-10

 

RP-10            Revised Community Safety Action Plan 2022 - 2026

Author:         Sarah Lehman 

Director:       Janice Summerhayes

         

 

Summary:

This report advises Council on the outcome of the public exhibition process for the draft Community Safety Action Plan 2022 - 2026. The Community Safety Action Plan 2022 – 2026 is presented to Council for endorsement, following public exhibition.

 

 

Recommendation

That Council:

a       note that there were no public submissions received during the exhibition period for Community Safety Action Plan 2022 - 2026

b       adopt the Community Safety Action Plan 2022 - 2026

 

Report

At the 14 June 2022 Ordinary Council meeting it was resolved to place the draft Community Safety Action Plan 2022-2026 on public exhibition. During the public exhibition period from 15 June 2022 to 12 July 2022 no public submissions were received.

 

There was extensive consultation and engagement in the development of the Community Safety Action Plan 2022-2026 which was invaluable for informing the priorities going forward.  In addition, Council staff carried out further engagement through the public exhibition period and there were no further requested amendments.

 

Council recognises community services and other agencies that are already delivering programs designed to address community safety, so the priority and actions items listed in the draft revised Community Safety Action Plan 2022-2026 will complement the existing response and allow for future partnership initiatives.

Three main priority areas from the review and of which formed the focus for the draft revised Community Safety Action Plan 2022-2026 are:

 1)     Safe Homes and Neighbourhoods

2)      Safe and respectful relationships and

3)      Safer Cities

 

It is recommended that Council adopt the Community Safety Action Plan 2022-2026 as exhibited and attached.

Financial Implications

N/A


 

Policy and Legislation

Crimes (Domestic and Personal Violence) Act 2007 (CDPV Act)

Children (Protection and Parental Responsibility) Act 1997

Graffiti Control Act 2008

Pending – Coercive Control - Preethi's Law - Crimes (Domestic and Personal Violence) Amendment Bill 2020

 

Link to Strategic Plan

Community Place and Identity

Objective: We have opportunities to connect with others

Outcome: Groups, programs and activities bring us together

 

Risk Management Issues for Council

Risk management will occur as part of the practice and delivery of the revised Community Safety Action Plan 2022-2026 action plan

Internal / External Consultation

For the update of the Community Safety Action Plan 2022-2026 internal consultation was undertaken with relevant departments across Council and with Council’s executive. A Councillor workshop was held on 23 May 2022 which also informed the update the plan which was placed on public exhibition.

 

Staff held external consultation through an on-line survey and targeted place engagement and consultation sessions. In addition to this, one-on-one engagement sessions were offered through face to face, e-mail or specific agency feedback meetings.

 

On public exhibition staff met with community members and stakeholder groups including at the community centres in Tolland, Kooringal and Ashmont. There was no other feedback for amendments to the current document.

 

 

Mail

Media

Community Engagement

Digital

Rates notices insert

Direct mail

Letterbox drop

Council news story

Council News advert

Media releases

TV/radio advertising

One-on-one meetings

Your Say website

Community meetings

Stakeholder workshops

Drop-in sessions

Surveys and feedback forms

Social media

Email newsletters

Website

Digital advertising

TIER

Consult

 

 

 

x

x

 

x

 

x

 

x

 

x

x

 

Involve

 

 

 

x

x

 

x

x

 

x

x

x

Collaborate

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Attachments

 

1.

WWCC Draft Community Safety Action Plan 2022-2026 - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-11

 

RP-11            REVISED ALL ABILITIES INCLUSION ACTION PLAN 2022 - 2026

Author:          Sarah Lehman 

Director:       Janice Summerhayes

         

 

Summary:

This report advises Council on the outcome of the public exhibition process for the draft All Abilities Inclusion Action Plan 2022 - 2026. The draft All Abilities Inclusion Action Plan 2022 - 2026 is presented to Council for endorsement, following public exhibition.

 

 

Recommendation

That Council:

a       note that there were no public submissions received during the exhibition period for the draft All Abilities Inclusion Action Plan 2022 – 2026

b       adopt the All Abilities Inclusion Action Plan 2022 - 2026

 

Report

At the 14 June 2022 Ordinary Council meeting it was resolved to place the draft All Abilities Inclusion Action Plan 2022 – 2026 on public exhibition. During the public exhibition period from 15 June 2022 to 12 July 2022 no public submissions were received.

 

There was extensive consultation and engagement in the development of the draft All Abilities Inclusion Action Plan 2022 – 2026 which was invaluable for informing the priorities going forward.  In addition, Council staff carried out further engagement through the public exhibition period and there were no further requested amendments.

The NSW Disability Inclusion Amendment Act 2022 passed both Houses of Parliament and commenced on 1 July 2022. Councils were given a one-off extension of 17 months, meaning Councils must review their 2017 Disability Inclusion Action Plan by 30 November 2022.

It is recommended that Council adopt the draft All Abilities Inclusion Action Plan 2022 – 2026 as exhibited and attached.

 

Financial Implications

N/A

Policy and Legislation

Disability Discrimination Act 1992

Disability (Access to Premises – Buildings) Standards 2010

Disability Standards for Accessible Public Transport 2002

Disability Standards for Education 2005

National Disability Strategy 2010-2020

National Disability Insurance Scheme

National Standards for Disability Services

Fair Work Act 2009

NSW Disability Inclusion Act 2014

NSW Disability Inclusion Plan

Anti-Discrimination Act 1977

 

Link to Strategic Plan

Community Place and Identity

Objective: Our community feel welcome, included and connected

Provide programs and activities to bring us together

 

Risk Management Issues for Council

Risks management will occur as part of the practice and delivery of the draft revised All Abilities Inclusion Action Plan 2022-2026.

Internal / External Consultation

In development of the draft All Abilities Inclusion Action Plan 2022 – 2026 internal consultation was undertaken with relevant departments across Council’s organisation and with Council’s executive. A Councillor workshop was also held on 23 May 2022.

Feedback from the Councillors workshop was included in the draft plan that was placed on public exhibition.

 

Staff held external consultation through an on-line survey and targeted place engagement and consultation sessions in the development of draft plan. In addition, one-on-one engagement sessions were offered through face to face, e-mail or specific agency feedback meetings. The Wagga Access Reference Group also provided invaluable advice and input into the development of the draft revised All Abilities Inclusion Action Plan 2022-2026 that was placed on public exhibition.

 

During the public exhibition period staff met with community members and stakeholder groups at the community centres in Tolland, Kooringal and Ashmont. Staff also met twice with the members of the Wagga Access Reference Group for final review of the plan. No further comments were received.

 

 

Attachments

 

1.

WWCC Draft All Abilities Inclusion Action Plan 2022-2026 - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-12

 

RP-12            MORTIMER PLACE PETITION

Author:         Warren Faulkner 

 

         

 

Summary:

A petition has been received in regard to traffic congestion issues at the corner of Mortimer Place and Chaston Street.

 

 

Recommendation

That Council:

a       receive and note the petition

b       refer the matter to a Councillor Workshop in September to consider the issue 

c        receive a further report at its Ordinary Meeting on 7 November 2022 for determination

 

Report

The petition received is in relation to the traffic safety hazard that has developed on the corner of Mortimer Place and Chaston Street and the alleged negative impact on the combined businesses. It is suggested that customers of these businesses are avoiding the area due to the traffic congestion at the corner. An unredacted copy of the petition has been provided under separate cover for the Councillors.

 

Mortimer Place has been the subject of numerous customer requests and complaints from business operators, motorists and residents since the commencement of the Fast-Lane Coffee Shop on the corner of Mortimer Place and Chaston Street.

 

Councils Director Infrastructure Services and Manager Development Assessment & Building Certification visited the site on Wednesday 10 August 2022 to investigate options for traffic improvements and subsequently held discussions with the proponent of the petition as well as three other petitioners on site. In particular the owner of Crockers Auto Electrical who is opposite the Fast-Lane Coffee Shop experiences regular queuing of traffic across the driveway to their property in morning peak hour traffic which prevents egress from the business.

 

It is considered the best option to improve traffic movements into and out of Mortimer Place is to remove the on-street parking outside the Coffee Shop and Crockers Auto Electrical to maximise the width of pavement available for traffic movements into and out of Mortimer Place and install perpendicular or angle parking on the verge of Crockers Auto Electrical so they are not disadvantaged by the loss of on-street parking.  It is expected that the same number of car parking bays lost off Mortimer Place outside Crockers Auto Electrical and the Fast Lane Coffee Shop will be able to be accommodated on the verge adjacent to Crockers Auto Electrical.

 

This will allow the current pavement width of 13m (kerb to kerb) to be utilised to provide 4.5m unimpeded travel lanes into and out of Mortimer Place with the excess being able to be used for a turning lane into the Fast Lane Coffee Shop.

 

This can be achieved with line marking on Mortimer Place and Chaston Street, noting that currently no line marking exists.  Changes to the regulatory signs on Mortimer Place outside of Crockers Auto Electrical and the Fast Lane Coffee Shop will also be required.

 

It is suggested that various concepts for this proposal be developed and discussed with Crockers Auto Electrical before presenting to a Council workshop in September to consider before making a determination on the petition at its Ordinary Meeting on 7 November 2022.

 

Financial Implications

N/A

Policy and Legislation

Roads Act 1993

 

Link to Strategic Plan

Community Leadership and Collaboration

Objective: We are active community members

Outcome: We recognise we all have a role to play

 

Risk Management Issues for Council

There are no risk management issues for Council in adopting the recommendation.

Internal / External Consultation

Initial consultation has been undertaken with four of the petitioners on site on Wednesday 10 August 2022. 

 

 

Attachments

 

1.

Mortimer Place Petition 2022

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-12

 

A picture containing table

Description automatically generated


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-13

 

RP-13            CHILDREN'S CROSSING - WILLIAM STREET NORTH WAGGA WAGGA

Author:         Warren Faulkner 

         

 

Summary:

This report provides the outcomes of consultation that has taken place with the North Wagga Public School Principal and President of the P&C about upgrading the children’s crossing on William Street to a pedestrian (zebra) crossing.  The matter was also  referred to the Local Traffic Committee for their advice. 

 

 

Recommendation

That Council:

a       receive the report

b       not upgrade the children crossing in William Street adjacent to the North Wagga Public School to a pedestrian (zebra) crossing at this stage

c        note that Transport for NSW has developed a draft document titled “Pedestrian crossings - A best practice guideline for local governments” to provide guidance for Local Governments who choose to develop their own pedestrian crossing policy

d       receive a further report for a Pedestrian Crossings Policy following the finalisation of the draft Transport for NSW ‘Pedestrian crossings - A best practice guideline for local governments’ document

 

Report

Council received a report at its 7 March 2022 Ordinary Meeting about a Question with Notice asking if the school crossing at the North Wagga Public School can be upgraded to a pedestrian (zebra) crossing and resolved as follows:

 

That Council:

a       receive the report

b       consult with the North Wagga Public School Principal and P&C with respect to upgrading the school crossing on William Street.

c        refer the request to upgrade the school crossing to a pedestrian (zebra) crossing to the Local Traffic Committee for its advice

d       receive a further report with the Local Traffic Committee’s recommendation

d       develop a policy for the installation of pedestrian crossings

 

Councils Traffic officers have consulted with the Principal and President of the North Wagga Public School and have also referred the request to upgrade the school crossing to a pedestrian (zebra) crossing to the Local Traffic Committee for its advice.

 

The feedback from the Principal and President of the P&C is that they do not wish to see a pedestrian (zebra) crossing installed on William Street at the existing School Crossing and the Local Traffic Committees advice (refer to M-2 of this business paper) is that Council not approve changes to the Children’s Crossing located on William Street, North Wagga Wagga that would involve the installation of a Pedestrian Crossing.  It should be noted that the minutes of the Local Traffic Committee reflect that further consideration of additional signs and road markings for the school zone in William Street between Elizabeth Street and Hampden Avenue is warranted.  Council’s Traffic Officers will progress this with Transport for NSW.

 

As reported in the 7 March business paper, the existing crossing on William Street in North Wagga adjacent to the Public School has been installed as a children’s crossing in accordance with AS1742.10-2009.  It was upgraded in 2016 with the installation of the concrete islands on the side of the road to narrow the width of the crossing and highlight the existence of the crossing for vehicular traffic as shown following.

A picture containing text, tree, road, outdoor

Description automatically generated

The children’s crossing is a part-time facility catering primarily for school children.  It is only in operation when the ‘Children Crossing’ flags are displayed which are the responsibility of the school to erect on school days between the hours of 8am to 9:30 am in the morning and 2:30pm to 4pm in the afternoon.

It is important to note that when the crossing is in operation, the existence of pedestrians on or entering the crossing imposes a legal obligation on vehicular traffic to stop and not enter the crossing until all pedestrians have cleared the crossing.  This obligation is more onerous than a pedestrian (zebra) crossing for which the existence of a pedestrian on the crossing imposes a legal requirement on vehicular traffic to give way to the pedestrian

Hence, from a road safety perspective, the existing children’s crossing is a safer mechanism than a pedestrian (zebra) crossing for children to cross William Street during school zones times.  It is for this reason that upgrading the existing children crossing in William Street adjacent to the North Wagga Public School to a pedestrian (zebra) crossing is not recommended.

With respect to developing a policy for the installation of pedestrian crossings, Transport for NSW have drafted a document titled “Pedestrian Crossings – A best practice guideline for local governments” for the purpose of providing guidance for local governments who choose to develop their own pedestrian crossing policy. 

 

A copy of the draft document is attached for the information of Council. The guideline reflects the requirements of Australian Standard 1742.10 for Pedestrian Crossings.  At this stage and pending finalisation of this document, it is suggested that for consistency across the state this guideline could become the Pedestrian Crossing policy for Council.  It is therefore recommended that a further report be received to consider a Pedestrian Crossings policy following the finalisation of the draft Transport for NSW ‘Pedestrian crossings - A best practice guideline for local governments’.

 

Financial Implications

There are no financial implications associated with adopting the recommendations of this report.

Policy and Legislation

AS1742 Manual of uniform traffic control devices – Part 10: Pedestrian control and protection

 

Link to Strategic Plan

Community Leadership and Collaboration

Objective: We are informed and involved in decision making

Outcome: Everyone in our community feels they have been heard and understood

 

Risk Management Issues for Council

There are no risk management issues associated in adopting the recommendations of this report.  The layout of the current school crossing complies with AS1742.10-2009 for children’s crossings.

Internal / External Consultation

Consultation has taken place with the Principal of the North Wagga Public School and the President of its P&C.  The advice of the Local Traffic Committee was also sort. 

 

 

Attachments

 

1.

Draft TfNSW Pedestrian Crossings - A best practice guideline for local governments

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-13

 

A picture containing text, outdoor, shore

Description automatically generated

Icon

Description automatically generated

Text

Description automatically generated

A picture containing icon

Description automatically generated

A picture containing icon

Description automatically generated


 

A picture containing diagram

Description automatically generated

A picture containing icon

Description automatically generated

A picture containing graphical user interface

Description automatically generated

Graphical user interface

Description automatically generated

Graphical user interface, application

Description automatically generated

Text

Description automatically generated

Icon

Description automatically generated

Text

Description automatically generated

A picture containing icon

Description automatically generated

A picture containing Teams

Description automatically generated

Icon

Description automatically generated


Diagram

Description automatically generated

 

Graphical user interface, website

Description automatically generated

Graphical user interface

Description automatically generated

A picture containing text

Description automatically generated

Diagram

Description automatically generated



A picture containing waterfall chart

Description automatically generated

Timeline

Description automatically generated

A picture containing timeline

Description automatically generated

A picture containing table

Description automatically generated


A picture containing icon

Description automatically generated

Diagram

Description automatically generated


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-14

 

RP-14            FINANCIAL PERFORMANCE REPORT AS AT 31 JULY 2022

Author:          Carolyn Rodney 

         

 

 

Summary:

This report is for Council to consider information presented on the 2022/23 budget and Long-Term Financial Plan, and details Council’s external investments and performance as at 31 July 2022.

 

 

Recommendation

That Council:

a       approve the proposed 2022/23 budget variations for the month ended 31 July 2022 and note the balanced budget position as presented in this report

b       approve the proposed budget variations to the 2022/23 Long Term Financial Plan Capital Works Program including future year timing adjustments and new projects

c        note the Responsible Accounting Officer’s reports, in accordance with the Local Government (General) Regulation 2005 (Part 9 Division 3: Clause 203) that the financial position of Council is satisfactory having regard to the original estimates of income and expenditure and the recommendations made above

d       note the details of the external investments as at 31 July 2022 in accordance with section 625 of the Local Government Act 1993

 

Report

Wagga Wagga City Council (Council) forecasts a balanced budget position as at 31 July 2022. The balanced budget position excludes the Wagga Wagga Airport estimated deficit result for the financial year – as previously reported to Council, any Airport deficit result will be sanctioned, and funded in the interim by General Purpose Revenue (via the Internal Loans Reserve). 

 

The deficit results will be accounted for as a liability in the Airport’s end of financial year statements and paid back to General Purpose Revenue (Internal Loans Reserve) by the Airport in future financial years. 

 

Proposed budget variations including adjustments to the capital works program are detailed in this report for Council’s consideration and adoption.

 

Council has experienced a positive monthly investment performance for the month of July when compared to budget ($309,388 up on the monthly budget). This is mainly due to a positive movement in the principal value for Council’s fixed rate bonds as at 31 July 2022 as well as a positive movement in Councils TCorp managed fund.

 


 

Key Performance Indicators

 

Chart, bar chart

Description automatically generated

 

 

 

OPERATING INCOME

Total operating income is 7% of approved budget and is trending slightly below budget for the month of July 2022. An adjustment has been made to reflect the levy of rates that occurred at the start of the financial year. Excluding this adjustment, operating income received is 62% when compared to budget.

 

OPERATING EXPENSES

Total operating expenditure is 10% of approved budget so it is tracking over budget at this stage of the financial year. This is due to the payment of annual one-off expenses such as rates and insurance during the month of July.

 

CAPITAL INCOME

Total capital income is 8% of approved budget. It is important to note that the actual income from capital is influenced by the timing of the receipt of capital grants and contributions relating to projects. This income also includes the sale of property, plant and equipment.

 

CAPITAL EXPENDITURE

Total capital expenditure including commitments is 21% of approved budget including pending projects. This relates to capital project carryover budgets not being approved and reflected in these budgeted amounts, as well as some purchase orders being raised for the full contract amount for multi-year projects. Excluding commitments, the total expenditure is 1% when compared to the approved budget.


 

WAGGA WAGGA CITY COUNCIL
STATEMENT OF FINANCIAL PERFORMANCE
1 JULY 2022 TO 31 JULY 2022

CONSOLIDATED STATEMENT

 

ORIGINAL
BUDGET
2022/23

BUDGET ADJ
2022/23

APPROVED BUDGET
2022/23

YTD ACTUAL   EXCL COMMT'S 2022/23

COMMT'S 2022/23

YTD ACTUAL + COMMT'S
2022/23

YTD % OF BUD

Revenue 

Rates & Annual Charges

(75,524,168)

0

(75,524,168)

(6,219,646)

0

(6,219,646)

8%

User Charges & Fees

(27,844,136)

(300,000)

(28,144,136)

(1,272,183)

0

(1,272,183)

5%

Other Revenues

(2,769,503)

(200,000)

(2,969,503)

(191,384)

0

(191,384)

6%

Operating Grants & Contributions

(13,524,889)

(371,977)

(13,896,866)

(173,611)

0

(173,611)

1%

Capital Grants & Contributions

(36,295,253)

(138,745)

(36,433,998)

(3,130,843)

0

(3,130,843)

9%

Interest & Investment Income

(1,828,128)

0

(1,828,128)

(454,324)

0

(454,324)

25%

Other Income

(1,406,222)

(22,750)

(1,428,972)

(124,479)

0

(124,479)

9%

Total Revenue

(159,192,300)

(1,033,472)

(160,225,772)

(11,566,468)

0

(11,566,468)

7%

 

  

Expenses

 

Employee Benefits & On-Costs

51,315,412

0

51,315,412

2,810,915

0

2,810,915

5%

Borrowing Costs

3,268,989

0

3,268,989

(221,967)

0

(221,967)

(7%)

Materials & Services

36,542,674

1,249,867

37,792,541

3,737,673

4,241,292

7,978,965

21%

Depreciation & Amortisation

43,196,051

0

43,196,051

3,599,671

0

3,599,671

8%

Other Expenses

1,866,271

(314,120)

1,552,151

(279,672)

46,534

(233,138)

(15%)

Total Expenses

136,189,398

935,747

137,125,145

9,646,620

4,287,826

13,934,446

10%

 

Net Operating (Profit)/Loss

(23,002,902)

(97,725)

(23,100,627)

(1,919,849)

4,287,826

2,367,977

 

Net Operating (Profit)/Loss before Capital Grants & Contributions

(21,596,679)

(74,975)

(21,671,654)

(1,795,370)

4,287,826

2,492,456

 

 

 

Capital / Reserve Movements

Capital Expenditure - One Off Confirmed

13,596,521

1,243,928

14,840,449

192,003

16,035,924

16,227,927

109%

Capital Expenditure – Recurrent

18,890,352

(84,125)

18,806,227

30,288

4,111,202

4,141,490

22%

Capital Exp – Pending Projects

59,812,944

283,847

60,096,791

0

0

0

0%

Loan Repayments

7,571,681

0

7,571,681

547,640

0

547,640

7%

New Loan Borrowings

(17,458,537)

0

(17,458,537)

0

0

0

0%

Sale of Assets

(880,181)

(766,666)

(1,646,847)

(22,090)

0

(22,090)

1%

Net Movements Reserves

(15,333,827)

(579,259)

(15,913,086)

0

0

0

0%

Total Cap/Res Movements

66,198,954

97,725

66,296,679

747,841

20,147,126

20,894,967

 

 

 

ORIGINAL
BUDGET
2022/23

BUDGET ADJ
2022/23

APPROVED BUDGET
2022/23

YTD ACTUAL   EXCL COMT'S 2022/23

COMMT'S 2022/23

YTD ACTUAL + COMMT'S
2022/23

YTD % OF BUD

Net Result after Depreciation

43,196,052

0

43,196,052

(1,172,007)

24,434,952

23,262,945

 

 

Add back Depreciation Expense

43,196,051

0

43,196,051

3,599,671

0

3,599,671

8%

 

Cash Budget (Surplus) / Deficit

0

0

0

(4,771,678)

24,434,952

19,663,274

 

 

 

 

 

 

 

Years 2-10 Long Term Financial Plan (Surplus) /Deficit*

 

Description

Budget

2023/24

Budget

2024/25

Budget

2025/26

Budget

2026/27

Budget

2027/28

Budget

2028/29

Budget

2029/30

Budget

2030/31

Budget

2031/32

Adopted Bottom Line (Surplus) / Deficit

1,163,681

1,205,672

4,377,581

4,833,506

2,199,382

1,967,334

1,257,474

1,234,053

418,437

Adopted Bottom Line Adjustments

27,330

28,547

43,051

44,342

45,673

47,042

48,454

49,907

51,404

Revised Bottom Line (Surplus) / Deficit

1,191,011

1,234,219

4,420,632

4,877,848

2,245,055

2,014,376

1,305,928

1,283,960

469,841

 

 

 

 

 

 

 

 

 

 




2022/23 Revised Budget Result – (Surplus) / Deficit

$’000s

Original 2022/23 Budget Result as adopted by Council

Total Budget Variations approved to date

Budget Variations for July 2022

$0K

$0K

$0K

Proposed Revised Budget result for 31 July 2022 - (Surplus) / Deficit

$0K

 

 


The proposed Operating and Capital Budget Variations for 31 July 2022 which affect the current 2022/23 financial year are listed below:

 

Budget Variation

Amount

Funding Source

Net Impact

(Fav)/ Unfav

2 – Safe and Healthy Community

Narrung Street Golf Facility Irrigation Replacement

$120K

Parks & Recreation Reserve ($120K)

Nil

A recent review of Council’s infrastructure at the Narrung Street Golf Facility has determined that the existing irrigation infrastructure is at the end of its usable life. Council is responsible for the renewal of assets including irrigation infrastructure once it reaches end of life, and given the property is tenanted it is considered necessary to replace the irrigation infrastructure. It is proposed to fund the variation from operational savings experienced across the Parks Division budgets in 2021/22 which are to be transferred to the Parks & Recreation Reserve to fund this required replacement.

Estimated Completion: 30 June 2023

Job Consolidation: 21878

 

4 – Community Place and Identity

Writers on the Road Program

$40K

Office of Regional Youth ($40K)

Nil

Wagga Wagga City Library has been successful in securing grant funding from the Office of Regional Youth in partnership with Create NSW under the Holiday Break Program for the delivery of Writers on the Road Program. This program will involve the delivery of Zine making workshops across the suburbs and rural villages within the Wagga Wagga Local Government Area as part of the Agile Library Service during the 2023 Summer and Autumn School Holidays periods. A Zine is a non-commercial, self-published booklet.

Estimated Completion:  30 April 2023

Job Consolidation:21894

 

Lego Animation Workshops

$7K

Department of Regional NSW ($7K)

Nil

Wagga Wagga City Library has been successful in securing grant funding from the Department of Regional NSW under the Regional Youth – Holiday Break Program for the delivery of Lego Animation Workshops that will be delivered by the Wagga Wagga City Library’s Agile Library team during the Spring 2022 School Holiday break.

Estimated Completion:  31 October 2022

Job Consolidation:21898

 

5 – The Environment

Inglewood Road

Copland Street

Macleay Street

Nagle Street

Old Narrandera Road

$1,296K

$871K

$816K

$562K

$556K

Department of Infrastructure, Transport, Regional Development and Communications ($4,101K)

Nil

Council has been successful in securing Department of Infrastructure, Transport, Regional Development and Communications grant funding under the Local Roads and Community Infrastructure Program Phase 3. The grant will be used for the Pavement Rehabilitation of Inglewood Road – Mitchell Road East (2.4Km), Copland Street – Blaxland Road to Tasman Road (1.2Km), Macleay Street – Urana Street to Erin Street (720m), Nagle Street – Sturt Highway South (550m) and the Pavement Construction of Old Narrandera Road (5.4Km).

Estimated Completion:  30 June 2023

Job Consolidations:  16532 & 21598

 

 

$0K

 

 

 

2022/23 Capital Works Summary

 

Capital Works

Approved Budget

Proposed Movement

Proposed Budget

One-off

$14,840,449

$4,221,400

$19,061,849

Recurrent

$18,806,227

$0

$18,806,227

Pending

$60,096,791

$0

$60,096,791

Total Capital Works

$93,743,467

$4,221,400

$97,964,867

 

Please note that the above table excludes the capital project budgets that are in the process of being carried over from 2021/22 to the 2022/23 financial year.  These will be finalised for the next monthly report, which will be presented to the 19 September 2022 Council meeting.

 

Current Restrictions

 

Due to finalisation of the 2021/22 financial year figures, reserve balances have not been included in this report.


 

Investment Summary as at 31 July 2022

In accordance with Regulation 212 of the Local Government (General) Regulation 2005, details of Wagga Wagga City Council’s external investments are outlined below.

 

Institution

Rating

Closing Balance
Invested
30/06/2022
$

Closing Balance
Invested
31/07/2022
$

July
EOM
Current Yield
%

July
EOM
% of Portfolio

Investment
Date

Maturity
Date

Term
(months)

At Call Accounts

 

 

 

 

 

 

 

 

NAB

AA-

47,818

296,253

1.35%

0.17%

N/A

N/A

N/A

Rabobank

A+

1,031,556

21

0.30%

0.00%

N/A

N/A

N/A

CBA

AA-

4,953,765

4,393,951

1.35%

2.46%

N/A

N/A

N/A

CBA

AA-

10,838,801

10,845,779

1.40%

6.07%

N/A

N/A

N/A

Macquarie Bank

A+

9,063,132

9,071,723

1.35%

5.08%

N/A

N/A

N/A

Total At Call Accounts

 

25,935,072

24,607,727

1.37%

13.77%

 

 

 

Short Term Deposits

 

 

 

 

 

 

 

 

Community First

NR

1,000,000

0

0.00%

0.00%

7/12/2021

7/07/2022

7

CBA

AA-

2,000,000

2,000,000

2.22%

1.12%

20/04/2022

20/04/2023

12

CBA

AA-

2,000,000

2,000,000

3.68%

1.12%

8/06/2022

8/06/2023

12

Total Short Term Deposits

 

5,000,000

4,000,000

2.95%

2.24%

 

 

 

Medium Term Deposits

 

 

 

 

 

 

 

 

Auswide

BBB

2,000,000

2,000,000

0.85%

1.12%

6/10/2020

6/10/2022

24

BOQ

BBB+

2,000,000

2,000,000

1.20%

1.12%

4/01/2022

4/01/2024

24

BOQ

BBB+

1,000,000

1,000,000

3.78%

0.56%

1/06/2022

3/06/2024

24

Westpac

AA-

2,000,000

2,000,000

1.32%

1.12%

28/06/2021

29/06/2026

60

BOQ

BBB+

3,000,000

3,000,000

3.25%

1.68%

28/08/2018

29/08/2022

48

Westpac

AA-

2,000,000

2,000,000

1.80%

1.12%

15/11/2021

17/11/2025

48

P&N Bank

BBB

1,000,000

1,000,000

3.30%

0.56%

20/11/2018

21/11/2022

48

Bendigo-Adelaide

BBB+

1,000,000

1,000,000

3.25%

0.56%

30/11/2018

30/11/2022

48

BoQ

BBB+

1,000,000

1,000,000

2.15%

0.56%

8/07/2019

10/07/2023

48

Auswide

BBB

1,000,000

1,000,000

1.95%

0.56%

12/08/2019

12/08/2022

36

Judo Bank

BBB-

1,000,000

1,000,000

1.90%

0.56%

10/09/2019

9/09/2022

36

Auswide

BBB

1,000,000

1,000,000

1.72%

0.56%

3/10/2019

4/10/2022

36

ICBC

A

2,000,000

2,000,000

2.03%

1.12%

6/11/2019

6/11/2024

60

ICBC

A

2,000,000

2,000,000

1.83%

1.12%

28/11/2019

28/11/2024

60

Judo Bank

BBB-

1,000,000

1,000,000

1.30%

0.56%

3/12/2021

4/12/2023

24

ICBC

A

1,000,000

1,000,000

1.75%

0.56%

6/01/2020

8/01/2024

48

BOQ

BBB+

1,000,000

1,000,000

2.00%

0.56%

28/02/2020

28/02/2025

60

Police Credit Union

NR

1,000,000

1,000,000

2.20%

0.56%

1/04/2020

1/04/2025

60

ICBC

A

1,000,000

1,000,000

1.85%

0.56%

29/05/2020

29/05/2025

60

ICBC

A

1,000,000

1,000,000

1.86%

0.56%

1/06/2020

2/06/2025

60

ICBC

A

2,000,000

2,000,000

1.75%

1.12%

25/06/2020

25/06/2025

60

ICBC

A

2,000,000

2,000,000

1.75%

1.12%

25/06/2020

25/06/2025

60

ICBC

A

2,000,000

2,000,000

1.60%

1.12%

29/06/2020

28/06/2024

48

ICBC

A

3,000,000

3,000,000

5.07%

1.68%

30/06/2022

30/06/2027

60

ICBC

A

2,000,000

2,000,000

1.42%

1.12%

7/07/2020

8/07/2024

48

ICBC

A

2,000,000

2,000,000

1.50%

1.12%

17/08/2020

18/08/2025

60

BoQ

BBB+

1,000,000

1,000,000

1.25%

0.56%

7/09/2020

8/09/2025

60

BoQ

BBB+

2,000,000

2,000,000

1.25%

1.12%

14/09/2020

15/09/2025

60

NAB

AA-

1,000,000

1,000,000

0.60%

0.56%

14/09/2021

14/09/2023

24

AMP

BBB

1,000,000

1,000,000

3.30%

0.56%

25/05/2022

27/11/2023

18

ICBC

A

1,000,000

1,000,000

1.20%

0.56%

7/12/2020

8/12/2025

60

Warwick CU

NR

1,000,000

1,000,000

0.75%

0.56%

29/01/2021

30/01/2023

24

NAB

AA-

2,000,000

2,000,000

0.95%

1.12%

29/01/2021

29/01/2026

60

NAB

AA-

1,000,000

1,000,000

1.08%

0.56%

22/02/2021

20/02/2026

60

NAB

AA-

2,000,000

2,000,000

1.25%

1.12%

3/03/2021

2/03/2026

60

Summerland CU

NR

1,000,000

1,000,000

0.75%

0.56%

29/04/2021

28/04/2023

24

NAB

AA-

2,000,000

2,000,000

1.40%

1.12%

21/06/2021

19/06/2026

60

NAB

AA-

2,000,000

2,000,000

0.65%

1.12%

25/06/2021

26/06/2023

24

Westpac

AA-

2,000,000

2,000,000

1.32%

1.12%

25/06/2021

25/06/2026

60

ICBC

A

1,000,000

1,000,000

1.32%

0.56%

25/08/2021

25/08/2026

60

NAB

AA-

2,000,000

2,000,000

0.65%

1.12%

31/08/2021

31/08/2023

24

AMP

BBB

2,000,000

2,000,000

1.00%

1.12%

18/10/2021

17/10/2024

36

Westpac

AA-

2,000,000

2,000,000

1.56%

1.12%

30/11/2021

29/11/2024

36

Westpac

AA-

2,000,000

2,000,000

2.00%

1.12%

8/02/2022

10/02/2025

36

P&N Bank

BBB

2,000,000

2,000,000

2.40%

1.12%

9/03/2022

10/03/2025

36

P&N Bank

BBB

2,000,000

2,000,000

2.00%

1.12%

10/03/2022

11/03/2024

24

MyState

BBB

2,000,000

2,000,000

2.20%

1.12%

2/03/2022

3/03/2025

36

CBA

AA-

2,000,000

2,000,000

3.28%

1.12%

26/04/2022

26/04/2024

24

CBA

AA-

2,000,000

2,000,000

3.78%

1.12%

4/05/2022

6/05/2024

24

CBA

AA-

2,000,000

2,000,000

3.99%

1.12%

4/05/2022

5/05/2025

36

ING Bank

A

1,000,000

1,000,000

3.76%

0.56%

23/05/2022

23/05/2024

24

ICBC

A

2,000,000

2,000,000

3.95%

1.12%

6/06/2022

6/06/2024

24

Australian Unity

BBB+

2,000,000

2,000,000

4.15%

1.12%

8/06/2022

11/06/2024

24

Suncorp

A+

2,000,000

2,000,000

4.40%

1.12%

22/06/2022

14/12/2023

18

MyState

BBB

2,000,000

2,000,000

4.45%

1.12%

29/06/2022

28/06/2024

24

BoQ

BBB+

0

1,000,000

4.50%

0.56%

7/07/2022

7/07/2025

36

Total Medium Term Deposits

 

90,000,000

91,000,000

2.15%

50.35%

 

 

 

Floating Rate Notes - Senior Debt

 

 

 

 

 

 

 

 

Westpac

AA-

3,031,031

3,027,580

BBSW + 114

1.69%

24/01/2019

24/04/2024

63

NAB

AA-

2,014,473

2,018,922

BBSW + 104

1.13%

26/02/2019

26/02/2024

60

Westpac

AA-

2,511,711

2,518,285

BBSW + 88

1.41%

16/05/2019

16/08/2024

63

Suncorp

A+

1,249,692

1,247,660

BBSW + 78

0.70%

30/07/2019

30/07/2024

60

ANZ

AA-

2,003,723

2,008,776

BBSW + 77

1.12%

29/08/2019

29/08/2024

60

HSBC

AA-

2,502,431

2,508,237

BBSW + 83

1.40%

27/09/2019

27/09/2024

60

Bank Australia

BBB

1,504,386

1,506,415

BBSW + 90

0.84%

2/12/2019

2/12/2022

36

ANZ

AA-

1,502,181

1,502,857

BBSW + 76

0.84%

16/01/2020

16/01/2025

60

NAB

AA-

2,002,104

2,003,685

BBSW + 77

1.12%

21/01/2020

21/01/2025

60

Newcastle Permanent

BBB

1,100,306

1,101,912

BBSW + 112

0.62%

4/02/2020

4/02/2025

60

Macquarie Bank

A+

1,994,868

2,000,788

BBSW + 84

1.12%

12/02/2020

12/02/2025

60

BOQ Covered

AAA

551,895

552,932

BBSW + 107

0.31%

14/05/2020

14/05/2025

60

Credit Suisse

A+

1,304,477

1,306,992

BBSW + 115

0.73%

26/05/2020

26/05/2023

36

UBS

A+

1,498,498

1,496,078

BBSW + 87

0.84%

30/07/2020

30/07/2025

60

Bank of China Australia

A

1,500,157

1,498,914

BBSW + 78

0.84%

27/10/2020

27/10/2023

36

CBA

AA-

1,979,983

1,980,342

BBSW + 70

1.11%

14/01/2022

14/01/2027

60

Rabobank

A+

1,977,766

1,977,275

BBSW + 73

1.11%

27/01/2022

27/01/2027

60

Newcastle Permanent

BBB

977,788

979,802

BBSW + 100

0.55%

10/02/2022

10/02/2027

60

NAB

AA-

2,374,654

2,378,167

BBSW + 72

1.33%

25/02/2022

25/02/2027

60

Bendigo-Adelaide

BBB+

1,645,501

1,649,250

BBSW + 98

0.92%

17/03/2022

17/03/2025

36

ANZ

AA-

2,000,292

2,006,427

BBSW + 97

1.12%

12/05/2022

12/05/2027

60

NAB

AA-

1,704,907

1,710,969

BBSW + 90

0.96%

30/05/2022

30/05/2025

36

Total Floating Rate Notes - Senior Debt

 

38,932,825

38,982,266

 

21.81%

 

 

 

Fixed Rate Bonds

 

 

 

 

 

 

 

 

ING Covered

AAA

660,153

671,410

1.10%

0.38%

19/08/2021

19/08/2026

60

Northern Territory Treasury

AA-

3,000,000

3,000,000

1.00%

1.68%

24/08/2021

16/12/2024

40

Northern Territory Treasury

AA-

3,000,000

3,000,000

1.50%

1.68%

24/08/2021

15/12/2026

64

BoQ

BBB+

1,694,107

1,742,873

2.10%

0.98%

27/10/2021

27/10/2026

60

Northern Territory Treasury

AA-

2,000,000

2,000,000

1.50%

1.12%

6/08/2021

15/12/2026

64

Northern Territory Treasury

AA-

1,000,000

1,000,000

1.50%

0.56%

14/07/2021

15/12/2026

65

Northern Territory Treasury

AA-

2,000,000

2,000,000

1.30%

1.12%

29/04/2021

15/06/2026

61

Northern Territory Treasury

AA-

2,000,000

2,000,000

1.00%

1.12%

30/11/2020

15/12/2025

60

Northern Territory Treasury

AA-

1,000,000

1,000,000

1.00%

0.56%

20/11/2020

15/12/2025

61

Northern Territory Treasury

AA-

2,000,000

2,000,000

1.00%

1.12%

21/10/2020

15/12/2025

62

Total Fixed Rate Bonds

 

18,354,260

18,414,283

1.30%

10.30%

 

 

 

Managed Funds

 

 

 

 

 

 

 

 

NSW Tcorp

NR

1,682,237

1,743,981

3.67%

0.98%

17/03/2014

1/07/2027

159

Total Managed Funds

 

1,682,237

1,743,981

3.67%

0.98%

 

 

 

TOTAL CASH ASSETS, CASH
EQUIVALENTS & INVESTMENTS

 

179,904,394

178,748,258

 

100.00%

 

 

 

LESS: RIVERINA REGIONAL LIBRARY (RRL) CASH AT BANK

 

3,452,669

2,917,910

 

 

 

 

 

TOTAL WWCC CASH ASSETS, CASH
EQUIVALENTS & INVESTMENTS

 

176,451,725

175,830,348

 

 

 

 

 


 

Council’s investment portfolio is dominated by Term Deposits, equating to approximately 53% of the portfolio across a broad range of counterparties. Cash equates to 14%, with Floating Rate Notes (FRNs) around 22%, fixed rate bonds around 10% and growth funds around 1% of the portfolio.

 

Chart, pie chart

Description automatically generated

 

Council’s investment portfolio is well diversified in complying assets across the entire credit spectrum. It is also well diversified from a rating perspective. Credit quality is diversified and is predominately invested amongst the investment grade Authorised Deposit-Taking Institutions (ADIs) (being BBB- or higher), with a smaller allocation to unrated ADIs.

 

Chart, pie chart

Description automatically generated

 

All investments are within the defined Policy limits, as outlined in the Rating Allocation chart below:

 

Chart, bar chart

Description automatically generated

 

Investment Portfolio Balance

 

Council’s investment portfolio balance has remained steady over the past month, down slightly from $176.45M to $175.83M.

 

Table

Description automatically generated

 

Monthly Investment Movements

 

Redemptions/Sales – Council redeemed the following investment security during July 2022:

 

Institution and Type

Amount

Investment

Term

Interest

Rate

Comments

Community First Bank (Unrated) Term Deposit

$1M

7 months

1.00%

This term deposit was redeemed on maturity and funds were used to purchase a new 3-yr BoQ term deposit (as below).

 

New Investments – Council purchased the following investment security during July 2022:

 

Institution and Type

Amount

Investment

Term

Interest

Rate

Comments

BoQ (BBB+) Term Deposit

$1M

3 years

4.50%

The CBA rate of 4.50% compared favourably to the rest of the market for this term. The next best rate for this term was 4.33%.

 

Rollovers – Council did not rollover any investment securities during July 2022.

 

Monthly Investment Performance

 

Interest/growth/capital gains/(losses) for the month totalled $441,339, which compares favourably with the budget for the period of $131,951 - outperforming budget for the month by $309,388.

 

Council’s outperformance to budget for July was mainly due to a positive movement in the principal value of its Fixed rate bond portfolio. During the month, the principal value of Council’s fixed rate bonds rose by $55,934 (or 2.39%).

 

Council’s TCorp long term growth fund also experienced a positive return for the month, returning 3.67% (or $61,744) as domestic and international shares gained 5.75% and 7.89% respectively for the month of July.

 

Chart, line chart

Description automatically generated

 

In comparison to the AusBond Bank Bill Index* of 1.45% (annualised), Council’s investment portfolio returned 2.40% (annualised) for the month of July. Cash and At‑Call accounts returned 1.44% (annualised) for the month. These funds are utilised for daily cash flow management and need to be available to meet operating and contractual payments as they fall due.

 

Over the past year, Council’s investment portfolio has returned 1.33%, outperforming the AusBond Bank Bill index by 1.11%.

 

A screenshot of a computer

Description automatically generated with medium confidence

* The AusBond Bank Bill Index is the leading benchmark for the Australian fixed income market. It is interpolated from the RBA Cash rate, 1 month and 3-month Bank Bill Swap rates.

Report by Responsible Accounting Officer

I hereby certify that all of the above investments have been made in accordance with the provision of Section 625 of the Local Government Act 1993 and the regulations there under, and in accordance with the Investments Policy adopted by Council on 29 November 2021.

 

Carolyn Rodney

Responsible Accounting Officer

Policy and Legislation

Budget variations are reported in accordance with Council’s POL 052 Budget Policy.

 

Investments are reported in accordance with Council’s POL 075 Investment Policy.

 

Local Government Act 1993

Section 625 - How may councils invest?

 

Local Government (General) Regulation 2021

Section 212 - Reports on council investments

Link to Strategic Plan

Community Leadership and Collaboration

Objective: We have strong leadership

Outcome: We are accountable and transparent

 

Risk Management Issues for Council

This report is a control mechanism that assists in addressing the following potential risks to Council:

·        Loss of investment income or capital resulting from ongoing management of investments, especially during difficult economic times

·        Failure to demonstrate to the community that its funds are being expended in an efficient and effective manner

Internal / External Consultation

All relevant areas within the Council have consulted with the Finance Division in relation to the budget variations listed in this report.

 

The Finance Division has consulted with relevant external parties to confirm Council’s investment portfolio balances.

 

 

Attachments

 

1.

Capital Works Program 2022/23 to 2031/32

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-14

 

Table

Description automatically generated

Table

Description automatically generated

Table, calendar

Description automatically generated

Calendar

Description automatically generated

Application, table

Description automatically generated

Table

Description automatically generated

Calendar

Description automatically generated

Table, calendar

Description automatically generated

Table

Description automatically generated


Table

Description automatically generated

A picture containing table

Description automatically generated

Table

Description automatically generated


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-15

 

RP-15            RESOLUTIONS AND NOTICES OF MOTIONS REGISTERS

Author:                        Ingrid Hensley 

General Manager:    Peter Thompson

         

 

Summary:

This report provides Councillors with an update on the status of all resolutions of Council including Notices of Motion.

 

 

Recommendation

That Council receive and note the following registers:

a       Active Resolutions as at 16 August 2022

b       Active Notice of Motions as at 16 August 2022

c        Resolutions including Notice of Motions completed from 20 June 2022 to 16 August 2022

 

Report

The attached registers, outline details of each resolution with the following analysis provided as a snapshot as at 20 June 2022:

·    79 Active resolutions

·    21 Active Notices of Motions

·    36 resolutions including Notice of Motions have been completed from 20 June 2022 to 11 August 2022

 

Financial Implications

N/A

Policy and Legislation

Council’s Code of Meeting Practice

 

Link to Strategic Plan

Community Leadership and Collaboration

Objective: We are informed and involved in decision making

Outcome: Everyone in our community feels they have been heard and understood

 

Risk Management Issues for Council

N/A

Internal / External Consultation

N/A

 


 

Attachments

 

1.

Active Resolutions - Register - Provided under separate cover

 

2.

Active Notice of Motions - Register - Provided under separate cover

 

3.

Completed Resolutions - 20 June 2022 to 16 August 2022 - Provided under separate cover

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-16

 

RP-16            RESPONSES TO QUESTIONS WITH NOTICE

Author:          Scott Gray 

 

Summary:

This report is to provide responses to Questions With Notice raised by Councillors in accordance with the Code of Meeting Practice.

 

 

Recommendation

That Council receive and note the report.

 

Report

Councillor R Foley requested advice on Council’s contingencies, should there be significant rainfall event, taking into account current flooding of the Murrumbidgee River.

Council has a Flood Response Plan that details the actions to be undertaken for riverine and behind the levees flooding. This plan has been developed on tried and tested actions based on previous flood events and was enacted again in response to the riverine flooding event earlier this month. 

 

Councillor D Hayes requested further advice subsequent to the recent ABC report that stated Council is hopeful the new TfNSW Transport Plan will deliver more footpaths in the northern suburbs.

·   Can an explanation be provided in response to this report as he could not find any identified initiatives in the Plan stating that TfNSW that will deliver these footpaths?

·   If TfNSW are not, what is Council doing differently (other than what is already being done), now that  the TfNSW Transport Plan is released the Plan, who is funding the footpaths as outlined in the Plan, particularly given Council’s budget for footpaths?

The TfNSW Transport Plan refers to the Active Travel Plan Project which is a network of shared use paths for walking and cycling.  Figure 9 of the Transport Plan shows Completed and Future dual use paths in the northern suburbs.  There is a difference between a shared use path and a footpath in that a shared use path is a minimum of 2.5m wide whereas a footpath is typically 1.5m wide.

 

TfNSW in conjunction with Council has been funding the Active Travel Plan Project and there is further opportunities for this to continue into the future. Other funding opportunities are available with TfNSW to contribute to footpaths that are part of a Pedestrian Access Mobility Plan (PAMP). Councils PAMP is currently being reviewed and updated. The only other funding for footpaths in the northern suburbs is via developer contributions being collected as part of the Local Infrastructure Contributions Plan (Ref TT17).  Footpaths are also being constructed in the northern suburbs by developers as part of subdivision development. 

 

Councillor D Hayes requested advice on if Council are considering installing air filters in council buildings to reduce COVID transmissions?

Council is not considering installing air filters in its buildings. Where buildings can be opened up for natural ventilation, this is the preferred approach to reduce the risk of COVID transmission. Where Air Conditioning systems are installed, they have filtration systems in them in accordance with the Building Code of Australia requirements. The filtration systems are monitored and routinely serviced for filtration. 

 

 

Councillor R Kendall requested further information in relation to a Planning Proposal for rezoning in Forest Hill, specifically the process for notification and request for submission from business owners in the area, given that the  Wagga City Aero Club have advised they have been excluded from the process. Can this be confirmed and what the rectification will take place if required.

A planning proposal was lodged with Council on 12 May 2022 seeking an extension to the existing residential zoning both west and south of the existing Brunslea Park estate.

On preliminary assessment, there were a number of matters that needed up front discussions with government agencies prior to finalising assessment and making a recommendation to Council. These up-front discussions are not formal consultation that is required for planning proposals that are supported by Council.

As the planning proposal has not been reported to or supported by Council at this stage, there is no formal consultation being undertaken. If the proposal is supported, a report will be tabled at a Council meeting recommending the planning proposal be submitted to State Government for a Gateway Determination and if issued, the determination will required Council to undertake community consultation. This is when Wagga City Aero Club would be formally notified and included in the consultation process.  

 

Financial Implications

N/A

Policy and Legislation

Wagga Wagga City Council Code of Meeting Practice

Link to Strategic Plan

Community Leadership and Collaboration

Objective: We have strong leadership

Outcome: We have leaders that represent us

Risk Management Issues for Council

N/A

Internal / External Consultation

N/A  

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

RP-17

 

RP-17            QUESTIONS WITH NOTICE

Author:            Peter Thompson 

         

 

Summary:

This report is to list questions with notice raised by Councillors in accordance with Council’s Code of Meeting Practice.

 

 

Recommendation

That Council receive and note the report.

 

Report

No questions with notice were received in accordance with the Code of Meeting Practice for this meeting.

 

Financial Implications

N/A

Policy and Legislation

Code of Meeting Practice

 

Link to Strategic Plan

Community leadership and collaboration

Objective: Our community is informed and actively engaged in decision making and problem-solving to shape the future of Wagga Wagga

Ensure our community feels heard and understood

 

Risk Management Issues for Council

N/A

Internal / External Consultation

N/A

 

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

M-1

 

Committee Minutes

M-1                 FLOODPLAIN RISK MANAGEMENT ADVISORY COMMITTEE MINUTES MEETING 7 JULY 2022

Author:                        Silas Darby 

General Manager:    Peter Thompson

         

 

Summary:

The Floodplain Risk Management Advisory Committee met on 7 July 2022.

 

 

Recommendation

That Council:

a       receive the minutes of the Floodplain Risk Management Advisory Committee Meeting held on 7 July 2022

b       receive a further report on the process of appointment, terms of membership and termination for co-opted members

c        note separate report (RP-1) on the Peer Review of the 2018 Floodplain Risk Management Study and Plan (FRMSP)

 

Report

The Minutes of the Floodplain Risk Management Advisory Committee Meeting held on 7 July 2022 are presented to Council for consideration of recommendations below.

 

RP-1   Elect a Chairperson and Deputy Chairperson

Councillor D Tout was appointed Chair of the Floodplain Risk Management Advisory Committee for the term of the Committee.

 

Councillor J McKinnon was appointed Deputy Chair of the Floodplain Risk Management Advisory Committee for the term of the Committee.

 

RP-2   Terms of Reference – Review and Endorsement

The Committee endorsed the Floodplain Risk Management Committee Terms of Reference.

 

RP-3   Committee Co-opted Membership

The Committee recommended that Council:

·   support the appointment of co-opted members from time to time for identified areas in the Local Government Area which are subject to riverine or overland flooding

·   requested a further report on the process of appointment and terms of membership for co-opted members


 

RP-4   2022/23 Meeting Schedule

The Committee endorsed the schedule of meeting dates for 2022/23.

 

RP-5   Project update 2022

A separate report (RP-4) on the Peer Review of the 2018 Floodplain Risk Management Study and Plan (FRMSP) is presented to Council for consideration at this meeting.

 

Financial Implications

N/A

Policy and Legislation

Code of Conduct

Code of Meeting Practice

 

Link to Strategic Plan

Community Leadership and Collaboration

Objective: We are informed and involved in decision making

Outcome: Everyone in our community feels they have been heard and understood

 

Risk Management Issues for Council

N/A

Internal / External Consultation

N/A

 

 

Attachments

 

1.

FRMAC Meeting Minutes - 7 July 2022

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

M-1

 


Text, letter

Description automatically generated

Text

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

M-2

 

M-2                 LOCAL TRAFFIC COMMITTEE MEETING - 27 JULY 2022

Author:         Warren Faulkner 

         

 

Summary:

The Local Traffic Committee met for an ordinary meeting on 27 July 2022 and considered five (5) formal reports.

The Committee were unanimous with the officer recommendation for four (4) of the formal reports.  The officer recommendation to install a ‘No U-Turn’ sign on Fitzmaurice Street at the Gurwood Street Traffic Signals did not receive the support of the Committee.

The Committee have been sent the draft minutes and there has been no feedback received to date.

The Minutes are attached for Councillors reference.

 

 

Recommendation

That Council:

a       receive the minutes of the Local Traffic Committee Meeting held on 27 July 2022

b       install STOP signs and associated STOP lines utilising R1-1 series signs on

i.   The southern end of Bardo Lane at the intersection of Morgan Street facing southbound traffic and prior to the footpath

ii.  The northern end of Bardo Lane at the intersection of Forsyth Street facing northbound traffic and prior to the footpath

c        note the Traffic Committees advice not to approve changes to the Children’s Crossing located on William Street, North Wagga Wagga that would involve the installation of a Pedestrian Crossing

d       install two (2) Mobility Parking Spaces on southern kerb of Johnston Street, east of the intersection of Church Street as per the attached diagram

e       endorse Transport for NSW’s installation of regulatory signs and lines at the intersection of Murray Street and Edward Street as per Transport for NSW plans DS2019/001186 Sheets RF-0720 to RF0722 dated 7 June 2022 noting the installation is in accordance with the Transport for NSW delineation manual, the Transport for NSW Guide to Signposting and the Australian Standard 1742 sweet of manuals for uniform traffic control

 

Report

RP-1          Bardo lane - STOP signs

 

This matter was reported to the May 2022 meeting of the Traffic Committee in response to a customer request which highlighted a safety issue for pedestrians using the northern footpath of Morgan Street at the intersection of Bardo Lane.

 

The Committee requested further investigation into this item before making a recommendation to Council.  This was completed by Councils Traffic Officers who updated the Committee to advise that drivers exiting the southern end of Bardo Lane are unsighted from pedestrians to their left until they have entered the traffic lane due to the building alignment being directly adjacent to the laneway and the footpath. Pedestrians are also unsighted from vehicles in the laneway when approaching the intersection from the east.

 

There are currently no controls at the intersection and the addition of a STOP sign with painted STOP line will enhance pedestrian safety.

 

The Committee considered and endorsed the Traffic Officers recommendations to install STOP signs and holding lines on either end of Bardo Lane between Morgan Street and Forsyth Street.

 

RP-2          NO U-TURN Fitzmaurice street and Gurwood street

The following Question with Notice was raised at the Ordinary Meeting of Council on 29 November 2021.

Can Council give consideration to installing a no U-turn at the lights of Gurwood and Fitzmaurice Streets for those travelling north?

Councils Traffic Officers recommended to the Committee the installation of a R2-5N NO U-TURN sign on the centre median in Fitzmaurice Street approximately 25 metres south of the traffic control lights at the intersection of Gurwood Street.

The Transport for NSW member provided advice in relation to the Centre for Road Safety and the Transport for NSW Signs and Lines Guidelines which do not support the installation of a NO U-TURN sign as recommended.

The recommendation on being put to the Committee was not supported.  No amendment to the recommendation was proposed and the recommendation was lost.  No further action is proposed in relation to this request.

 

RP-3          Children's crossing - William Street North Wagga Wagga

 

This report was referred to the Committee for their consideration and advice following consultation with the School Principle and the P&C as resolved by Council at its 7 March 2022 meeting.

 

Councils Senior Traffic Officer recommended to the Committee to not approve changes to the Children’s Crossing located on William Street, North Wagga Wagga that would involve the installation of a Pedestrian Crossing.

The Committee considered and endorsed the recommendation, noting the visibility of current road markings and school zone signposting.  Further consideration of additional signs and road markings for the school zone in William Street between Elizabeth Street and Hampden Avenue will be investigated. Council’s Traffic Section will progress discussions with Transport for NSW.

 

 

RP-4          Mobility Parking - Johnston Street

 

This report was for the endorsement of two DDA (Disability Discrimination Act) compliant mobility parking spaces adjacent to the entrance of the Riverside Stage 2 project at the end of Johnson Street.

 

The construction of the two optimised disabled parks with pram ramps linking to the connecting path to the Riverside Precinct will allow access to the playground and facilities, alleviating the requirement for disabled parking in the adjacent carpark and subsequent access requirement issues that may arise from that location. 

 

The Committee endorsed the Traffic Officers Recommendation

 

RP-5       Murray street and Edward street intersection - new traffic controls

 

The Committee considered a report outlining Transport for New South Wales plans to upgrade the intersection with Murray Street which will include the installation of traffic control light signals. As a result, changes to signage and line marking on all approaches to the intersection will be required.  On-Street parking on Edward Street between Oates Avenue and Lewis Drive will be lost when the upgrade is complete.

 

Discussion included the ability of residents to reverse safely out of their driveway onto Edward street and whether congestion would increase with the new facility. The Transport for NSW project manager was at the meeting and explained how the phasing of the lights would ensure sufficient time for drivers to safely reverse from driveways. The system which controls the phasing of the traffic control lights (SCAT) is automatically adjusted according to the volume of traffic identified by the sensors located in the roadway at each point of the intersection.

 

Transport for NSW have consulted with adjoining residents that are impacted by the upgrade. 

 

Financial Implications

There are no financial implications outside of existing Council project budgets and operating budgets for signs and line marking associated with this report.  The Murray Street and Edward Street intersection works are being undertaken and funded by Transport for NSW.

Policy and Legislation

Transport Administration Act 1998 – Delegations to Councils, regulation of traffic

TfNSW – A guide to the delegation to Councils for the regulation of traffic

Australian Standards

 

 

Link to Strategic Plan

Community Leadership and Collaboration

Objective: We are informed and involved in decision making

Outcome: Everyone in our community feels they have been heard and understood

 

Risk Management Issues for Council

N/A

Internal / External Consultation

As outlined in the body of the report.

 

Attachments

 

1.

Local Traffic Committee Minutes - 27 July 2022

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 22 August 2022

M-2

 

   Text

Description automatically generated


 


 

 


 

 


Report submitted to the Confidential Meeting of Council on Monday 22 August 2022

CONF-1

 

Confidential Reports

CONF-1         RFT2023-07 CONCRETE WORKS AT THE LIVESTOCK MARKETING CENTRE SHEEP YARDS DESIGN AND CONSTRUCT

Author:                        Ray Graham 

General Manager:    Scott Gray

 

This report is CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, which permits the meeting to be closed to the public for business relating to the following: -

(d) (i)     commercial information of a confidential nature that would, if disclosed, prejudice the commercial position of the person who supplied it.        

 

 


Report submitted to the Confidential Meeting of Council on Monday 22 August 2022

CONF-2

 

CONF-2         PROPOSED RENEWAL OF LEASES - 36-40 GURWOOD STREET, WAGGA WAGGA

Author:                        Matthew Dombrovski 

General Manager:    Scott Gray

 

This report is CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, which permits the meeting to be closed to the public for business relating to the following: -

(d) (i)     commercial information of a confidential nature that would, if disclosed, prejudice the commercial position of the person who supplied it.        

 

 

 


Reports submitted to the Ordinary Meeting of Council to be held on Monday 22 August 2022.


Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text

Description automatically generated

Text

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated

Text, letter

Description automatically generated



[1] Based on the average cost of two local suppliers inclusive of 10% contingency and 10% project management

[2] Based on the average cost of two local suppliers inclusive of 10% contingency and 10% project management

[3] Cost estimates provided from a local supplier of advanced trees