AGENDA AND BUSINESS PAPER

 

 

Ordinary Meeting of Council

 

 

 

To be held on
Monday

30 January 2017

AT 6.00pm

 

 

 

Cnr Baylis and Morrow Streets,
Wagga Wagga NSW 2650
PO Box 20, Wagga Wagga

 

Phone: 1300 292 442
Fax: 02 6926 9199
Website: www.wagga.nsw.gov.au


NOTICE OF MEETING

In pursuance of the provisions of the Local Government Act, 1993 and the Regulations there under, notice is hereby given that an Ordinary Meeting of the Council of the City of Wagga Wagga will be held in the Council Chamber, Civic Centre, Corner Baylis and Morrow Streets, Wagga Wagga, on Monday 30 January 2017 at 6.00pm.

 

 

 

Mr Alan Eldridge

General Manager

 


WAGGA WAGGA CITY COUNCILLORS

 

 

Mayor

Councillor Greg

Conkey OAM

Deputy Mayor

Councillor Dallas Tout

Councillor Yvonne Braid

Councillor Paul Funnell

Councillor Dan Hayes

Councillor Vanessa Keenan

Councillor Rod Kendall

Councillor Tim Koschel

Councillor Kerry Pascoe

 

 

 

 

 

 

 

 

QUORUM

The quorum for a meeting of the Council is a majority of the Councillors of the Council who hold office for the time being who are eligible to vote at the meeting.


COUNCIL MEETING ROOM

 

 

 

 


Reports submitted to the Ordinary Meeting of Council to be held on Monday 30 January 2017.

Ordinary Meeting of Council AGENDA AND BUSINESS PAPER

Monday 30 January 2017

ORDER OF BUSINESS:

CLAUSE               PRECIS                                                                                            PAGE

PRAYER                                                                                                                       3

ACKNOWLEDGEMENT OF COUNTRY                                                                          3

APOLOGIES                                                                                                                 3

CONFIRMATIONS OF MINUTES

CM-1                ORDINARY COUNCIL MEETING - 12 DECEMBER 2016                        3

DECLARATIONS OF INTEREST                                                                                    3

Motions Of Which Due Notice Has Been Given

NOM-1              NOTICE OF MOTION - RIVER SAFETY PROGRAM                               4

NOM-2              NOTICE OF MOTION - CONFERENCE CENTRE PROJECT                   6

Reports from Staff

RP-1                 DA16/0585 - MULTI-DWELLING HOUSING - 2 x 3 BED DWELLINGS (EXISTING DWELLING RETAINED) - 16B BROAD STREET WAGGA WAGGA NSW 2650                                                                                                             7

RP-2                 DA16/0660 - ALTERATIONS AND ADDITIONS INCLUDING THIRD STOREY AND SECONDARY DWELLING - 58 LAKEHAVEN DRIVE, LAKE ALBERT, Lot 16 DP 775377                                                                                                53

RP-3                 DA16/0364 - SHOP TOP HOUSING 2 BEDROOM DWELLING            119

RP-4                 ANNUAL DISCLOSURE OF PECUNIARY INTEREST RETURNS - NEW COUNCILLORS AND DESIGNATED STAFF                                       160

RP-5                 PROPOSED ESTABLISHMENT OF A DETENTION BASIN ON LOT 2 DP 702330 AT BOOROOMA                                                                                162

RP-6                 FINANCIAL PERFORMANCE REPORT AND QUARTERLY BUDGET REVIEW AS AT 31 DECEMBER 2016                                                                    175  

Committee Minutes

M-1                   RIVERINA REGIONAL LIBRARY ADVISORY COMMITTEE MINUTES - 30 NOVEMBER 2016                                                                              192  

QUESTIONS/BUSINESS WITH NOTICE                                                                     204

Confidential Reports

CONF-1            DISCHARGE OF MORTGAGE                                                           205

CONF-2            WAGGA WAGGA MAIN CITY LEVEE – STAGE 1 TENDER AND REVIEW OF ENVIRONMENTAL FACTORS DETERMINATION                               206

 

 

CONF-3            RFT2017/05 SUPPLY OF SWIMWEAR AND ACCESSORIES              207

CONF-4            RFT2017/12 HIRED PLANT, FLEET AND EQUIPMENT                      208

CONF-5            EXTRAORDINARY AUDIT AND RISK COMMITTEE MINUTES - 15 DECEMBER 2016                                                                                                  209  

 


PRAYER

 

 

ACKNOWLEDGEMENT OF COUNTRY

 

 

APOLOGIES

 

 

Confirmation of Minutes

CM-1              ORDINARY COUNCIL MEETING - 12 DECEMBER 2016       

 

Recommendation

That the Minutes of the proceedings of the Ordinary Council Meeting held on 12 December 2016 be confirmed as a true and accurate record.

 

 

Attachments  

1.

Minutes - Ordinary Council Meeting - 12 December 2016

210

 

 

 

DECLARATIONS OF INTEREST

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                    NOM-1

 

Motions Of Which Due Notice Has Been Given

NOM-1           NOTICE OF MOTION - RIVER SAFETY PROGRAM

Author:          Councillor Vanessa Keenan

 

Analysis:

There are concerns surrounding recreational use of the Murrumbidgee River and suggestions for a consistent and effective safety awareness campaign to be developed.

 

 

Recommendation

That Council, In consultation with Royal Lifesaving Australia and other relevant  stakeholders, Council investigate options for improving safety at Wagga Beach and Wiradjuri Reserve as part of the 2017/18 budget process that includes:

a       review of safety signage and costed recommendations

b       review of potential costs as well as investigating the effectiveness of reinstating a lifeguard program at Wagga Beach

c        development and implementation of an annual river safety communications campaign through social media and existing Council communication platforms

 

Key Reasons

·        The areas of Wagga Beach and Wiradjuri Reserve have undergone significant improvement works in recent years as part of the implementation of the Riverside Wagga Wagga Strategic Plan. 

 

·        Patronage of these areas by locals and visitors has increased as a result and future works are intended to continue this trend of greater passive and active recreation alongside and on the Murrumbidgee River in Wagga.

 

·        It is a shared responsibility of Council, other agencies and the broader community that we maintain a strong awareness of not only the benefits but the inherent dangers of inland waterways, particularly the Murrumbidgee River which is one of the most dangerous rivers in the country for fatal drowning’s.

Financial Implications

Any change in Council priorities or redirection of funding will have an impact on Council’s budget. The financial implications will be addressed in the subsequent report if this recommendation is passed.

Policy

N/A

 

Link to Strategic Plan

2. We are a safe and healthy community

2.1 We live in a safe community

 

Risk Management Issues for Council

Any change in Council priorities will have an impact on Council’s Risk Management. Any changes will be addressed in a subsequent report if this recommendation is passed.

Internal / External Consultation

N/A

 

  

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                    NOM-2

 

NOM-2           NOTICE OF MOTION - CONFERENCE CENTRE PROJECT

Author:          Councillor Dan Hayes

 

Analysis:

With the recent announcement for a conference centre to be built for the Clay Target Association, this may impact upon current and future plans of Wagga Wagga City Council and other organisations.

 

 

Recommendation

That Council receives:

a       a report and/or Councillor workshop on the impact of the proposed clay target building to the current plans for a multi-purpose stadium at Equex, masterplan for Bolton Park, and the recently approved PCYC building, as well as any other future plans impacting upon a conference centre

b       a report that examines strategies on how to work closer with State and Federal members to avoid replication of facilities and allow planning to occur that can factor in all options

 

Key Reasons

A conference centre is needed for Wagga Wagga and has for some time. It is acknowledged that there has been considerable work done across a number of years which has led to the planning of a range of options in different stages of planning. With the surprise announcement from the State Member there is concern about the replication of resources with the possibility that none will meet the needs of the City.

 

This extends beyond just a conference centre as some of the buildings are multi-purpose and these facilities need consideration.

Financial Implications

Any change in Council priorities or redirection of funding will have an impact on Council’s budget. The financial implications will be addressed in the subsequent report if this recommendation is passed.

Policy

N/A

Link to Strategic Plan

1. We are an engaged and involved community

1.2 We have opportunities and places for connection

Risk Management Issues for Council

No specific issues identified.

Internal / External Consultation

N/A  


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                       RP-1

 

Reports from Staff

RP-1               DA16/0585 - MULTI-DWELLING HOUSING - 2 x 3 BED DWELLINGS (EXISTING DWELLING RETAINED) - 16B BROAD STREET WAGGA WAGGA NSW 2650

Author:                        Duck, Johanna

Sector Manager:       Somerville, Paul

         

Analysis:

The report is for a development application and is presented to Council for decision. The application has been referred to Council for determination as the application seeks to vary two numeric controls of the Wagga Wagga Development Control Plan 2010 (DCP) by greater than 10%.

 

 

Recommendation

That Council approve DA16/0585 for multi-unit development at 16B Broad Street Wagga Wagga NSW 2650, subject to the conditions outlined in the Section 79C Assessment Report for DA16/0585.

 

 

Development Application Details

 

Applicant

FIMJO Pty Ltd – Mrs Jemma Hogg

Owner

FIMJO Pty Ltd

Development Cost

$410,000.00

Development Description

Construction of two additional dwellings at the rear of the existing dwelling to create a three-unit multi dwelling housing development.

 

Key Issues

 

·    Scale of development on the land

·    Amenity of the subject dwellings and surrounding residential developments

·    Visual impacts and streetscape

 

There are multiple unit developments in this area and approval of this development is consistent with the zone objectives for the R3 zone and would not set an unwanted precedent in the locality. Any similar developments would require a development application (DA). Those DA’s would be subject to the same scrutiny, assessment and notification as this development and would be assessed on their merits including consideration of the impacts on the streetscape and surrounding developments and consideration of any submissions received.

 

 

The application was notified in accordance with the provisions of the DCP. One submission in the form of an objection was received during the notification period and is addressed within the Section 79C Assessment Report.

 

Assessment

 

Criteria for the Development Application Report

 

Determination Body Reason:

 

In accordance with Clause 1.11 “Complying with the Wagga Wagga Development Control Plan 2010” of the Wagga Wagga Development Control Plan 2010 the application has been referred to Council for determination:

 

·        as one numeric control is varied by greater than 10% in relation to this proposal.

·        as adequate justification is provided by the applicant for the number of controls being varied in relation to this proposal.

 

Control C1 requires that for multi-dwelling development the maximum site coverage in the R3 zone is 40%. The site coverage proposed is 53.19%.

 

The applicant is seeking a variation of greater than 10% of the maximum permitted site cover which cannot be determined under delegation by Council Staff. The applicant has provided reasonable justification and has shown the development is consistent with the objectives of the R1 General Residential Zone and Objectives of Section 9.3.2 as summarised below:

 

·     The proposed single storey units have been designed as single storey to be consistent with surrounding developments, both in scale and function, retaining compatibility with the site context.

·     Single storey residences allow privacy to be maintained.

·     A 50% site cover is permitted on the opposite side of the street (as shown in the map at the beginning of this report).

·     The proposed site cover is 53.19% and would be a variation of less than 10% if the site was located on the opposite side of the street and able to be determined under delegation.

·     The R3 zone has a maximum area per dwelling to maximise development on the lot. The development complies with these provisions ensuring that the development site is of sufficient size for the proposed development.

·     Adequate areas (as modified by conditions) are provided for access, parking and landscaping, useable garden and outdoor areas and natural runoff.

·     The 40% site cover is inappropriate for the R3 zoning to encourage higher density. It is unclear why only parts of Broad St were included in the higher site cover provisions.

 

The development complies with all other controls and where necessary impacts will be controlled via conditions. Considering this and the above justification it is recommended the application be supported because assessment has shown that the proposed site cover of 53.19% is appropriate for this development site because reasonable amenity is achieved for the subject lot and maintained for the adjoining lots and there are no likely adverse impacts from this development occurring.

 

Reasons for Approval

 

The applicant has provided reasonable justification for the proposed development and only one submission against the proposal was received.

 

The development complies with the objectives of the LEP and DCP as outlined in the Section 79C Assessment Report.

 

This particular development is recommended for approval because it has merit and is acceptable development for the lot.

 

The total area of development on the lot is acceptable and should be supported because:

 

·    Reasonable amenity is maintained for the proposed dwellings and the surrounding lots;

·    There are minimal impacts to the locality;

·    The development is consistent with the objectives for the R3 Medium Density Residential Zone;

·    The close proximity of the site to the CBD encourages greater patronage within the CBD; and

·    The site directly adjoins the area where 50% site cover is permitted.

 

The dwellings are acceptable in their location at the rear of the existing dwelling on the lot and are typical of multi dwelling development in Wagga Wagga.

 

Site Location

 

The site is identified as 16B Broad Street Wagga Wagga, Lot 1 DP534496. The site is located on the west side of Broad Street approximately 160m south from the intersection with Travers Street in the residential area of Central Wagga Wagga.

 

There is a park located diagonally opposite, to the north-east of the site. A vehicle access Laneway runs along the north side of the site. The area has a mix of two storey and single dwellings and multi-unit and dwelling house developments.

 

 

Financial Implications

N/A

Policy

Wagga Wagga Local Environmental Plan 2010

Wagga Wagga Development Control Plan 2010

 

Link to Strategic Plan

4. We have a sustainable natural and built environment

4.2 We plan for resilient and sustainable built environments

 

Risk Management Issues for Council

Approval raises no risk management issue and will not create an undesirable precedent. Refusal of the application may result in an appeal process in the Land and Environment Court which will have to be defended by Council. The reasons for refusal will have to be justified and withstand scrutiny and cross examination in Court.

 

 

Internal / External Consultation

Standard internal Council referrals of the application occurred. The application is supported, subject to conditions.

 

Notification and Advertising was conducted to properties surrounding the development between 7/11/16 and 21/11/16. One submission in the form of an objection was received during the notification process.

 

See the Section 79C Assessment report for full details of all consultation.

 

Attachments  

1.

DA16/0585 - 79C Report

 

2.

DA16/0585 Plans

 

3.

DA16/0585 Site Photos

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                 RP-1

 

 

ww_council

 

 

Report of Development Application

Pursuant to Section 79C of the Environmental Planning and Assessment Act 1979

 

 

 

APPLICATION DETAILS

 

Application No.:

DA16/0585

 

Modification No.:

N/A

 

Council File No.:

D/2016/0585

 

Date of Lodgement:

05/10/2016

 

Applicant:

Fimjo Pty Ltd

Po Box 5434

WAGGA WAGGA  NSW  2650

 

Proposal:

Multi Dwelling Housing – 2 x 3 bed dwellings (existing dwelling retained)

 

BCA Classification:

1a & 10a

 

Development Cost:

$410,000

 

Assessment Officer:

Johanna Duck

 

Description of Modification:

N/A

Type of Application:

Development Application

Other Approvals:

Nil

Concurrence Required:

No

Referrals:

Internal

Adjoining Owners Notification:

Yes - 7/11/16 to 21/11/16

Advertising:

Yes - 7/11/16 to 21/11/16

Determination Body:

Council

Reason:

Under the provisions of Section 1.11 of the DCP 2010, Council officers do not have delegation to consider variations where any numeric control is being varied by greater than 10%. This development application involves a variation of Control C1 of Section 9.3.2 of the DCP of greater than 10% to permit a site cover of 53.19%, instead of the 40% site cover permitted by the control.

Meeting Date:

30/1/16

 

Owner’s Consent Provided:

Yes - 5/10/16

 

Location:

The site is located on the west side of Broad Street approximately 160m south from the intersection with Travers Street in Central Wagga Wagga.

 

 

SITE DETAILS

 

Subject Land:

16B Broad St WAGGA WAGGA  NSW  2650

 

Lot 1 DP 534496

Owner:

Fimjo Pty Ltd

 

 

PLANNING CONTROLS / STATUTORY CLASSIFICATION

 

Pursuant to Part 4 (Division 1)

 

Environmental Planning Instrument:

Wagga Wagga Local Environmental Plan 2010

Zoning:

R3 Medium Density Zone

Land Use Definition: 

Multi Dwelling Housing

Statement of Permissibility:

Permissible with Consent

 

Description of Development

The proposal is for the addition of two free-standing single storey dwellings to the rear of the existing dwelling house creating a 3 unit multi-dwelling development.

 

Proposed units 1 and 2 share the same floor plan and have an area of 192.7sqm. Each unit will have 3 bedrooms and attached double garage.

 

Access to the rear units is from the Laneway located at the side of the subject lot.

 

Subdivision does not form part of this development.

 

The Site and Locality

The site is identified as 16B Broad Street Wagga Wagga, Lot 1 DP534496.

 

The site is located on the west side of Broad Street approximately 160m south from the intersection with Travers Street in the residential area of Central Wagga Wagga.

 

There is a park located diagonally opposite, to the north-east of the site.

 

A vehicle access Laneway runs along the north side of the site.

 

The area has a mix of two storey and single dwellings and multi-unit and dwelling house developments.

 

Easements and Covenants

The subject land has no easements and no covenants.

 

Previous Development Consents

The subject land has consent for the dwelling and garage, BA129/69.

 

REASON FOR REFERRAL TO COUNCIL

 

This application seeks approval to vary one of the numeric controls of the Wagga Wagga Development Control Plan 2010 (DCP) by greater than 10% and cannot be determined under delegation by Council Staff.

 

This application seeks approval for a site cover of 53.19%.

 

The total permitted site cover for the subject lot is limited to a maximum of 40% of the area of the lot. A variation to permit a site cover of 53.19% of the lot area is proposed by the Applicant which is a variation of greater than 10% and cannot be determined under delegation by Council Staff. This is a variation to DCP Section 9.3.2 Control C1.

 

(Note: this would be a variation of less than 10% which would be permitted to be determined under delegation if the lot was located within the area defined below).

Area indicated by heavy black edging indicates land within the R3 Zone adjoining the city centre where a 50% maximum site cover is permitted.

 

KEY ISSUES DISCUSSED WITHIN THIS REPORT

 

-     Scale of development on the land

-     Amenity of the subject dwellings and surrounding residential developments

-     Visual impacts and streetscape

There are multiple unit developments in this area and approval of this development is consistent with the zone objectives for the R3 zone and would not set an unwanted precedent in the locality. Any similar developments would require a development application (DA). Those DA’s would be subject to the same scrutiny, assessment and notification as this development and would be assessed on their merits including consideration of the impacts on the streetscape and surrounding developments and consideration of any submissions received.

 

MATTERS FOR CONSIDERATION PURSUANT TO SECTION 79C(1)

 

Section 79C(a)(i) - The provisions of any environmental planning instrument (EPI)

 

Wagga Wagga Local Environmental Plan 2010

 

Under the provisions of the WWLEP2010, the subject site is within the R3 Medium Density Zone.

 

The development is permissible with consent.

 

Part 2 Permitted or prohibited development Land Use

 

1   Objectives of zone

-     To provide for the housing needs of the community within a medium density residential environment.

-     To provide a variety of housing types within a medium density residential environment.

-     To enable other land uses that provide facilities or services to meet the day to day needs of residents.

-     To ensure that medium density residential environments are of a high visual quality in their presentation to public streets and spaces.

 

Comment: The proposed multi dwelling housing development is permitted with consent. The application is seeking consent and is consistent with the relevant R3 Medium Density zone objectives as the development is residential accommodation that has an appropriate density for the zone, the development has an architectural character that is consistent with other developments in the R3 zone and locality. The retention of the front dwelling maintains the existing low scale character and existing presentation to the street and the rear units present a typical ‘new build’ appearance with high quality frontages to the laneway.

 

Part 3 Exempt & Complying Development

 

Comment: There are no exemptions or complying provisions for multi-dwelling developments within the LEP.

 

Part 4 Principal development standards

 

Comment: There are no clauses under Part 4 of the LEP relevant to this development as the land is within the R3 zone and is not subject to the lot size, height of building, or floor space ratio maps.

 

Part 5 Miscellaneous Provisions

 

5.9   Preservation of trees or vegetation

The objective of this clause is to preserve the amenity of the area, including biodiversity values, through the preservation of trees and other vegetation.

 

Comment: The SEE states that the established trees at the front of the lot will be retained. A condition has been imposed requiring the submission of a landscape plan showing the trees will be retained.

 

There are no other clauses under Part 5 of the LEP relevant to this development.

 

Part 6 Urban Release Areas

 

Comment: The development is not located in an urban release area.

 

Part 7 Additional Local Provisions

 

7.2 Flood Planning

The objectives of this clause are as follows:

(a) to minimise the flood risk to life and property associated with the use of land,

(b) to allow development on land that is compatible with the land’s flood hazard, taking into account projected changes as a result of climate change,

(c)  to avoid significant adverse impacts on flood behaviour and the environment.

 

Comment: Mapping shows that the site is flood prone and is affected by the 100 year ARI flood events. The Wagga Wagga Floodplain Risk Management Study 2009 identifies flood risk precincts. The subject site is located in Central Wagga Wagga and is protected by the main city levee. The study identifies the location as a low flood risk area. Although the locality is protected by the main city levee, it only provides protection to a level below the 1:100 ARI flood event. Major flood events may have an impact on development within Central Wagga Wagga. The development has been considered against the relevant provisions. Conditions have been imposed and the development is compatible with the flood hazard of the land.

 

7.6 Groundwater vulnerability

The objective of this clause is to protect and preserve groundwater sources.

 

Comment: The land is mapped as being subject to groundwater vulnerability. The proposed use is for dwellings and is not a development type that will impact groundwater and therefore the provisions of this clause are not relevant to this development.

 

There are no other clauses under Part 7 of the LEP relevant to this development.

 

State Environmental Planning Policies (SEPPs)    

 

This assessment has considered provisions of the SEPP (Exempt and Complying Development Codes) 2008 and the SEPP (Building Sustainability Index: BASIX) 2004. All works proposed require consent and a BASIX Certificate is not required for this development. There are no other SEPPs relevant to this development.

 

Section 79C(1)(a)(ii) - Any proposed instrument that is or has been the subject of public consultation under this Act and that has been notified to the consent authority

 

No relevant planning instrument under this clause is currently the subject of public exhibition or comment.

 

Section 79C(1)(a)(iii) - The provisions of any development control plan

 

Wagga Wagga Development Control Plan 2010

 

Proposed development complies with the development standards of the Wagga Wagga Development Control Plan 2010 as follows:

 

 

1.10 Notification of a Development Application

 

Comment: The application was notified to adjoining neighbours and advertised from 7/11/16 to 21/11/16 in accordance with the provisions of the DCP. One submission was received during the notification period the concerns raised are addressed below.

 

1.   Site Management during Construction and associated impact on the use of the street.

The development will be subject to normal standard Council restrictions for use of Council land including laneways. It will also be subject to Work Cover provisions that require the safe management of construction sites. Vehicle parking/obstruction of the laneways will not be permitted without relevant permits being in place and will be controlled by conditions. Parking on the street during construction is common place and acceptable provided the parking is in accordance with relevant road rules. The site inspection confirmed that there is sufficient on-street parking available and it is legally permitted in the immediate area surrounding the development site with no restrictions.

 

2.   Further future development likely if this goes ahead

Council cannot consider the impacts of any speculation for future development that may or may not occur in the future. Future two storey developments were mentioned and these developments are permitted in the R3 zone however require consent from Council and would be subject to a full assessment and notification provisions providing opportunity for public submissions.

 

3.   Loss of off-street parking in the area

There is no reliance on off-site parking for this development and the required parking for each dwelling is provided on the subject lot. Access to on-site parking is consistent with the Australian Standards ensuring safe and easy access at all times. The only time that on street parking is likely to be impacted is during construction and this will be a short term impact.

 

4.   Loss of amenity

The provisions of the DCP are enforced to ensure amenity is maintained to a reasonable level. The development complies with the controls of the DCP and meets all standards ensuring the amenity of the area and surrounding dwellings is maintained.

 

5.   Need for a Traffic study

 

The NSW RMS guidelines for traffic generating developments state that for residential developments a typical dwelling will create one additional vehicle movement on average per dwelling during peak hour. This is not significant compared to the existing vehicle movements in the laneway and within Broad Street. As Wagga Wagga’s road network is not at capacity this development is acceptable and the minor increase in traffic does not warrant a traffic study or referral to Councils Traffic Committee to be undertaken as the road network is capable of carrying the expected traffic.

 

RMS August 2013 Guide to Traffic Generating Developments Updated traffic surveys - Summaries of land use traffic generation Low density residential dwellings Rates state:

-     Daily vehicle trips = 7.4 per dwelling in regional areas

-     Weekday average evening peak hour vehicle trips = 0.78 per dwelling in regional areas (maximum 0.90).

-     Weekday average morning peak hour vehicle trips = 0.71 per dwelling in regional areas (maximum 0.85).

 

6.   Impacts of the multi-unit development at 15 Broad Street

 

The impacts on amenity associated with the construction of the approved development at 15 Broad Street have been considered in general terms. The design of the subject development has been considered in terms of the zone objectives, DCP provisions relating to site design and context including architectural character and desired outcomes for the R3 zone. Amenity and hours of construction for the proposed development will be controlled by conditions of consent.

 

Overall there are no concerns raised above that warrant a recommendation for refusal of this application. There are no significant adverse impacts and where required the environmental impacts from this development will be controlled by the conditions of consent.

 

 

1.11 Complying with the Wagga Wagga Development Control Plan 2010

 

Comment: This application seeks approval to vary one of the numeric controls of the Wagga Wagga Development Control Plan 2010 (DCP) by greater than 10% and cannot be determined under delegation by Council Staff.

 

This application seeks approval for a site cover of 53.19%.

 

The total permitted site cover for the subject lot is limited to a maximum of 40% of the area of the lot. A variation to permit a site cover of 53.19% of the lot area is proposed by the Applicant which is a variation of greater than 10% and cannot be determined under delegation by Council Staff. This is a variation to DCP Section 9.3.2 Control C1.

 

Reasonable justification has been provided by the applicant supporting the proposed variation as discussed within this report in the assessment against Section 9.3.2 of the DCP.

 

 

Section 2 - Controls that Apply to All Development 

 

2.1 Vehicle access and movements

C1 Access should be from an alternative secondary frontage or other non-arterial road where possible.

 

Comment: Access to the site for both units is from the laneway accessed from Broad Street which is a non-arterial road.

 

C2 A Traffic Impact Study may be required where adverse local traffic impacts may result from the development. The traffic impact study is to include the suitability of the proposal in terms of the design and location of the proposed access, and the likely nature, volume or frequency of traffic to be generated by the development.

 

Comment: The proposal will not generate significant additional traffic in the street when compared to the existing traffic. The existing road network is capable of carrying the potential traffic created by the development and ensuring an appropriate level of service and minimal increase in delays to traffic flow.

 

C3 Vehicles are to enter and leave in a forward direction unless it can be demonstrated that site conditions prevent it.

 

Comment: Access to the units is from the laneway which permits vehicles to turn (by using the combined area of the garages and laneway width) and enter and exit the laneway in a forward direction.

 

C5 Access driveways are to be located in accordance with the relevant Australian Standard at the time of lodgement of an application.

 

Comment: The driveway locations comply with the current standards.

 

C6 Ensure adequate sight lines for proposed driveways.

 

Comment: The proposed 1m setback from the laneway for the garages ensures sightlines are maintained for vehicle safety.

 

2.2 Off-street parking

C1 Parking is to be provided in accordance with the table below. For uses not listed, similar land uses should be used as a guide in assessing car parking requirements.

 

Comment: Table 1 requires that for multi-dwelling developments, 2 spaces per dwelling with 3 or more bedrooms. The proposal includes a double garage for each dwelling meeting the requirements of the DCP and providing a high level of amenity for the dwellings and the street.

 

C2 The design and layout of parking is to be in accordance with the relevant Australian Standard at the time of lodgement of an application.

 

Comment: The proposed garages provide the required space per vehicle and are consistent with the relevant standards for off-street parking.

 

2.3 Landscaping

C1 A landscape plan is required for applications for: Commercial and Industrial developments, Residential development (other than dwelling houses).

 

Comment: The site plan included some landscaping and showed species, no. of plants and pot size. The landscaping is consistent with Councils landscape guidelines and with the additional landscaped area required by conditions will shows consistency with the BASIX commitments proposed. The proposed landscaping is limited to the rear of the dwellings and does not add to the streetscape/laneway at all.

 

A revised landscape plan is required showing all existing landscaping and providing an area of landscaping at the front of each unit as this laneway is now a street frontage for the subject development and requires greater enhancement than a service laneway. It is also recommended that appropriate trees be planted within the landscaped areas of the proposed units to provide shade in summer but ensure solar access to the living areas in winter. 

 

C2 Natural features at the site, such as trees, rock outcrops, cliffs, ledges and indigenous species and vegetation communities are to be retained and incorporated into the design of the development.

 

Comment: There are trees at the front of the lot that are well established and add to the streetscape. They are not native trees but should be retained for the amenity, screening and shading they provide. The trees have not been shown on the plans. Removal of trees is not included in this approval. A revised landscape plan is required and must show the retention of the existing trees.

 

C3 Use native and indigenous plants, especially low water consumption plants in preference to exotic species. C4 Trees should be planted at the front and rear of properties to provide tree canopy. C5 Provide landscaping in the front and side setback areas, and on other parts of the site to improve the streetscape, soften the appearance of buildings and paved areas, and to provide visual screening. C6 Landscaping should provide shade in summer without reducing solar access in winter. Limited use of deciduous species is acceptable where used to achieve passive solar design.

 

Comment: The revised landscaping plan referenced above will identify and ensure compliance with these controls.

 

2.5 Safety and security

C1 Use good site planning to clearly define public, semi-public and private areas.

 

Comment: The private areas for each dwelling are defined.

 

C2 Entries are to be clearly visible and identifiable from the street, and are to give the resident/occupier a sense of personal address and shelter. For non-residential uses, administration offices or showroom are to be located at the front of the building.

 

Comment: The entries to the dwellings are easily identifiable and visible from the street.

 

C3 Minimise blank walls along street frontages.

 

Comment: The proposal uses change in plane, materials and use of architectural details to articulate the front facade.

 

C4 Avoid areas of potential concealment and ‘blind’ corners.

 

Comment: There are no areas of potential concealment and the entries to the dwellings are visible from the street.

 

C6 Planting and fencing is not to reduce the safety of users or compromise areas of natural surveillance.

 

Comment: There is no proposed landscaping at the front of the dwelling and therefore there is no hindrance to natural surveillance. There is also no fencing proposed forward of the building line.

 

2.6 Erosion and Sediment Control Principles

 

Comment: Sediment and Erosion controls were not identified on the plans. Although the site is flat and there is low risk of soil leaving the site, a condition has been imposed to ensure the required controls are put in place during the construction to minimise the risk of sediment entering the stormwater system.

 

Section 4 - Environmental Hazards and Management 

 

4.2 Flood Planning

 

Development within Central Business Area (Protected by levee)

C3 Development in the Central Wagga precinct (being the area protected by levees) is to comply with the provisions of Table 4.2.1.

 

Comment: Under the Wagga Wagga Floodplain Management Plan, the site is classified as low risk and protected by the levee. There are controls within Table 4.2.1 of the DCP for residential developments within Central Wagga Wagga. As the proposal is for residential (habitable) development the controls apply. The plans do not show that the dwellings meet the control. A condition will be imposed to ensure the units have a minimum floor height 225mm above ground level.

 

Section 5 - Natural Resource and Landscape Management

 

5.2 Preservation of trees

 

Comment: All existing trees on site will be retained. The trees are located at the front of the lot and a condition will require them to be shown on the revised landscape plan.

 

Section 9 - Residential Development  

 

9.2.1 Site layout

C1 Use site characteristics such as trees, changes in level or rock outcrops as features within the site layout.

 

Comment: The lot is flat and there are no visible rock outcrops. There are some established trees at the front of the lot which are proposed to be retained, however have not been identified on the plans.

 

C2 Integrate access, landscaping and services in the site layout, avoiding underutilised spaces.

 

Comment: The dwellings are provided with individual access driveways. Landscaping is integrated avoiding underutilised space and creating amenity and visual interest for each dwelling. A revised landscape plan is required and is to show the existing trees on the lot. It is also recommended that appropriate trees be planted within the landscaped areas of the proposed units to provide shade in summer but ensure solar access to the living areas in winter. 

 

C3 Orient living spaces to maximise solar access.

 

Comment: The main living areas of the dwellings have been orientated south, however, high sill windows to the living areas are also provided on the east facing wall and a small retreat room is provided on the northern façade to provide an additional part of the living area of the dwelling to achieve solar access. Both units comply with BASIX provisions for energy efficiency.

 

C4 Facilitate natural cross ventilation within dwellings through the location of windows and doors.

 

Comment: The dwelling layout and location of windows and doors will allow some cross ventilation through each dwelling.

 

9.2.2 Streetscape

C1 Provide a street address and front elevation that is consistent with the predominant scale, rhythm and form of the street.

 

Comment: The streetscape consists of a mix of old and new single dwellings and multi-dwelling developments, some are double storey with the majority of buildings being single storey. The proposal has a character that complements the streetscape because the materials proposed are simple but will present a quality finish to the street. This provides an appearance similar to other newer residential developments in the immediate area which have attached garages, pitched roofs, and habitable windows presented to the street.

 

C2 Front fence height forward of the building line is not to exceed 1200mm. However, a side boundary fence forward of the building line may be permitted to taper from the maximum permitted height (1.8 metres) at the building line down to the 1200mm maximum permitted height at the front boundary.

 

Comment: There are no front fences proposed.

 

C3 Fence height at and behind the building line is not to exceed 1800mm in height.

 

Comment: There are some modifications to the fencing of the courtyard area of the existing dwelling with this development. The fences are to the boundary fronting the laneway and will not exceed 1.8m in height are comply with this control.

 

C4 The majority of windows in dwelling wall which face the street should be windows of habitable rooms.

 

Comment: Both dwellings have windows of a habitable room facing the laneway.

 

9.3.1 Land area per dwelling

C1 The minimum development area is to be in accordance with Table 9.3.1a. C2 On larger sites the land area per dwelling may be distributed to provide a range of lot sizes, and to respond to site conditions and context.

 

Comment: The maximum land area per dwelling for multi-unit developments in an R3 zone is 350sq.m. As the site has an area of 885.20sqm the development complies with this control.

 

9.3.2 Site cover

Site cover is the proportion of a site that is occupied by buildings, garages and other structures. Site cover does not include basements, area under eaves, unenclosed decks, balconies, swimming pools, tennis courts or the like (refer to definition in the LEP).

Site cover controls significantly impact on built form and the pattern of open areas to buildings. In many areas of Wagga Wagga there is pressure to increase the size of buildings and eat into the “green spaces” that separate houses. These green spaces are also often the areas where mature trees are able to grow.

Managing site cover is important to ensure that houses have adequate space for usable garden areas, to avoid occupants feeling “overcrowded” and to maintain areas for natural runoff.

Landscaped area is unbuilt green space. Landscaped area does not include paved areas - it is the area used for growing plants, grasses and trees. The landscaped area controls apply in all areas to which this Part applies.

 

Objectives

O1 Ensure that development sites are of sufficient size for dual occupancy, multi dwelling housing and residential flat developments.

O2 Ensure adequate areas for access, parking, landscaping, useable garden and outdoor areas and natural runoff.

O3 Retain compatibility with site context and avoid over development resulting from excessive site cover.

 

C1 Maximum site cover is to be in accordance with Table 9.3.2a.

 

THE APPLICANT IS SEEKING A VARIATION TO THE ABOVE CONTROL BY GREATER THAN 10%

 

Comment: The table requires that for multi-dwelling development the maximum site coverage in the R3 zone is 40%. The site coverage proposed is 53.19%.

 

The applicant is seeking a variation of greater than 10% of the maximum permitted site cover. The applicant has provided reasonable justification and has shown the development is consistent with the objectives of the R1 General Residential Zone and Objectives of Section 9.3.2 as summarised below:

 

-     The proposed single storey units have been designed as single storey to be consistent with surrounding developments, both in scale and function, retaining compatibility with the site context.

-     Single storey residences allow privacy to be maintained.

-     A 50% site cover is permitted on the opposite side of the street (as shown in the map at the beginning of this report).

-     The proposed site cover is 53.19% and would be a variation of less than 10% if the site was located on the opposite side of the street and able to be determined under delegation.

-     The R3 zone has a maximum area per dwelling to maximise development on the lot. The development complies with these provisions ensuring that the development site is of sufficient size for the proposed development.

-     Adequate areas (as modified by conditions) are provided for access, parking and landscaping, useable garden and outdoor areas and natural runoff.

-     The 40% site cover is inappropriate for the R3 zoning to encourage higher density. It is unclear why only parts of Broad St were included in the higher site cover provisions.

 

The development complies with all other controls and where necessary impacts will be controlled via conditions. Considering this and the above justification it is recommended the application be supported because assessment has shown that the proposed site cover of 53.19% is appropriate for this development site because reasonable amenity is achieved for the subject lot and maintained for the adjoining lots and there are no likely adverse impacts from this development occurring.

 

9.3.4 Solar access

C1 Locate garages, laundries and bathrooms to provide insulation from western sun.

 

Comment: The garages for unit 1 and unit 2 are located on the north east corner of the dwellings and do not comply with this control. The layout of the dwellings provides rooms on the west façade including bathrooms and the like that will provide insulation of the living areas lessening impacts to the main areas of the dwelling from direct western sun. 

 

C2 Locate living areas and private open space to ensure orientation to the north and north east where possible.

 

Comment: The main living areas of the dwellings have been orientated south, however, high sill windows to the living areas are also provided on the east facing wall and a small retreat room is provided on the northern façade to provide an additional part of the living area of the dwelling and together they achieve the minimum required solar access. The private open space is orientated east which is acceptable as discussed below.

 

C3 For single dwellings, dual occupancies, secondary dwellings & shop top housing the windows to the main internal living area and at least half the private open space are to receive a minimum 3 hours direct sunlight between 9am and 3pm in mid-winter (June 22).

C4 At least 70 percent of dwellings within multi-dwelling housing and residential flat developments are to satisfy C3.

 

Comment: The main living areas of the dwellings have been orientated south, however, high sill windows to the living areas are also provided on the east facing wall and a small retreat room is provided on the northern façade to provide an additional part of the living area of the dwelling to achieve solar access. 3hrs of direct sunlight will be achieved to the combined living area (main living and retreat). Half of the private open space of both dwellings will receive 3 hours of sunlight due to the orientation of the dwellings and solar access opportunities from 9am to 12pm ensuring the orientation of the private open space is acceptable.

 

C5 For any adjacent dwellings that have north facing living areas, maintain 3 hours sunlight access to the windows of the living areas between 9am and 3pm in mid-winter (June 22). C6 Proposed development design should take into account the location of any adjacent private open space and avoid overshadowing of that space.

 

Comment: Sunlight access to the main living areas of the adjoining lots is maintained by the separation between the dwellings, proposed height of the buildings limiting overshadowing, location of the dwellings on the lot to the south and the location of the living areas within the dwelling to the west (DA69/87). There are no impacts to the solar access of the private open space to the west when comparing the existing impacts of the 1.8m fence (which has longer shadows than the proposed dwelling between 10am and 12pm). The extent of private open space to the dwelling to the south ensures a reasonable amount of solar access is maintained.

 

9.3.5 Private open space

C1 At least 24m2 of private open space is required per dwelling. The private open space is to be directly accessible to the main living area and have a minimum dimension of 4m.

 

Comment: All dwellings have private open space areas that are greater in size than the minimum 4m by 6m area. The main living areas directly access the private open space.

 

C2 Enclosure of approved private open space will be permitted, however at least one side of the approved private open space is to remain open. Roofing of approved private open space is permitted provided that BASIX requirements are not compromised.

 

Comment: The private open space is not enclosed but is partly roofed with the inclusion of an alfresco area for each dwelling. Both unit’s alfresco areas have two sides open. The BASIX energy efficiency standards are met as the roofed areas have been considered in the BASIX report.

 

C3 Use screening where necessary to ensure the privacy of private open space areas.

 

Comment: The private open space areas will be screened from view from the public road and adjoining lots by the boundary fences and location at the rear of the lot.

 

9.3.6 Front setbacks

O1 Encourage uniform building lines that correspond to the built setbacks and patterns of neighbouring buildings.

O2 Encourage attractive residential streets and quality public domain.

O3 Ensure that new developments complement the established built patterns.

O4 Maintain lines of sight for vehicle safety.

 

C1 Minimum front setbacks for residential development (site area smaller than 2000m2): Primary street frontage (other roads) 6m

 

Comment: The dwellings are located to the rear of the existing dwelling and comply with this control. The impact of the dwellings having their main frontage accessed from the laneway with a 1m setback however needs to be considered for the visual quality created within the laneway and whether or not this is suitable for dwellings when the 1m setback is usually reserved for garages. The noise and light impacts on the dwellings from vehicles in the laneway needs to be considered. The dwellings do not contain any bedrooms and only a minor living area within the front facades limiting impacts that vehicles moving along the laneway might create for occupants. The visual amenity for the residents must also be considered and the impacts the minimal setback proposed will have. Landscaping will play an important role in providing quality visual amenity as well as softening and reducing heat impacts. A revised plan is required to show landscaped areas provided at the front of both dwellings.

 

C4 The front elevation of a dwelling as visible from a public road shall include at least one change in plane of the dwelling wall (that encloses a habitable room) of a minimum of 500mm. The front of the garage shall not protrude in front of the face of the forward most wall of the dwelling enclosing a habitable room. In all instances, the garage shall not encroach on the front setback identified under C1.The forward most part of a building/dwelling wall shall not project forward of the building line.

 

Comment: The dwellings comply as the elevations fronting the laneway include more than one change in plane enclosing habitable rooms. The change in plane is greater than the minimum of 500mm. The garages are behind the face of the forward most walls presented to the laneway enclosing habitable rooms. The garages do not encroach any of the required setbacks.

 

9.3.7 Side and rear setbacks

C1 The rear setback for detached secondary dwellings is determined by site conditions and the setbacks of similar structures on adjoining and nearby sites.

                                       

Comment: The side and rear setbacks are consistent with the setbacks to the side boundary setbacks on surrounding multi-dwelling lots and are consistent with the desired medium density character and provide the expected separation from the neighbouring dwellings. Adequate space is provided for access, servicing, natural light and ventilation.

 

9.4.1 Building elements

C1 Use verandahs or pergolas to link internal and external living areas.

 

Comment: The private open space areas are joined to the main living areas by roofed alfresco areas at the rear of each dwelling.

 

C2 Porches are to be integrated into the building design, and are to be used to create a sheltered and clearly visible entry.

 

Comment: The entries are clearly visible from the street as the front doors face the laneway and can be viewed from Broad Street and front porches have been integrated into the design of the dwellings to highlight the entry.

 

C3 Locate ancillary components such as aerials, satellite dishes, air conditioning units and the like so they are not visible from the street.

 

Comment: The ancillary components (clotheslines) are shown on the plans, they will not be visible from the street.

 

9.4.2 Materials and finishes

C1 Select materials for their environmental performance, durability, detail and appearance to achieve quality appearance.

 

Comment: The materials chosen are typical of dwelling developments and will provide a quality appearance. The main materials proposed are pre-coloured metal roof sheeting and brick veneer walls.

 

C2 Avoid large unbroken expanses of any single material.

 

Comment: There are no large expanses of material. The facades are articulated through the use of change in plane and incorporation of windows/doors.

 

C3 Minimise use of highly reflective or glossy materials on building exteriors.

 

Comment: Pre-coloured corrugated metal sheeting has been specified as the roofing material. Brick veneer has been specified as the materials for the walls. These materials are not highly reflective or glossy.

 

9.4.3 Privacy

C1 Offset windows, balconies and private open space areas between adjoining dwellings. C3 Screening is required where there is direct line of sight between neighbouring balconies or private open space areas, or between windows and door openings of habitable rooms.

 

Comment: The dividing fences provide the required privacy and separation between the dwellings. There are no habitable windows with direct line of site and reasonable spatial separation is provided.

 

9.4.4 Garages and driveways

C1 Where garage doors form part of the facade of a dwelling fronting a public road

- the garage door is to be:

less than 50% of the width of the house*

no wider than 6m #

maximum 2.4m high #

- double garages are only permitted on lots 12.5m wide or greater*

- single fronted tandem garages with one space behind the other are permitted

 

Comment: Although the garages front on to the laneway they do not form part of the facade that fronts onto Broad Street, therefore this control is not relevant to this development. The garage door for each unit, however, is only 500mm wider than 50% of the front of the dwelling. The doors are not wider than 6m and no more than 2.4m in height and generally comply with the provisions and objectives for this section of the DCP.

 

9.4.5 Site facilities

C1 For dual occupancy developments, multi-dwelling housing and residential flat developments, utility services are to be provided underground.

 

Comment: The utilities will be provided below ground.

 

C3 Locate mail boxes so that they are clearly visible from the street or main entry. The plans are to include details of the location for letter boxes and any associated shelter structure.

 

Comment: The mailbox for the units is located adjacent to the driveway at the front boundary. A shelter structure is not required. The mail boxes have a pathway connecting the units to the mail box to providing a safe access along the laneway.

 

C4 Garbage areas are to be easily accessible within the site, and are to have adequate lighting. The area should be visually screened from adjoining developments and public spaces.

 

Comment: An appropriate area for bin storage is provided within the garages or behind fences and will be screened from view.

 

C5 Provide an external drying area in an area that receives reasonable solar access. The drying area is to be screened from the street or adjoining public spaces.

 

Comment: Both units have an external drying area shown within the rear yards and will receive reasonable solar access. Fences will screen the clothes lines from view.

 

9.4.6 Changing the landform - cut and fill

 

Comment: This section is not relevant to this development. There are no changes to the landform proposed with this development.

 

Section 79C(1)(a)(iiia) - Planning Agreements

 

There are no planning agreements relevant to this development application.

 

Section 79C(1)(a)(iv) - any matters prescribed by the regulations

 

Matters prescribed by the regulations have been considered in this assessment. Prescribed conditions have been imposed, including compliance with the BCA, adequacy/shoring of adjoining properties and fulfilment of BASIX commitments.

 

Section 79C(1)(b) - likely impacts of the development

 

Section 733 of the Local Government Act 1993

Section 733 provides that Councils will not incur liability for decisions or omissions concerning flood liable land or land subject to the risk of bushfire have been considered. A risk assessment has been completed and Council will be able to demonstrate that it has acted appropriately in its decision making when defending claims in liability or in circumstances where administrative decisions are challenged.

 

Flooding Risk Assessment

Comment: The land is Flood Prone Land. The risks associated with the development have been considered in this assessment and the development complies with the relevant flood provisions of the LEP and DCP.  

 

Bush Fire Risk Assessment

Comment: The land is not Bushfire Prone Land.  

 

 

Likely impacts of this development

 

S= Satisfactory   N/S = Not Satisfactory   N/R = Not Relevant

 

 

Comment

Context & Setting & Streetscape

S

There are no adverse impacts to the locality or streetscape as the development is consistent with residential accommodation development in the locality. The development is consistent in architectural character and the development presents visually interesting facades addressing each street. The condition requiring landscaping to the frontage of the units will enhance the setting and have positive impacts.

Traffic, access and parking

S

There are no likely adverse access impacts as the traffic volumes are not significant within the locality and the development is consistent with relevant standards.

Public Domain

S

Conditions will be imposed limiting access, and storage of materials and vehicles within the laneway.

Heritage

N/A

The site is not heritage.

Utilities

S

There are no easements on the site. Conditions will be imposed to ensure plumbing and drainage and Riverina Water standards are met.

Water Quality & Stormwater

S

The development will be serviced and drain to Council infrastructure, there are no likely adverse impacts.

Soils, soil erosion

S

Plans identify sediment and erosion controls during construction. The site will be landscaped minimising the likelihood of erosion when the development is occupied.

Flora and Fauna Trees

S

The trees located at the front of the lot away from the site of the works are to be retained. The site where the works are to occur has minimal grass and there are no impacts to flora of fauna.

Waste

S

Plans show control of waste generated by construction. The site will be serviced by Councils waste collection services during occupation.

Energy

S

Current compliant BASIX certificates have been supplied and commitments listed on the plans. The development is not likely to have any adverse energy impacts.

Noise & vibration

S

Construction noise will be controlled by limiting hours of construction.

Natural hazards  - Flooding  - Bushfire Prone Area Map

S

The site is flood prone land and conditions have been imposed to avoid adverse impacts. The site is not bushfire prone land.

Safety, security and crime prevention

S

The development will provide opportunities for natural surveillance and the entries to the units are visible from the public domain. There are no likely adverse safety, security and crime prevention impacts.

Social impact in locality

S

The development provides housing opportunities providing positive social outcomes and there are no likely adverse social impacts.

Economic Impact in Locality

S

The architectural character of the units is consistent with the locality. There are no likely adverse economic impacts in the locality. Development within the R3 zone typically has a positive economic outcome on the amenity of an area. Contributions will be put toward services and infrastructure.

Site design and internal design

S

The development does not create unusable areas and makes best use of the orientation of the lot.

Overlooking - overshadowing

S

There are no likely adverse overlooking and overshadowing impacts. The development is reasonable for a residential area.

Landscaping

S

The development includes landscaping (as required by conditions) that will enhance the streetscape and will not obstruct sightlines. There are no likely adverse impacts.

Construction

N/S

Conditions have been imposed to minimise the potential for adverse impacts from the construction of the dwellings.

Private open space

S

There are no likely adverse impacts from the proposed location of the private open space as minimum requirements have been achieved. The areas have been offset from each other and reasonable amenity provided.

Setbacks, Building Envelopes

S

The dwellings have been designed and located to minimise adverse impacts on the adjoining dwellings. The proposed setbacks are consistent with residential development. There are no likely adverse impacts.

 

 

Section 79C(c) - the suitability of the site for the development

 

The subject land located at Lot 1 DP 534496, 16B Broad Street Wagga Wagga, is considered to be suitable for the proposed development because it is proposed on an existing lot that has been developed for the purpose of residential accommodation. The development is consistent with relevant standards and the architectural character of other dwellings in the locality. There are no likely adverse impacts from this development occurring.

 

 

Section 79C(d) - any submissions made in accordance with the Act or the regulation

Referrals - Internal and RWCC referral comments only.

Notification - The application was notified in accordance with the DCP. One submission was received during the notification period. The details of the submission were included earlier in the report under the DCP section 1.10.

Advertising - N/A

Public Submissions and those from public authorities - RWCC comments received. Nil submissions have been received at the time of this report.

 

Section 79C(e) - the public interest

 

The public interest is a broad consideration relating to many issues and is not limited to amenity for the subject lot. Taking into account the full range of matters for consideration under Section 79C of the Environmental Planning and Assessment 1979 (as discussed within this report) it is considered that approval of the application is the public interest.

 

DEVELOPMENT CONTRIBUTIONS

 

Section 94 of the Local Government Act 1993 and the City of Wagga Wagga’s Section 94 Levy Contributions Plan 2006 enable Council to levy contributions, where anticipated development will or is likely to increase the demand for public facilities. A Section 94 contribution of $11,864.54 applies and will be put towards the provision high quality and diverse public facilities to meet the expectations of the residents of the city.

 

The Section 94 contributions are calculated as follows using the medium density table:

Existing impact: No credit as nil contributions were paid with the original subdivision.

Proposed impact: 2 additional dwellings at $5137 per dwelling

BASE RATE: Proposed - Existing = $10274 - 0 = $10274

UDATED BY CPI: 10274 x 110.4/95.6 = $11,864.54

 

Central Wagga Section 94 Dual Occupancy, Medium Density & Other - Without Land Dedication

Contributions Plan Preparation & Management

$517.81

Future Civic, Community & Cultural

$515.75

Recoupment Civic, Community & Cultural

$2,515.08

Future Roads & Traffic Management

$3,684.26

Recoupment Open Space & Recreation

$1,161.99

Future Open Space & Recreation

$1,879.11

Base Charge

$10,274.00

Final Amount Including CPI 110.4/95.6 (20/12/16)

$11,864.54

 

Section 64 of the Local Government Act 1993, Section 306 of the Water Management Act 2000 as well as the City of Wagga Wagga’s Development Servicing Plan for Stormwater 2007 / Development Servicing Plan for Sewerage 2006 enable Council to levy developer charges based on increased demands that new development may have on sewer and/or stormwater infrastructure. A Section 64 contribution of $13390.00 is payable for this development as a source of funding towards sewerage and/or stormwater infrastructure within the urban area.

Section 64 contributions have never been paid for this lot and there is nil credits applicable.

 

Sewer: Developer Charge for 3 or more bedroom dwellings: 1ET (3538)

Existing impact: Nil

Proposed impact: 2 x 3 bedroom dwellings at 1ET (3538)

BASE RATE: Proposed - Existing = 7076 - 0 = $7076

UDATED BY CPI: 7076 x 108.9/100.5 = $7667.43

 

Stormwater: Developer Charge is $3007

Existing impact: Nil

Proposed impact: net area of development lot (m2): 885.20/800 x 0.83/0.74 x 3007

BASE RATE: Proposed - Existing = 3731.91 - Nil = $3731.91

UDATED BY CPI: 3731.91 x 108.9/87.9 = $4623.49

 

REFERRALS

 

Building Surveyor: - Comments have been received and conditions imposed.

Plumbing Inspector: - Comments have been received and conditions imposed.

Subdivision Engineer: - Comments have been received and conditions imposed.

Environmental Officer: - Referral was not required.

Health Officer: - Referral was not required.

Parks Officer: - Referral was not required.

Riverina Water County Council: - Comments have been received and conditions imposed.

 

OTHER APPROVALS

 

Nil.

 

CONCLUSION

 

This assessment has given consideration to the matters listed where relevant. This assessment was undertaken in accordance with section 79C of the Environmental Planning and Assessment Act 1979.

 

This particular development is recommended for approval because it has merit and is an acceptable development for the lot as discussed within this report.

 

The total area of development on the lot is acceptable and should be supported because reasonable amenity is maintained for the surrounding lots and the occupant, there are minimal impacts of the development on the locality and the close proximity to the CBD and being a site that directly adjoins the area mapped above.

 

The dwellings are acceptable in their location, located to the rear of the existing dwelling on the lot, and are typical of multi-dwelling development.

 

 

 

 

 

 

RECOMMENDATION

 

It is recommended that DA16/0585 for Multi Dwelling Housing – 2 x 3 bed dwellings (existing dwelling retained) be approved, subject to the following conditions:-

 

CONDITIONS

 

Approved Plans and Documentation

 

1.   The development must be carried out in accordance with the approved plans and specifications as follows.

 

Plan/DocNo.

Plan/Doc Title

Prepared by

Issue

Date

BD15001

Statement of Environmental Effects

Sewell Design

-

7/9/16

15001  1 of 3

Site Plan

Sewell Design

3

3/9/16

15001  2 of 3

Floor Plan & BASIX Commitments

Sewell Design

3

3/9/16

15001  3 of 3

Elevations Plan & Sections Plan

Sewell Design

3

3/9/16

760357S

BASIX Certificate  Unit 1

Sewell Design

-

13/9/16

760365S

BASIX Certificate  Unit 2

Sewell Design

-

13/9/16

-

Letter  (ADDITIONAL INFO)

Sewell Design

-

28/10/16

The Development Application has been determined by the granting of consent subject to and as amended by the conditions of development consent specified below.

NOTE:           Any modifications to the proposal shall be the subject of an application under Section 96 of the Environmental Planning and Assessment Act, 1979.

REASON:  It is in the public interest that work is carried out in accordance with the approved plans. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

Prior to release of Construction Certificate

 

2.   Prior to the issue of a Construction Certificate details of all structural concrete and structural steelwork shall be submitted to the Principal Certifying Authority for approval, all such details shall be certified by a practising Structural Engineer.

REASON:  It is in the public interest that all building elements are able to withstand the combination of loads and other actions to which it may be subjected.  Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

3.   Prior to the release of Construction Certificate a geo-technical report must be submitted to the Principal Certifying Authority that demonstrates that the foundation upon which a footing/slab is to be located is classified in accordance with Part 3.2.4 "Site Classification", of the Building Code of Australia and AS 2870 Residential Slabs and Footings.

This report must be carried out by an experienced geo-technical engineering consultant, with associated testing being conducted by a NATA registered laboratory.  The report shall identify the type of "site classification" that exists on the subject site.  Any footing/slab design is to be designed having regards to the identified site classification.

REASON:  It is in the public interest that all building elements are designed to be able to withstand the combination of loads and other actions to which they may be subjected. Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

4.   Pursuant to s94 of the Environmental Planning and Assessment Act 1979 and the City of Wagga Wagga Section 94 Contributions Plan 2006-2019 the following monetary contributions must be paid to Council, prior to the issuing of the Construction Certificate.

 

Contributions Plan preparation & management

$517.81

Civic, Community & Cultural - Future,

$515.75

Civic, Community & Cultural - Recoupment,

$2,515.08

Roads and Traffic Management - Future,

$3,684.26

Open Space and Recreation - Recoupment,

$1,161.99

Open Space and Recreation - Future (without land and dedication),

$1,879.11

BASE FIGURE

$10,274.00

TOTAL PAYMENT (updated by CPI)

$11,864.54

The amounts payable under this condition will be indexed in accordance with Clause 2.12 of the City of Wagga Wagga Section 94 Contributions Plan 2006-2019 from the endorsed date of this Development Consent until the date of payment. A copy of the City of Wagga Wagga Section 94 Contributions Plan 2006-2019, is available for inspection at Council Chambers, corner Baylis and Morrow Streets, Wagga Wagga.

NOTE 1:        Clause 2.12 of the City of Wagga Wagga Section 94 Contributions Plan 2006-2019 provides for Section 94 contributions to be indexed in accordance with the Consumer Price Index - All Groups (Sydney) published by the Australian Bureau of Statistics.

NOTE 2:        The figures outlined in this consent are based on the current rate of CPI. Please be advised that CPI changes on a regular basis and you are advised to contact Council prior to payments being made, to ensure no further CPI increases/decreases have occurred since the date of this consent.

REASON: Having considered the development in accordance with Section 94 of the Environmental Planning and Assessment Act 1979 and the City of Wagga Wagga Section 94 Contributions Plan 2006-2019, as amended, Council is satisfied that the development will require the provision of, or increase the demand for, public amenities and public services within the area.

 

5.   Prior to the release of Construction Certificate a compliance certificate under s306 of the Water Management Act 2000 must be obtained in respect of the development relating to water management works that may be required in connection with the development.

NOTE1:         ‘Water management work’ is defined in s283 of the Water Management Act to mean a ‘water supply work‘, ‘drainage work‘, ‘sewage work’ or ‘flood work’. These terms are defined in that Act.

NOTE 2:        Riverina Water is responsible for issuing compliance certificates and imposing requirements relating to water supply works for development in the Council‘s area - please contact Riverina Water to ascertain compliance certificate water supply related requirements. A copy of such a compliance certificate is required prior to release of Construction Certificate.

NOTE 3:        The Council is responsible for issuing compliance certificates and imposing requirements relating to sewerage, drainage and flood works for development in its area.

NOTE 4:        Under s306 of the Water Management Act 2000, Riverina Water or the Council, as the case requires, may, as a precondition to the issuing of a compliance certificate, impose a requirement that a payment is made or works are carried out, or both, towards the provision of water supply, sewerage, drainage or flood works.

NOTE 5:        The Section 64 Sewer base figure is $7076.00

The Section 64 Sewer contribution (updated by the CPI) required to be paid is $7667.43

NOTE 6:        The Section 64 Stormwater base figure is $3731.91

The Section 64 Stormwater contribution (updated by the CPI) required to be paid is $4623.49

NOTE 7:        Section 64 contributions shall be indexed in accordance with CPI annually at the commencement of the financial year.

NOTE 8:        The figures outlined in this consent are based on the current rate of CPI. Please be advised that CPI changes on a regular basis and you are advised to contact Council prior to payments being made, to ensure no further CPI increases/decreases have occurred since the date of this consent.

REASON: It is in the public interest that Council maintain the ability to provide adequate water and sewer reticulation services. Section 79C(1)(c) and (e) of the Environmental Planning and Assessment Act 1979, as amended).

 

6.   Prior to the issue of the Construction Certificate a revised site plan shall be submitted to the Principal Certifying Authority for approval that indicates;

i)          The stormwater system connecting to Broad Street Kerb & Gutter.

ii)         Point of connection for sewer for proposed units 1&2.

iii)        The finished paving levels demonstrating that the stormwater overland flow path is directed towards the street or an alternative appropriate point of discharge.

iv)        A stormwater plan indicating pipe and pit levels, inverts and sizes. This plan shall also show existing and proposed surface contours within the site and along its boundaries with immediately adjacent properties, and shall define overland flow paths for storms which exceed a 1 in 10 year event.

REASON:  It is in the public interest that plumbing and drainage work is carried out in accordance with AS/NZS 3500 and the relevant provisions of the New South Wales Code of Plumbing Practice, Plumbing and Drainage.  Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

7.   Prior to the issue of a Construction Certificate provide details on the proposed method of construction of the garage wall required to achieve FRL 60/60/601 to units 1 and 2.

REASON:  It is in the public interest that all building elements are able to withstand the combination of loads and other actions to which it may be subjected.  Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

8.   A revised landscape plan and legend shall be submitted and approved prior to the release of the Construction Certificate.

(1)   Landscaping must be provided at the front of each of the proposed units, in between the unit and the laneway. The landscaping for each unit shall include tree/s which can be deciduous to provide shade in summer and solar access in winter.

(2)   The existing trees located at the front of the lot shall be retained and shall be shown on the landscape plan. The landscaping to the front dwelling shall also be embellished to improve the streetscape along Broad Street.

(3)   The Landscape plan shall be in accordance with Council’s Landscape Guidelines and Landscape Application Checklist.

(4)   A Plant Schedule indicating all plant species, pot sizes, spacings and numbers to be planted within the development shall be submitted with the Landscape Plan. Plant species are to be identified by full botanical name. All plants proposed in the landscape plan are to be detailed in the plant schedule.

REASON: To ensure that landscaping will be provided on the subject land. Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

9.   No works are to take place to any services without prior written approval from the relevant authority.

NOTE:           Underground assets may exist in the area that is subject to your application. In the interests of health and safety and in order to protect damage to third party assets please contact Dial before you dig at www.1100.com.au or telephone on 1100 before excavating or erecting structures.

REASON: To ensure that the servicing requirements of public utility authorities have been met, to service the development. Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

Prior to Commencement of Works

 

10. Prior to works commencing on site, toilet facilities must be provided, at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out, at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be:

a)         a standard flushing toilet connected to a public sewer, or

b)        if that is not practicable, an accredited sewage management facility approved by Council, or

c)         if that is not practicable, any other sewage management facility approved by Council.

NOTE 1:        The provision of toilet facilities in accordance with this condition must be completed before any other work is commenced and the toilet facility must not be removed without the prior written approval of Council.

NOTE 2:        “Vicinity” in this condition is defined to mean within 50 metres of the subject building site.

NOTE 3:        The toilet facilities are to comply with all WORK COVER NSW requirements.

REASON:  To provide adequate sanitary facilities during the construction phase.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

11. A CONSTRUCTION CERTIFICATE pursuant to Section 109C of the Environmental Planning and Assessment Act 1979, as amended from either Council or an accredited certifying authority certifying that the proposed works are in accordance with the Building Code of Australia PRIOR to any works commencing.

NOTE 1:        No building, engineering, excavation work or food premises fitout must be carried out in relation to this development until the necessary Construction Certificate has been obtained.

NOTE 2:        YOU MUST NOT COMMENCE WORK UNTIL YOU HAVE RECEIVED THE CONSTRUCTION CERTIFICATE, even if you made an application for a Construction Certificate at the same time as you lodged this Development Application.

NOTE 3:        It is the responsibility of the applicant to ensure that the development complies with the provision of the Building Code of Australia in the case of building work and the applicable Council Engineering Standards in the case of subdivision works. This may entail alterations to the proposal so that it complies with these standards.

REASON:  To ensure the design of the proposed work may be assessed in detail before construction commences and because it is in the public interest that the development complies with the appropriate construction standards. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

12. Prior to works commencing a container must be erected on site for the enclosure of all building rubbish and debris, including that which can be wind blown. The enclosure shall be approved by Council and be retained on site at all times prior to the disposal of rubbish at a licenced Waste Management Centre.

Materials and sheds or machinery to be used in association with the construction of the building must not be stored or stacked on Council’s footpath, nature strip, reserve or roadway.

NOTE 1:        No building rubbish or debris must be placed, or be permitted to be placed on any adjoining public reserve, footway, road or private land.

NOTE 2:        Weighbridge certificates, receipts or dockets that clearly identify where waste has been deposited must be retained. Documentation must include quantities and nature of the waste.  This documentation must be provided to Council prior to application for an Occupation Certificate for the development.

NOTE 3:        The suitable container for the storage of rubbish must be retained on site until an Occupation Certificate is issued for the development.

REASON:  To ensure that the building site and adjoining public places are maintained in a clean and tidy condition so as not to interfere with the amenity of the area. Section 79C (1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

13. Prior to the commencement of works erosion and sediment control measures are to be established and maintained to prevent silt and sediment escaping the site or producing erosion.  This work must be carried out and maintained in accordance with Council’s:-

a)         Development Control Plan 2010 (Section 2.6 and Appendix 2)

b)        Erosion and Sediment Control Guidelines for Building Sites; and

c)         Soils and Construction Volume 1, Managing Urban Stormwater

Prior to commencement of works, a plan illustrating these measures shall be submitted to, and approved by, Council.

NOTE:           All erosion and sediment control measures must be in place prior to earthworks commencing. 

REASON:  To ensure the impact of the work on the environment in terms of soil erosion and sedimentation is minimised. Section 79C (1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

14. Any upgrades or alterations to existing Council infrastructure required as a result of the development shall be at the full cost of the applicant. Contact Council’s Development Engineer to confirm what approval is required prior to commencing work on any Council infrastructure. Such work includes (but is not limited to) upgrade or connection to sewer or stormwater mains, and alteration of stormwater pits and sewer manhole levels.

 

REASON: It is in the public interest that all costs associated with upgrading Public Infrastructure as a result of the development are borne by the applicant. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

 

15. The existing tree/s to be retained situated within the property of the proposed development shall be protected from all construction works.

All care must be taken to protect existing trees to be retained from damage, including street trees and trees located adjacent to the proposed development. The developer shall identify all trees to be retained prior to commencement of construction works.

A Tree Protection Zone (TPZ) shall be constructed for all existing trees to be retained within the development in accordance with Australian Standards - AS 4970-2009 Protection of Trees on Development Sites.

Construction of Tree Protection Zone’s, shall be completed and inspected by Council’s Supervisor of Tree Planning and Management, prior to the commencement of any site works. Contact can be made by phoning 1300 292442 during normal business hours.

Removal, relocation or disruption of the Tree Protection Zone fencing will be considered as a breach of this consent. TPZ fences shall remain in place until the end of construction.

If damage of any sort should occur to any protected trees / vegetation within the development, contact shall be made with Council’s Supervisor of Tree Planning and Management to determine what remedial action should be taken. Throughout the construction period regular inspections of protected trees shall be carried out to ensure trees retained are of good health and vigour.

REASON:  Because it is in the public interest that the subject trees are protected. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

16. Prior to the commencement of works, an application is required to be lodged for both an Activity Approval under Section 68, Part B - 4, 5 and 6, of the Local Government Act 1993 for any public infrastructure sewer / stormwater works and a Construction Certificate for all other subdivision works. These two applications should be lodged concurrently.

NOTE 1:        Works carried out under an approved Section 68 prior to a Development Consent and/or Construction Certificate being issued are subject to change and are at the applicant's risk.

NOTE 2:        Prior to the commencement of works a works bond may be required to be lodged with Council for public infrastructure works. Refer to Council’s Section 68 Activity Approval Application Guide for detail.

REASON: To ensure that the activity is carried out with the relevant approvals required under the Local Government Act 1993.

 

17. A Section 68 Approval must be obtained from Council prior to any sewer or stormwater work being carried out on the site.

The licensed plumber must submit to Council, at least two (2) days prior to the commencement of any plumbing and drainage works on site a “Notice of Works”.

NOTE:           A copy of the Notice of Works form can be found on Council’s website.

REASON: It is in the public interest that plumbing and drainage work is carried out with the relevant approvals required under the Local Government Act 1993 and the Plumbing Code of Australia. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

18. Building work (within the meaning of the Home Building Act 1989) must not be carried out unless the Principal Certifying Authority for the development:

a)         in the case of work done by a licensee under the Act:

i)          has been informed in writing of the licensee’s name and contractor license number, and

ii)         is satisfied that the licensee has complied with the requirements of Part 6 of that Act, OR

b)        in the case of work to be done by any other person:

i)          has been informed in writing of the person’s name and owner-builder permit number, or

ii)         has been given a declaration, signed by the owner of the land, that states that the reasonable market cost of the labour and materials involved in the work is less than the amount prescribed for the purposes of the definition of owner-builder work in Section 29 of the Act,

and, is given appropriate information and declarations under paragraphs a) and b) whenever arrangements for the doing of the work are changed in such a manner as to render out of date any information or declaration previously given under either a) or b).

NOTE:           A certificate issued by an approved insurer under Part 6 of the Home Building Act 1989 that states that the person is the holder of an insurance policy is sufficient evidence to satisfy this condition.

REASON:  To ensure the development complies with the requirements of Clause 98 of the Environmental Planning and Assessment Regulations 2000, and Section 80A(11) of the Environmental Planning and Assessment Act 1979, as amended.

 

19. Prior to works commencing, a sign must be erected in a prominent position on any work site on which work involved in the erection or demolition of a building is being carried out:

a)         stating that unauthorised entry to the site is prohibited, and

b)        showing the name of the person in charge of the work site and a telephone number at which that person may be contacted outside work hours

c)         the development consent or complying development consent number, the name and contact details of the Principal Certifying Authority.

Any sign must be removed when the work has been completed.

NOTE:           This condition does not apply to:

a)   building work carried out inside an existing building, or

b)  building work carried out on premises that must be occupied continuously (both during and outside work hours) while the work is being carried out.

REASON:  To ensure the development complies with the requirements imposed under Clause 98 of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A(11) of the Environmental Planning and Assessment Act 1979, as amended.

 

20. At least two (2) days prior to the commencement of any works, the attached ‘Notice of Commencement of Building or Subdivision Works and Appointment of Principal Certifying Authority’, must be submitted to Council.

REASON:  Because it is in the public interest that Council receive notification in accordance with the provision of the Environmental Planning and Assessment Act 1979, as amended. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 


During works

 

21. If the Council is appointed as the Principal Certifying Authority the following inspections must be undertaken by Council and a satisfactory Inspection Report must be issued by Council for such works prior to any further works being undertaken in respect of the subject development.  Inspection Stages for construction are listed in Column 1 and must be inspected by Council at the times specified in Column 2.

COLUMN 1

COLUMN 2

Footings

When the footings have been excavated and all steel reinforcement has been placed in position.

Slab

When reinforcement steel has been placed in position in any concrete slab, whether or not the slab is suspended, on the ground, or on fill.

Wall frame

When the frame has been erected and prior to sheeting and or brick veneer outer wall has been constructed and tied to the frame.

Roof frame

When external roof covering has been installed and prior to the installation of the ceiling lining and eaves soffit lining.

Wet areas

When waterproofing has been applied to all wet areas, prior to tiling or finishing of surface.

Drainage

When the stormwater and roof water drainage system has been completed.

Final

Required prior to occupation of the building

NOTE 1:        A Final Occupation Certificate in relation to the building cannot be issued by Council until all Inspection Reports required by this condition have been issued by Council. Prior to or at the time of the application for Occupation Certificate the application for “Occupation Certificate” form attached to the Council issued Construction Certificate must be completed and submitted to Council with all required attachments - failure to submit the completed Occupation Certificate application form will result in an inability for Council to book and subsequently undertake occupation certificate inspection.

NOTE 2:        The above Inspection Reports are required whether or not the work has been inspected by a Structural Engineer, a lending authority or any other person. If the Inspection Reports are not issued Council may refuse to issue a Building Certificate under Section 149A of the Environmental Planning and Assessment Act 1979, as amended.

NOTE 3:        Submission of the bracing plan and the Truss and Frame Certificate is required seven (7) working days before the frame inspection.

REASON:  It is in the public interest that critical stage inspections be issued for these components of the development in accordance with Section 162A of the Environmental Planning and Assessment Regulations 2000 as amended.

 

22. The Builder must at all times maintain, on the job, a legible copy of the plan and specification approved with the Construction Certificate.

REASON:  It is in the public interest that a copy of the Construction Certificate plans are available, and Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

23. The concrete slab floor shall be treated against termites in accordance with AS 3660-1 2000 Termite Management:

a)         NON CHEMICAL - where a non chemical treatment (physical barriers) is to be used the applicant shall submit details to Council prior to any work commencing.

b)        CHEMICAL RETICULATION - where a chemical method of treatment is to be used by way of reticulation, details shall be provided to Council for approval prior to installation accompanied by a signed maintenance contract with a Pest Control Operator.

Applicants and owners are to ensure that an annual inspection is undertaken to determine need for treatment.

c)         CHEMICAL TREATMENT - where a chemical method of treatment is to be used by way of hand spray treatment before laying the slab, details shall be provided to the Council for approval prior to installation.

Warning - Applicants and owners are warned that the expected life of the under floor barrier (Chemical Treatment) is only ten (10) years and the external barrier (Chemical Treatment) is only five (5) years. The actual protection will depend on factors such as termite hazards, climate and soil conditions.

Council recommends in all cases of chemical treatment including reticulation that regular annual inspection be carried out by a licensed Pest Control Operator to determine the need for re-treatment.

d)        Upon installation of the method of treatment, a Certificate shall be issued to Council by the licensed installer of the system certifying that the system installed is in accordance with AS 3660-1 and in accordance with any specific requirements of the Council.

e)         A durable notice must be permanently fixed to the building in the electricity meter box indicating:

i)          The method of protection

ii)         The date of installation of the system

iii)        Where a chemical barrier is used, its life expectancy as listed on the National Registration Authority label.

iv)        The need to maintain and inspect the system on a regular basis.

REASON:  It is in the public interest that where appropriate termite management treatments are used in compliance with AS 3660.1.2000 Termite Management New Building Work. Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

24. The permitted construction hours are Monday to Friday 7.00am to 6.00pm and Saturday 7.00am to 5.00pm, excepting public holidays. All reasonable steps must be taken to minimise dust generation during the demolition and/or construction process. Demolition and construction noise is to be managed in accordance with the Office of Environment and Heritage Guidelines.

REASON:  To ensure building works do not have adverse effects on the amenity of the area.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

25. All earthworks, filling, building, driveways or other works, must be designed and constructed (including stormwater drainage if necessary) so that at no time, will any ponding of stormwater occur on adjoining land as a result of this development.

REASON:  To prevent the proposed development having a detrimental effect on the developments existing on the adjoining lands.  Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

26. Stormwater drainage must be constructed and maintained so as to provide a 1 in 10 year pipe system, satisfactory overland flow path and not adversely affect adjacent properties.

REASON:  To prevent the proposed development having a detrimental effect on the developments existing on the adjoining lands.  Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

27. Floor levels must be 225mm above existing ground level.

NOTE 1:    The applicant may undertake actions to ensure that approved residential development is built at 500mm above the 1:100 year flood event, subject to a separate development application approval.

REASON: To reduce the likelihood of damage from floodwaters. Section 79C(1)(c) of the Environmental Planning and Assessment Act 1979, as amended.

 

28. A Compliance Certificate for the plumbing and drainage work identified in Column 1 at the times specified in Column 2 must be obtained from Council.

 

COLUMN 1

COLUMN 2

Internal Sewer Drainage

When all internal plumbing and drainage work is installed and prior to concealment.

External Sewer Drainage

When all external plumbing and drainage work is installed and prior to concealment.

Stormwater Drainage

When all external stormwater drainage work is installed and prior to concealment.

Final

Prior to occupation of the building or structure.

REASON:  It is in the public interest that plumbing work is certifying as complying with AS/NZS 3500.2003 and Plumbing Code of Australia.

 

29. All building work must be carried out in accordance with the requirements of the Building Code of Australia (as in force on the date the application for the relevant Construction Certificate or Complying Development Certificate was made).

REASON:  To ensure the development complies with the requirements imposed under Clause 98 of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A(11) of the Environmental Planning and Assessment Act 1979, as amended.

 

Prior to release of Occupation Certificate / Prior to Operation

 

30. An Occupation Certificate, must be obtained pursuant to Section 109C of the Environmental Planning and Assessment Act 1979, from either Council or an accredited certifying authority, prior to occupation of the building.

In order to obtain this, the “Final Occupation Certificate” form must be completed and submitted to Council with all required attachments - failure to submit the completed Occupation Certificate Application form will result in an inability for Council to book and subsequently undertake Occupation Certificate inspection.

NOTE:           The issuing of an Occupation Certificate does not necessarily indicate that all conditions of development consent have been complied with. The applicant is responsible for ensuring that all conditions of development consent are complied with.

REASON:  It is in the public interest that an Occupation Certificate be issued prior to occupation of the building. Section 79C (1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

31. A final inspection must be carried out upon completion of plumbing and drainage work and prior to occupation of the development, prior to the issuing of a final plumbing certificate Council must be in possession of Notice of Works, Certificate of Compliance and Works as Executed Diagrams for the works. The works as Executed Diagram must be submitted in electronic format in either AutoCAD or PDF file in accordance with Council requirements.

All plumbing and drainage work must be carried out by a licensed plumber and drainer and to the requirements of the Plumbing and Drainage Act 2011.

NOTE:           Additional fees for inspections at the Plumbing Interim Occupancy / Plumbing Occupation stage may apply.  This will depend on the number of inspections completed at this stage of the work/s.

REASON: To ensure compliance with the relevant provisions of the Plumbing and Drainage Act 2011 and Regulations.

 

32. Prior to the issue of an Occupation Certificate a Water Plumbing Certificate from Riverina Water County Council shall be submitted to Council.

NOTE 1:        The applicant is to obtain a Plumbing Permit from Riverina Water County Council before any water supply/plumbing works commence and a Compliance Certificate upon completion of the works. Contact Riverina Water County Council’s Plumbing Inspector on 6922 0618. Please be prepared to quote your Construction Certificate number.

REASON: To ensure that the water servicing requirements of the development have been approved by the relevant authority. Section 79C (1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

33. The commitments listed in any relevant BASIX Certificate for this development must be fulfilled in accordance with the BASIX Certificate Report, Development Consent and the approved plans and specifications.

REASON:  To ensure the development complies with the requirements imposed under Clause 97A of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A (11) of the Environmental Planning and Assessment Act 1979, as amended.

 

 

General

 

34. The stormwater from proposed units 1 & 2 shall not at any stage discharge to the existing laneway, all stormwater generated from the site shall be directed to the Kerb and Gutter along Broad Street. 

 

REASON:  The character of the development is such that storm water runoff will be increased and must be safely conveyed to the storm water drainage system.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

 

35. (1)  For the purposes of Section 80A (11) of the Environmental Planning and Assessment Act 1979, it is a prescribed condition of the development consent that if the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development consent must, at the person’s own expense:

(a)       protect and support the adjoining premises from possible damage from the excavation, and

(b)       where necessary, underpin the adjoining premises to prevent any such damage.

(2)       The condition referred to in subclause (1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

REASON: To ensure the development complies with the requirements imposed under Clause 98E of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A (11) of the Environmental Planning and Assessment Act 1979, as amended.

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                                          RP-1

 




Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                              RP-1

 



Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                       RP-2

 

RP-2               DA16/0660 - ALTERATIONS AND ADDITIONS INCLUDING THIRD STOREY AND SECONDARY DWELLING - 58 LAKEHAVEN DRIVE, LAKE ALBERT, Lot 16 DP 775377

Author:                        Robins, Sam

Sector Manager:       Somerville, Paul

         

Analysis:

The report is for a development application and is presented to Council for decision. The application has been referred to Council for determination as the application seeks to vary one numeric control of the Wagga Wagga Development Control Plan 2010 (DCP) by greater than 10%.

 

 

Recommendation

That Council approve DA16/0660 for alterations and additions including a third storey and secondary dwelling at 58 Lakehaven Drive, Lake Albert, Wagga Wagga NSW Lot 16 DP 775377, subject to conditions outlined in the Section 79C Assessment Report attached.

 

Development Application Details

 

Applicant

Anees Shah

Owner

Anees Shah

Development Cost

$2,000,000

Development Description

Alterations and additions including third storey and secondary dwelling.

 

Key Reasons

Key Issues

 

·    Non-compliance with side setback controls of the DCP

·    Impact on the amenity of the neighbouring properties through over shadowing and overlooking.

 

Assessment

 

In accordance with Clause 1.11 Complying with the Development Control Plan 2010 the application has been referred to Council for determination for the following reason.

 

Where an application involves the variation of one or more controls within the DCP Council staff have delegation to approve variations but limited to the following circumstances;

·    Where any numeric control is not being varied by greater than 10%

 

The application proposes a variation to C2 of Section 9.3.7 of the DCP (side setbacks) by more than 10% therefore the application has been reported to Council for determination.

 

The applicant has submitted written justification for the variations and Council may consent to the proposal if deemed acceptable.

 

C2 of Section 9.3.7 requires a side setback in the R5 zone of 2m. The proposed extensions and additions are set at 1.5m to the wall of the dwelling and 0.835m to the eaves on the eastern elevation and therefore exceed the 10% variation to the control.

 

The applicant has provided reasonable justification that is supported by Council staff and has been summarised below:

 

·    The subject site contains an existing dwelling that is setback 1.5m from the eastern boundary. Therefore the existing dwelling does not comply with the control, however the dwelling was approved and constructed prior to the existence of the control.

 

·    The proposed additions will logically extend from the existing walls.

 

·    Adjoining dwellings are non-compliant with this control.

 

·    The proposed additions have been carefully designed not to result in an unreasonable impact on adjoining properties or character of the area.

 

·    It is considered that the proposal meets the listed objectives of Section 9.3.7.

 

The development generally complies with all other controls and objectives of the DCP. One objection was received and the concerns have been addressed with in the 79C report attached. Considering this and the above justification it is recommended the application be supported.

 

Reasons for Approval

The development is considered to be satisfactory based on the assessment. The proposal complies with the requirements of the Environmental Planning and Assessment Act 1979, the Building Code of Australia (Housing Provisions) and Councils Policies. The application meets the objectives of the LEP and DCP and on merit is considered to be acceptable.

 

Site Location

 

The site, being Lot 16 DP 775377, 58 Lakehaven Drive, Lake Albert is located on the southern side of Lakehaven Drive opposite the Lake.

 

The locality is a large lot residential area located on the southern end of the Lake. The lot measures 1125m² and contains a large detached two storey dwelling. The site falls to the front however the dwellings ground floor has been cut into the site.

 

The site is void of any substantial vegetation.

 

The site contains an electricity easement 2.5m wide that runs along the western boundary.

 

The neighbouring lots are developed and the majority contain large two storey dwellings with large outbuildings and pools. 

 

 

Financial Implications

N/A

Policy

Wagga Wagga Local Environmental plan 2010

Wagga Wagga Development Control Plan 2010

 

Link to Strategic Plan

4. We have a sustainable natural and built environment

4.2 We plan for resilient and sustainable built environments

 

Risk Management Issues for Council

Approval raises no risk management issue and will not create an undesirable precedent. Refusal of the application may result in an appeal process in the Land and Environment Court which will have to be defended by Council. The reasons for refusal will have to be justified and withstand scrutiny and cross examination in Court.

Internal / External Consultation

Standard internal Council referrals of the application occurred.

 

The application was notified to adjoining neighbours for a period of 7 days and one submission was received.

 

The application was referred to Essential Energy and no comments were received.

 

See the Section 79C Assessment report for full details of all consultation.

 

Attachments  

1.

DA16-0660 - S79C Assessment Report

 

2.

DA16-0660 - Plans

 

3.

DA16-0660 - Statement of Environmental Effects

 

4.

DA16-0660 - Additional Information

 

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                 RP-2

 

 

ww_council

 

 

Report of Development Application

Pursuant to Section 79C of the Environmental Planning and Assessment Act 1979

 

APPLICATION DETAILS

Type of Application

Development Application

 

 

Application No.

DA16/0660

Modification No.

N/A

Council File No.

D/2016/0660

Date of Lodgement

18/11/2016

Applicant

AI Shah

PO Box 2233

WAGGA WAGGA  NSW  2650

Proposal

Alterations & Additions Including Third Storey and secondary dwelling

Description of Modification

N/A

BCA Classification

1a, 10a, 10b

Development Cost

$2000000

Other Approvals

Nil

Concurrence Required

No

Referrals

Internal

External - Essential Energy

Determination Body

Wagga Wagga City Council

Reason

In accordance with Clause 1.11 “Complying with the Wagga Wagga Development Control Plan 2010” the application has been referred to Council for determination as the proposed shed does not comply with Control C2 under Section 9.3.7 of the Wagga Wagga Development Control Plan 2010 by greater than a 10% variation from this control.  

Meeting Date

Council Meeting 30/1/17

Assessment Officer:

Sam Robins


SITE DETAILS

Subject Land

58 Lakehaven Dr LAKE ALBERT  NSW  2650

Lot 16 DP 775377

Owner

AI Shah

Owner’s Consent Provided

18/11/16

 

 

Location

The subject site is located on the southern side of Lakehaven Drive fronting Lake Albert.

 

 


STATUTORY CLASSIFICATION

Pursuant to Part 4 (Division 1)

Environmental Planning Instrument

Wagga Wagga Local Environmental Plan 2010

 

 

Zoning

Under the Wagga Wagga Local Environmental Plan, 2010 - R5 Large Lot Residential

 

 

Land Use Definition

Dwelling (alterations and additions) and secondary dwelling

 

 

Statement of Permissibility

Permissible with consent

 

 

 

REPORT

DESCRIPTION OF DEVELOPMENT

This application is for a $2,000,000 renovation of an existing two storey dwelling. The main components of the works are as follows:

·    Secondary dwelling to rear

·    Addition of third storey

·    Swimming pool at first floor level to front of property

·      Major internal demolition and construction to create 7 bedroom dwelling over three floors with lift, gym and pool

THE SITE & LOCALITY

The site, being Lot 16 DP 775377, 58 Lakehaven Drive, Lake Albert is located on the southern side of Lakehaven Drive opposite the Lake.

The locality is a large lot residential area located on the southern end of the Lake. The lot measures 1125m² and contains a large detached two storey dwelling. The site falls to the front however the dwellings ground floor has been cut into the site

The site is void of any substantial vegetation.

The site contains an electricity easement 2.5m wide that runs along the western boundary.

The neighbouring lots are developed and the majority contain large two storey dwellings with large outbuildings and pools. 

A site visit was undertaken on 25/11/16 by the assessing officer.

SUMMARY OF MAIN ISSUES

Impact on character of the area

Impact on the amenity of adjoining neighbours

Compliance with Councils Development Control Plan 2010

MATTERS FOR CONSIDERATION PURSUANT TO SECTION 79C(1)

For the purpose of determining this development application, the following matters that are of relevance to the development have been taken into consideration pursuant to the provisions of Section 79C(1) of the Environmental Planning and Assessment Act, 1979.

(a)(i) - The provisions of any environmental planning instrument (EPI)

Local Environmental Plan       

Wagga Wagga Local Environmental Plan 2010 (LEP 2010)

The following provisions of the LEP 2010 apply:

Land Use Table

Under the LEP the site is zoned R5 - Large Lot Residential 

The objectives of the zone that would be considered relevant are;

·    To provide residential housing in a rural setting while preserving, and minimising impacts on, environmentally sensitive locations and scenic quality.

·    To ensure that large residential lots do not hinder the proper and orderly development of urban areas in the future.

·    To ensure that development in the area does not unreasonably increase the demand for public services or public facilities.

·    To minimise conflict between land uses within this zone and land uses within adjoining zones.

·    To ensure that the clearing of native vegetation is avoided or minimised as far as is practicable.

 

The proposal would be considered alterations and additions to a dwelling and secondary dwelling.

Under section 3 of Zone R5 dwelling houses are considered permissible with consent and therefore the alterations and additions are also considered permissible in the zone. Secondary Dwellings are also permissible with consent. The dwelling house and associated structures clearly meet the objectives listed above.

 

Part 7 - Additional Local Provisions

7.1A   Earthworks

(1)  The objectives of this clause are as follows:

(a)  to ensure that earthworks for which development consent is required will not have a detrimental impact on environmental functions and processes, neighbouring uses, cultural or heritage items or features of the surrounding land,

(b)  to allow earthworks of a minor nature without requiring separate development consent.

(2)  Development consent is required for earthworks unless:

(a)  the work is exempt development under this Plan or another applicable environmental planning instrument, or

(b)  the work is ancillary to other development for which development consent has been given.

(3)  Before granting development consent for earthworks, the consent authority must consider the following matters:

(a)  the likely disruption of, or any detrimental effect on, existing drainage patterns and soil stability in the locality,

(b)  the effect of the proposed development on the likely future use or redevelopment of the land,

(c)  the quality of the fill or the soil to be excavated, or both,

(d)  the effect of the proposed development on the existing and likely amenity of adjoining properties,

(e)  the source of any fill material and the destination of any excavated material,

(f)  the likelihood of disturbing relics,

(g)  the proximity to and potential for adverse impacts on any watercourse, drinking water catchment or environmentally sensitive area.

 

Minimal earthworks are required as the main excavations exist. Some minor excavation will be required for the extension of the garage and the secondary dwelling to the rear. Given the minor nature of the works no issues are raised against these provisions that cannot be addressed via compliance with recommended conditions of consent.

 

Part 5 Miscellaneous Provisions

5.4   Controls relating to miscellaneous permissible uses

(9) Secondary dwellings
If development for the purposes of a secondary dwelling is permitted under this Plan, the total floor area of the dwelling (excluding any area used for parking) must not exceed whichever of the following is the greater:

(a)  60 square metres,

(b)  33% of the total floor area of the principal dwelling.

 

At 32.4m² the secondary dwelling complies with this clause.

State Environmental Planning Policies

State Environmental Planning Policy No. 55

Clause 7 of SEPP 55 requires Council to consider whether land is contaminated prior to granting consent to the carrying out of any development on that land.  Should the land be contaminated, Council must be satisfied that the land is suitable in a contaminated state for the proposed use. There is no indication that the site has previously been occupied by any use that could have led to contamination of the site. Furthermore the land is not identified on Councils register of contaminated sites. Accordingly it is not considered necessary to request any investigation reports on the subject site.

 

State Environmental Planning Policy (Infrastructure) 2007

Division 5 Electricity transmission or distribution

45   Determination of development applications-other development

(1)  This clause applies to a development application (or an application for modification of a consent) for development comprising or involving any of the following:

(a)  the penetration of ground within 2m of an underground electricity power line or an electricity distribution pole or within 10m of any part of an electricity tower,

(b)  development carried out:

(i)  within or immediately adjacent to an easement for electricity purposes (whether or not the electricity infrastructure exists), or

(ii)  immediately adjacent to an electricity substation, or

(iii)  within 5m of an exposed overhead electricity power line,

(c)  installation of a swimming pool any part of which is:

(i)  within 30m of a structure supporting an overhead electricity transmission line, measured horizontally from the top of the pool to the bottom of the structure at ground level, or

(ii)  within 5m of an overhead electricity power line, measured vertically upwards from the top of the pool,

(d)  development involving or requiring the placement of power lines underground, unless an agreement with respect to the placement underground of power lines is in force between the electricity supply authority and the council for the land concerned.

(2)  Before determining a development application (or an application for modification of a consent) for development to which this clause applies, the consent authority must:

(a)  give written notice to the electricity supply authority for the area in which the development is to be carried out, inviting comments about potential safety risks, and

(b)  take into consideration any response to the notice that is received within 21 days after the notice is given.

         

Given the location of the proposed works the application was required to be referred to Essential Energy. An email was sent on 30/11/16. No response has been received

 

(a)(ii) - The provisions of any draft environmental planning instrument

Draft local environmental plans                                                              

N/A

Draft state environmental planning instruments                                         

N/A

(a)(iii) - Any development control plan

Wagga Wagga Development Control Plan 2010

The relevant controls of the DCP have been addressed below.

 

1.11  Complying with the Development Control Plan 2010

The controls in the DCP support the Guiding Principles of the Plan and principles and objectives within the various sections. Except as varied elsewhere in this Plan, all Development Applications, Section 96 Applications and Section 82A Applications should aim to satisfy all stated objectives and controls.

 

Whilst all developments should aim to satisfy all controls within the DCP, it is acknowledged that there may be circumstances where it may not be possible to achieve strict compliance.

 

Council may consent to an application which departs from any control, whether a “numeric” or non-numeric control. In such cases, a written submission must be lodged with the Development Application.

 

Where an application involves the variation of one or more controls within the DCP Council staff have delegation to approve variations but limited to the following circumstances;

·    Where any numeric control is not being varied by greater than 10%

 

The application proposes a variation to C2 of Section 9.2.2 of the DCP (front fence heights) by less than 10% therefore Council staff have delegation to approve such a variation if it is considered appropriate.

 

The applicant has submitted written justification for the variation and Council may consent to the proposal if deemed acceptable.

 

The application also proposes a variation to C2 of Section 9.3.7 of the DCP (side setbacks) by more than 10% therefore the application has been reported to Council for determination.

 

The applicant has submitted written justification for the variations and Council may consent to the proposal if deemed acceptable.

 

The issues surrounding the variation have been discussed throughout this report, particular attention is drawn to Section 9.3.7 of the DCP.

 

 

2.1    Vehicle access and movements

The proposal includes the construction of a new double garage at ground floor level that will be brought forward from 15m setback to 8.7m setback. The driveway location will not be altered. The location of the garage raises no concerns.

 

2.2    Off-street parking

The development would be subject to the following controls:

·    1 spaces/3 bedroom house or larger.

As mentioned the works will result in a double garage to ensure compliance with this control.

 

Secondary dwellings are not subject to additional parking requirements, however with a large double driveway there is more than adequate off street parking.

2.3    Landscaping

Landscape plans are not required for single dwellings and therefore alterations and additions to single dwellings.

 

The proposal involves the removal of non-native palm trees, no issues are raised with the removal of these trees.

 

2.5    Safety and security

The objectives and controls of this section that are relevant for this development are as follows:

Objectives

O3       Maximise opportunities for natural surveillance of public spaces and building or site entrances.

Controls

C1    Use good site planning to clearly define public, semi-public and private areas.

C2       Entries are to be clearly visible and identifiable from the street, and are to give the resident/occupier a sense of personal address and shelter. For non-residential uses, administration offices or showroom are to be located at the front of the building.

C3    Minimise blank walls along street frontages.

C4    Avoid areas of potential concealment and ‘blind’ corners.

C5       Provide lighting to external entry areas, driveways and car parks in accordance with the relevant Australian Standards. The lighting is to be designed and sited to minimise spill and potential nuisance to adjoining properties.

C6       Planting and fencing is not to reduce the safety of users or compromise areas of natural surveillance.

The design of the alterations and additions raises no safety or security concerns. The proposal is considered generally compliant with the controls and would meet the relevant objective of this section of the DCP. Conditions of consent will require the pool to meet all regulations and standards regarding pool safety.

2.6    Erosion and Sediment Control Principles

Given the location of the proposed works minimal impacts are expected from construction. However recommended conditions of consent will ensure appropriate measures are put in place during the construction phase.

 

2.7    Development Adjoining Open Space

RE1 zoned Public Open space is located directly opposite the site on the northern side of Lakehaven Drive.

The following controls apply:

C1    Private developments are not to gain access across public open space.

C2    Materials are not to be stored on public land.

C3       Design, massing, scale and materials to be compatible with the amenity, views and outlook from the open space area.

C4    Landscaping is not to encroach into any public reserve.

 

Given the Open Space is on the opposite side of the road there will be no issues with construction vehicles utilising this land for the storage of materials or the encroachment of landscaping.

 

The dwelling is large, however it is surrounded by large dwellings, the choice of materials along with the 8m setback from the road means the proposal would not have a detrimental impact on the outlook from the open space.

 

Section 5 Natural Resource and Landscape Management

5.3    Native Vegetation Cover

Although the land is zoned R5 the application is for alterations and additions to an existing dwelling and a secondary dwelling and not for the dwelling itself. However it is important to consider whether the proposed works will impact on any planting requirements. A search of the original subdivision application shows that no plantings were required as part of this original subdivision and therefore the proposed works will not conflict with any planting requirements. This has been confirmed in consultation with Councils Natural Resource Management Officer.

 

 

Section 9 Residential Development

9.2.1 Site layout

The site layout raises little concern. The complete refurbishment of the dwelling has allowed for the main living areas to open to the front of the property on the first floor and take advantage of the northern aspect. The design also allows for excellent natural cross ventilation. No issues are raised with the site layout.

 

9.2.2   Streetscape

The following controls apply:

 

C1       Provide a street address and front elevation that is consistent with the predominant scale, rhythm and form of the street.

 

The works would result in a large three storey dwelling from Lakehaven drive. The building would be grand in form and scale but given what is surrounding would not be considered out of context and setting. Both adjoining properties are large two storey detached dwellings with a mix of materials and roof forms. The wider surrounding properties mainly continue in the same vein. Given the slight fall of the lot to the street and the ground floor being set below natural ground level the impact of the addition of a third storey has been reduce. 

 

C2       Front fence height forward of the building line is not to exceed 1200mm. However, a side boundary fence forward of the building line may be permitted to taper from the maximum permitted height (1.8 metres) at the building line down to the 1200mm maximum permitted height at the front boundary.

 

The applicant has proposed a 1.3m front fence. Whilst this exceeds the 1.2m permitted under this control it’s within the 10% variation that can be considered by delegation under section 1.11 of the DCP.

 

The applicant has provided the following justification:

“The existing streetscape comprises various fencing designs and heights, with no uniformity.

 

The proposed fence will define territorial boundaries and provide an interactive private open space whilst ensuring casual street surveillance and social interaction is maintained through transparent timber slats that comprise the construction of the front gate (for pedestrian access) and the double driveway crossover (for vehicular access). Decorative elements incorporated in the design of the dwelling will be mirrored in the design of the fence, such as timber slats to maintain design compatibility.

 

The height of the fence is compatible with the scale of the dwelling, given the additions will incorporate a third storey and the built form will remain the dominant feature.  The proposed variation of 100mm, when compared to the scale of the dwelling and surrounding dwellings, would be visually insignificant.”

 

It is considered that the proposal meets the objectives of Clause 9.2.2 of the DCP and will not unduly dominate the streetscape or impact the character of the streetscape.  Therefore it can be seen that proposal will be acceptable with support from Council. Assessment Officers agree with the above justification and add that the fence is consistent with the surrounding built form and therefore meets the objectives of the section without unreasonably impacting on amenity.

 

C3       Fence height at and behind the building line is not to exceed 1800mm in height.

 

The fence exists and is not proposed to be altered as part of this application. The pool fence will be required to meet the relevant standards.

 

9.2.4 Sloping sites

The site is sloped however the excavation has already taken place as part of the existing dwelling construction. Only minor earthworks are proposed, and given the proposal is for a refurbishment of an existing dwelling no specific design for the slope of the land is required.  

 

9.3.4 Solar access

C1.      Locate garages, laundries and bathrooms to provide insulation from western sun.

The dwelling does not comply with this control. Given the orientation of the lot compliance would require the garage, laundry and bathrooms all to be located on the western side of the dwelling. Therefore a variation is acceptable for the following reasons. The garage has been located on the northern elevation as this is the front of the property and where the current garage is located. Given the scale of the property the location of the bathrooms and laundry is not restrictive to the location of the main living areas to ensure good north eastern exposure as per the relevant objective.   The applicant has demonstrated that the design meets the energy requirements of Basix and therefore should be considered acceptable.  

C2.      Locate living areas and private open space to ensure orientation to the north and north east where possible.

The private open space and living areas comply with this control.

C3.      For single dwellings, dual occupancies, secondary dwellings & shop top housing the windows to the main internal living area and at least half the private open space are to receive a minimum 3 hours direct sunlight between 9am and 3pm in mid-winter (June 22).

The design of the dwelling has north facing windows to the living areas and would therefore address this control.  

The location of the dwelling on the site means there is more than adequate north and east facing private open space.

The secondary dwelling is more of a concern being it has been located to the rear of the property on the south eastern elevation behind the three storey dwelling makes it difficult to achieve the required 3hours sunlight. However the solar diagrams submitted with the proposal indicate that the full length windows along the western elevation of the secondary dwelling will receive at least 3hours direct sunlight albeit for only a small part of the main living room of the secondary dwelling.

 

C5       For any adjacent dwellings that have north facing living areas, maintain 3 hours sunlight access to the windows of the living areas between 9am and 3pm in mid-winter (June 22).

 

13 Clare Avenue is to the south of the property and has north facing living areas. However it is approximately 35m from the boundary fence and therefore not impacted by the proposal.

 

56 Lakehaven Drive is a two storey detached dwelling to the west. The windows along the relevant elevation face east and are separated by the driveway that runs down this side of the property. The main living areas are not located on this elevation as they face north (to the front) of the property. The proposed alterations and additions would have negligible impacts on any north facing living areas on this property.

 

60 Lakehaven Drive is a two storey detached dwelling to the east that has windows along the western elevation. Whilst these windows will be impacted to a degree by the proposed works, it would not reduce the direct sunlight to the living areas to less than 3 hours as they have good northern aspect that will not be impacted.

 

C6       Proposed development design should take into account the location of any adjacent private open space and avoid overshadowing of that space

 

The applicant has submitted solar diagrams that indicate very marginal over shadowing of the very rear portion of the yard at 13 Clare Place. Given the large size of this property this impact is seen as negligible and acceptable.

 

The solar diagrams show some overshadowing to number 56 Lakehaven but this is mainly to the driveway and eastern elevation of the property. Number 56 has its private open space at the front of the property and this will not be impacted by the proposal.

 

The main impact is to Number 60 Lakehaven Drive. The solar diagrams show that at 3pm on 21/6/15 a portion of the rear yard and what is quite clearly private open space will be impacted by the proposed development. The solar diagram is worst case (being middle of winter) and shows that the rear yard at number 60 will not be impacted between 9am and 12midday. What the diagram does not show is the impact of the current dwelling. The two storey nature of the current dwelling will have an impact on this rear yard already, whilst it will not be to the same degree it is a relevant consideration. Given the private open space will only be impacted from 12midday onwards and will not be fully shaded in the worst case scenario, along with the existing impact of the current dwelling its considered that on balance the impact is acceptable. 

 

9.3.5 Private open space

The dwelling easily meets this control with excellent private open space to the front and rear of the property.

 

9.3.6 Front setbacks

C1    Minimum front setbacks for residential development

          Primary street frontage (other roads) 6m

Secondary frontage (corner lot) 3m

         

The garage has been brought forward but is level with the existing front setback of 8.7m and therefore complaint with this control.

C4       The front elevation of a dwelling as visible from a public road shall include at least one change in plane of the dwelling wall (that encloses a habitable room) of a minimum of 500mm. The front of the garage shall not protrude in front of the face of the forward most wall of the dwelling enclosing a habitable room. In all instances, the garage shall not encroach on the front setback identified under C1.The forward most part of a building/dwelling wall shall not project forward of the building line. Refer to diagrams opposite.

 

The articulation of the front elevation ensures the proposal complies with this control.

 

9.3.7 Side and Rear Setbacks

The relevant objectives and controls are as follows:

Objectives

O1       Ensure adequate separation between buildings for landscaping, privacy, natural light and ventilation.

O2       Ensure new development continues the rhythm or pattern of development in the locality.

O3    Provide access for maintenance.

O4       Building setbacks from the side and rear boundaries shall have careful regard to the impact of proposed structures on adjoining landowners.

 

Controls

C1       The rear setback for detached secondary dwellings is determined by site conditions and the setbacks of similar structures on adjoining and nearby sites.

C2       Any point of a building must have a setback from the side boundary nearest to that point of at least:

a) If the lot is in Zone R5 a setback of 2m,The side setbacks are at least 2m and therefore compliant with this control.

The western side setback of the existing dwelling is 2.7m to the wall and 1.93m to the eaves. The eastern side setback of the existing dwelling is 1.5m to the wall of the dwelling and 0.835m to the eaves. The proposed additions continue along these building line setbacks and therefore the proposal does not comply with the 2m setback requirement and given the variation of the eastern setback is greater than 10% the application is required to be determined by Council.

 

The applicant has provided the following justification:

 

“The subject land contains a dwelling.  The dwelling is setback 1.5m from the eastern property boundary to the eastern wall and 0.835m to the eaves.  The existing dwelling does not comply with the prescribed setback of 2 metres, however the dwelling was approved prior to the existence of the numerical control. 

 

It is also important to note from the aerial image that adjoining dwellings and their proximity to side boundaries, are also non-compliant. 

 

The proposed development is logical given the additions are in line with the existing footprint and the pattern of development will continue toward the rear of the site.  The proposed development has been carefully designed to ensure it will not create adverse amenity or privacy impacts for both residents of the proposal and adjoining properties.  The proposal provides adequate separation from the eastern property boundary to all for privacy, natural light, ventilation. 

 

Irrespective of the encroachment, it is considered that the proposed additions are designed to sit comfortably without impacting the streetscape along Lakehaven Drive and is consistent with the existing rhythm as evident in the above aerial photo. The proposal maintains existing setbacks that ensures adequate space for landscaping can be achieved, while access for maintenance has not been compromised.  The proposed development complies with the National Construction Code.

 

It is considered that the proposal meets the objectives of Clause 9.3.7 of the DCP without impacting upon the amenity of neighbouring properties, particularly when having regard to the proposed setbacks. Therefore, it is considered that the proposal will be acceptable with support from Council.”

 

Council staff support the justification above. The dwelling was approved prior to this numerical control existing. The location of the extension is logical, it also provides adequate separation to allow for maintenance and as discussed throughout this report has negligible impact on the amenity of neighbouring properties or the character of the area. Council officers therefore recommend supporting this variation.

 

 

9.4.1 Building elements

The relevant controls of this section are as follows;

C1       Use verandahs or pergolas to link internal and external living areas

C2       Porches are to be integrated into the building design, and are to be used to create a sheltered and clearly visible entry.

C3       Locate ancillary components such as aerials, satellite dishes, air conditioning units and the like so they are not visible from the street.

C5       Secondary dwellings are to appear as a single occupancy from the public domain.

The alterations and additions and secondary dwelling have been designed to incorporate the majority of the abovementioned design elements. The secondary dwelling is not visible from the street and therefore appears as a single occupancy. No issues are raised under this section of the DCP.

 

9.4.2 Materials and finishes

The materials and finishes would not raise any issues.

 

9.4.3 Privacy

Visual and acoustic privacy are important for good residential amenity. Given the scale of the works and the three storey addition, overlooking of adjoining properties needs to be carefully considered.

The ground floor raises no concern given it will be located behind an existing fence.

There are no issues to the rear from any storey given the separation discussed previously in this report.

There are no issues to the front from any storey as the outlook is Lake Albert and RE1 Public Recreation land.

The first floor has been proposed to be completely refurbished and will include a number of new windows to a variety of rooms on both the eastern and western elevations including main living areas.

To the west, as mentioned, a driveway runs down the side of Number 56 to provide separation and the private open space is to the front of the property. Whilst there will be an increase in windows along this elevation, windows and a large balcony to the front of the property already exist and the degree of overlooking will not be increased to a level that would be considered unreasonable.

Whilst there is no driveway separating the properties on the eastern boundary the relationship at first floor level remains similar given the existing windows and large balcony. The privacy to Number 60 would not decrease to a level that could reasonably warrant refusal.

The third storey creates a new level and therefore new impacts. The third storey is proposed to contain three bedrooms and three bathrooms. With no living space at this level the impacts from all windows would in any case be minor. However the level has been well designed, set in the middle of the building with maximum separation from both side boundaries. A setback of 4m to the eastern boundary and 5m to the western boundary is more than adequate for bedroom, bathroom and robe windows when the outlook is the side of the neighbouring property and not direct overlooking to private open space.

Whilst it is acknowledged that there will be an increase in privacy issues on both the adjoining properties to the east and west it is not to a degree that would be seen as unreasonable and therefore the proposal is considered to meet the objectives of this section.

The secondary dwelling is located on natural ground to the rear of the site and will raise no unreasonable privacy concerns given the existing fencing and similar slope of adjoining lots.

The location of the pool pump has not been indicated. However conditions of consent will control its operation hours. The impact is considered to be acceptable.

9.4.4 Garages, carports, sheds and driveways

The garage has been moved forward but the door remains complaint with the controls being 6m in length, less than 50% of the front elevation and 2.4m high.

 

9.4.5 Site facilities

The design of the buildings raises no issues with site facilities, conditions of consent will ensure all requirements are met.

 

9.4.6 Changing the landform - cut and fill

As discussed above the site has already been legally cut and therefore minimal site cut and fill is required. No retaining walls have been proposed as part of this application.

 

(a)(iiia) - any planning agreement that has been entered into under section 93F, or any draft planning agreement that a developer has offered to enter into under section 93F, and

No planning agreement has been entered into under section 93F.

(a)(iv) - any matters prescribed by the regulations

Matters prescribed by the Environmental Planning and Assessment Regulation 2000 have been satisfied   

(b) - The likely impacts of the development

Context and setting

The proposed alterations and additions are located on an appropriately zoned and sized lot. Although large the finished building will be in keeping with the large buildings in close proximity. Number 56 has a pool on the front elevation so the proposed pool will not be out of character. The secondary dwelling has been well located to the rear of the property. 

Access, transport and traffic

As mentioned above the existing arrangements would not be altered.

Noise and vibration

Minimal impact during construction and will be controlled by conditions of any consent granted.

Natural Hazards

The site is not bush fire prone or flood prone.

Waste

Conditions of consent will ensure that the site is kept in an appropriate state during demolition and construction.

Services/Utilities     

As the subject development is located within an established residential area, all power, water, sewer and telecommunications are available to the site.

         

As discussed above the site contains an Electricity Easement 2.5m wide along the western boundary. The setback to the wall of the existing and proposed works is 2.7m, therefore outside of the easement. The existing eaves do overhang this easement and the proposed will be setback 1.93m so will also overhang the easement. The application was referred to Essential Energy and no comments were received.

Whilst it is not common for the eaves to overhang the easement given the situation already exists and is at a first floor level they will not impede on access to this easement if required. With no comments received and the current situation not being made any worse Council raises no issues with this encroachment.

 

Public domain

No issues raised as the public land is opposite the site and will not be used for storage of building materials. The finished dwelling will be in keeping with the character of the area when viewed from the public land.

 

Other land resources

The land is zoned residential and all relevant assessments were undertaken at subdivision stage. No issues.

 

Water

The proposed works have an approved Basix Certificate, Council imposes no additional requirements that relate to water saving. The site is serviced by water and has appropriate stormwater facilities.

 

Soils

Soil tests will determine the building requirements at construction certificate stage. Conditions of consent will ensure any fill brought onto site is of an acceptable standard.

 

Air and microclimate

Conditions of consent will minimise impacts during construction. No adverse impacts are expected

 

Safety, security and crime prevention

The proposed alterations and additions raise no issues in a residential zone.

 

Social/economic impacts

The proposed works will provide employment for the local construction industries.

 

Flora and fauna       

As discussed above only non-native species will be removed as part of this application. No concerns are raised.

Site Design and internal design      

The works involve a complete overhaul of the existing dwelling. The new internal layout provides better solar access and cross ventilation without unreasonably impacting the amenity of the neighbouring properties. Whilst a large portion of the site is now covered by the dwelling and secondary dwelling more than adequate private open space remains on site.

Pools are commonplace in the residential areas of wagga and therefore the pool raises no concerns. 

Overall the development would be considered acceptable on a merits based assessment for the site.

 

The Principles of Ecologically Sustainable Development

The following are principles of ecological sustainability:

1   The precautionary principle

Where there are threats of serious or irreversible environmental damage, lack of full scientific certainty should not be used as a reason for postponing measures to prevent environmental degradation.

In the application of the precautionary principle, public and private decisions should be guided by:

(a)  careful evaluation to avoid, wherever practicable, serious or irreversible damage to the environment, and

(b)  an assessment of the risk-weighted consequences of various options.

The principle requires decision-making to give the environment the benefit of the doubt.

2   Intergenerational equity

The present generation should ensure that the health, diversity and productivity of the environment are maintained or enhanced for the benefit of future generations (that is, a partnership among all of the generations that may use or expect to benefit from the nation’s resources).

3   Conservation of biological diversity and ecological integrity

Conservation of biological diversity and ecological integrity should be a fundamental consideration.

4   Improved valuation, pricing and incentive mechanisms

Environmental factors should be included in the valuation of assets and services:

(a)  polluter pays (that is, those who generate pollution and waste should bear the cost of containment, avoidance or abatement), and

(b)  the users of goods and services should pay prices based on the full cycle costs of providing goods and services, including the use of natural resources and assets and the ultimate disposal of any waste, and

(c)  environmental goals having been established should be pursued in the most cost-effective way by establishing incentive structures, including market mechanisms which enable those best placed to maximise benefits or minimise costs to develop their own solutions and responses to environmental problems.

The proposed development would result in residential development in a large lot residential zone. The impacts assessed above have concluded that the development would be acceptable with minimal impact on the environment.

 (c) - The suitability of the site for the development

Suitability of the site in terms of the likely impacts identified under (b)

The site is currently zoned large lot residential and contains a detached two storey dwelling. The site is considered suitable for alterations and additions and secondary dwelling. Compliance with conditions of consent will overcome concerns making the site suitable in terms of the impacts identified under section b.

 

 

(d) - any submissions made in accordance with this Act or the Regulations

Referrals                                       

Internal

External - Essential Energy

Notification       and advertising                                    

In accordance with the Council’s advertising and notification provisions outlined in Section 1.10 of the WWDCP the application was notified for a period of 7 days on the following dates 28/11/16 to 6/12/16 and referred surrounding tenancies. One submission was received and has been considered throughout this report.

Public Submissions and those from public authorities

Essential Energy - No comments received

 

Public Submission

 

Issue: Height of Building - Please confirm that this is compliant with the covenant on the building restrictions.

Comment: The height control within the covenant is not a Council imposed covenant that is required to be considered and complied with as part of assessment under the EP&A Act as stated in Section 1.9A of the LEP.

 

Issue: Shadowing - The proposal will shadow a considerable portion of our house and land.

Comment: This issue has been discussed in detail in the body of this report and acknowledged that the property in question will be impacted by the proposed renovations and extensions. However it was considered on balance that the impact would not be enough to warrant refusal of this application.

 

Issue: Car parking concerns - The development contains seven bedrooms and a guest house suggesting a large number of occupants. Parking problems already exist along Lakehaven Drive

Comment: The proposal provides more than the one space required for a development of this nature. The site has a double garage and double width 8m long driveway to the front of that. This is considered more than adequate parking. Community standards for the provision of car parking have been satisfied which implies that the requirements of the development will be met on site. Council cannot regulate legal use of on-street parking by residents and/or vistors.

 

Issue: Location and potential size of air-conditioning unit - The current system is opposite our bedrooms making sleeping impossible during its use. Given the size of the development this will probably need to be made larger. Could we be consulted on location of new unit and could council assess noise of current unit.

Comment: Details of any new air conditioning unit have not been provided and therefore will need to meet the Exempt provisions when and if installed. The exempt provisions are only an issue for Council if not complied with.

 

The objector was advised to write in separately to raise a noise complaint regarding the current air-conditioning unit.

 

Issue: Privacy - Due to the height of the development our privacy will be compromised in our backyard and rooms on the western side of the dwelling.

Comment: This issue has been discussed in the body of the report. Again it is acknowledged that the property is question will be subject to some privacy concerns. However the extensions and alterations have been well designed to consider this issue and on balance it was considered that the degree of overlooking would not be unreasonable.

 

Issue: Drainage - Due to previous works by the then owners we are subject to overland flow flooding during heavy rains. Water also runs from 13 Clare Avenue into our yard and the yard of 58. This is a significant problem as our garage floods. The stormwater pit shown near existing air con either is not present or not working. Drainage of roof water is a concern given the size of the roof.

Comment: The objector was again advised to write a separate letter raising concerns regarding existing stormwater running onto their property.

 

With regards to this application conditions of consent will require the applicant to obtain a Section 68 approval for all plumbing and drainage works. This will require plans and inspections to ensure the works comply with the relevant Australian Standards and Codes. Furthermore Council’s mapping system does not indicate this lot or any surrounding lots as having overland flow flooding issues.

 

(e) - the public interest

Federal, state and local government interests and general community interests

It is considered that this application will not have a detrimental affect on the public interest.

 

Other Legislative Requirements

Section 5A ("Seven Part Test" - Threatened Species)

The following factors must be taken into account in making a determination under this section:

(a)  in the case of a threatened species, whether the action proposed is likely to have an adverse effect on the life cycle of the species such that a viable local population of the species is likely to be placed at risk of extinction,

(b)  in the case of an endangered population, whether the action proposed is likely to have an adverse effect on the life cycle of the species that constitutes the endangered population such that a viable local population of the species is likely to be placed at risk of extinction,

(c)  in the case of an endangered ecological community or critically endangered ecological community, whether the action proposed:

(i)  is likely to have an adverse effect on the extent of the ecological community such that its local occurrence is likely to be placed at risk of extinction, or

(ii)  is likely to substantially and adversely modify the composition of the ecological community such that its local occurrence is likely to be placed at risk of extinction,

(d)  in relation to the habitat of a threatened species, population or ecological community:

(i)  the extent to which habitat is likely to be removed or modified as a result of the action proposed, and

(ii)  whether an area of habitat is likely to become fragmented or isolated from other areas of habitat as a result of the proposed action, and

(iii)  the importance of the habitat to be removed, modified, fragmented or isolated to the long-term survival of the species, population or ecological community in the locality,

(e)  whether the action proposed is likely to have an adverse effect on critical habitat (either directly or indirectly),

(f)  whether the action proposed is consistent with the objectives or actions of a recovery plan or threat abatement plan,

(g)  whether the action proposed constitutes or is part of a key threatening process or is likely to result in the operation of, or increase the impact of, a key threatening process.

The development is in a large lot residential zone and not removing any vegetation; the development will have minimal impact and not impact on any threatened species in the vicinity. No further assessment is required under this section.

Section 79B(3)

As mentioned above there is unlikely to be significant impact and a species impact statement is not required. Therefore concurrence is not required from the Director General of National Parks and Wildlife.

Council Policies

N/A

Comments by Council's Officers

Council's other relevant officers have reviewed the application in accordance with Council's processing procedures. 

 

Development Contributions

The proposal is not required to pay a Section 94A contribution or a Section 64 Stormwater Contribution as these were paid at the time of the original subdivision.

 

The construction of the Secondary Dwelling incurs a Section 68 Sewer contribution

 

Section 64 of the Environmental Planning and Assessment Act 1979, Section 306 of the Water Management Act 2000 as well as the City of Wagga Wagga’s Development Servicing Plan for Stormwater 2007 and/or City of Wagga Wagga Development Servicing Plan for Sewerage 2006 enable Council to levy developer charges based on the increased demands that new development will have on sewer and/or stormwater. A Section 64 contribution of $1916.85 for sewer is payable for this development as a source of funding towards infrastructure within the urban area.

 

Calculation:

Base rate = 3538 x 0.5 = 1769

With CPI = 3538 x 0.5 = 1769 x 108.9/100.5 = 1916.85

 

Other Approvals

Nil

Conclusion

The development is considered to be satisfactory based on the foregoing assessment. The proposal complies with the requirements of the Environmental Planning and Assessment Act 1979, the Building Code of Australia (Housing Provisions) and Councils Policies. The application meets the objectives of the LEP and DCP and on merit is considered to be acceptable.

 

 

 

 


RECOMMENDATION

It is recommended that the Wagga Wagga City Council approve Development Application DA16/0660 for Alterations & Additions Including Third Storey and secondary dwelling, 58 Lakehaven Dr LAKE ALBERT  NSW  2650 , Lot 16 DP 775377 in accordance with the following conditions:-


CONDITIONS

Approved Plans and Documentation

1.         The development must be carried out in accordance with the approved plans and specifications as follows.

Plan/DocNo.

Plan/Doc Title

Prepared by

Issue

Date

SP1.0

Site Analysis Plan

Chriscloutdesign

-

5/10/16

SP2.0

Site Plan

Chriscloutdesign

-

5/10/16

SP3.0

Shadow Diagrams

Chriscloutdesign

-

5/10/16

C1.0

Ground Floor Plan

Chriscloutdesign

-

5/10/16

C2.0

First Floor Plan

Chriscloutdesign

-

5/10/16

C3.0

Second Floor Plan

Chriscloutdesign

-

5/10/16

C4.0

Roof Plan

Chriscloutdesign

-

5/10/16

C6.0

Windows and Doors

Chriscloutdesign

-

5/10/16

C7.0

Elevations

Chriscloutdesign

-

5/10/16

C8.0

Elevations

Chriscloutdesign

-

5/10/16

C9.0

Sections

Chriscloutdesign

-

5/10/16

C10.0

Sections

Chriscloutdesign

-

5/10/16

C11.0

Existing Ground Floor

Chriscloutdesign

-

5/10/16

C12.0

Existing Upper Floor

Chriscloutdesign

-

5/10/16

C13.0

Existing Elevations

Chriscloutdesign

-

5/10/16

C14.0

Ground demolition Plan

Chriscloutdesign

-

5/10/16

C15.0

First Floor Demolition Plan

Chriscloutdesign

-

5/10/16

720164S

BASIX Certificate

Australian Energy Efficiency Consulting

-

5/10/16

-

Statement of Environmental Effects

Anees Shah

-

16/11/16

-

Additional Information

NGH

-

9/1/17

The Development Application has been determined by the granting of consent subject to and as amended by the conditions of development consent specified below.

NOTE:           Any modifications to the proposal shall be the subject of an application under Section 96 of the Environmental Planning and Assessment Act, 1979.

REASON:  It is in the public interest that work is carried out in accordance with the approved plans. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

Prior to release of Construction Certificate

2.         Prior to the issue of Construction Certificate the developer must lodge a bond with Council of:-

$1000.00  for security deposit on the kerb and gutter and footpath

Plus a non-refundable administration fee of $58.

NOTE 1:        Applicants will be required to reference the INDIVIDUAL kerb and gutter bond number (BKG 0581) when lodging bond monies. Please reference the BKG number on the application form which is available from customer service and on council‘s website under the planning tab > document quick links > applications / or alternatively reference BKG number when making electronic payment.

NOTE 2:       All monetary conditions are reviewed annually, and may change on 1 July each year.

NOTE 3:       Works in the form of driveways, kerb and gutter and footpath may require you to obtain a Section 138 Roads Act 1993 approval. Please contact Councils Road Reserve Officer on 1300 292 442 prior to undertaking such works.

NOTE 4:       Council will accept a once off security deposit for the kerb and gutter and footpath for applicants who lodge multiple DA‘s with council. If the applicant has security deposits held by Council for kerb and gutter and footpath at the time of Construction Certificate application, then Council may waive the need for an additional bond to be paid.

NOTE 5:       The bond held on the kerb and gutter and footpath is fully refundable upon completion of all works and upon inspection by Council to ensure that any damage to Council infrastructure has been repaired. The bond will not be refunded in the event that damage done to Council‘s infrastructure is not repaired to the satisfaction of Council. All damage is to be repaired at the full cost of the applicant

REASON:  It is in the public interest that such fees are paid in accordance with Council’s Management Plan.  Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

3.         Prior to the release of Construction Certificate a compliance certificate under s306 of the Water Management Act 2000 must be obtained in respect of the development relating to water management works that may be required in connection with the development.

NOTE1:         ‘Water management work’ is defined in s283 of the Water Management Act to mean a ‘water supply work‘, ‘drainage work‘, ‘sewage work’ or ‘flood work’. These terms are defined in that Act.

NOTE 2:        Riverina Water is responsible for issuing compliance certificates and imposing requirements relating to water supply works for development in the Council‘s area - please contact Riverina Water to ascertain compliance certificate water supply related requirements. A copy of such a compliance certificate is required prior to release of Construction Certificate.

NOTE 3:        The Council is responsible for issuing compliance certificates and imposing requirements relating to sewerage, drainage and flood works for development in its area.

NOTE 4:        Under s306 of the Water Management Act 2000, Riverina Water or the Council, as the case requires, may, as a precondition to the issuing of a compliance certificate, impose a requirement that a payment is made or works are carried out, or both, towards the provision of water supply, sewerage, drainage or flood works.

NOTE 5:        The Section 64 Sewer base figure is $1769

The Section 64 Sewer contribution (updated by the CPI) required to be paid is $1916.85

NOTE 6:        The Section 64 Stormwater base figure is Nil

The Section 64 Stormwater contribution (updated by the CPI) required to be paid is Nil

NOTE 7:        Section 64 contributions shall be indexed in accordance with CPI annually at the commencement of the financial year.

NOTE 8:        The figures outlined in this consent are based on the current rate of CPI. Please be advised that CPI changes on a regular basis and you are advised to contact Council prior to payments being made, to ensure no further CPI increases/decreases have occurred since the date of this consent.

REASON: It is in the public interest that Council maintain the ability to provide adequate water and sewer reticulation services. Section 79C(1)(c) and (e) of the Environmental Planning and Assessment Act 1979, as amended).

 

Prior to Commencement of Works

4.         Prior to works commencing on site, toilet facilities must be provided, at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out, at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be:

a)         a standard flushing toilet connected to a public sewer, or

b)        if that is not practicable, an accredited sewage management facility approved by Council, or

c)         if that is not practicable, any other sewage management facility approved by Council.

NOTE 1:        The provision of toilet facilities in accordance with this condition must be completed before any other work is commenced and the toilet facility must not be removed without the prior written approval of Council.

NOTE 2:        “Vicinity” in this condition is defined to mean within 50 metres of the subject building site.

NOTE 3:        The toilet facilities are to comply with all WORK COVER NSW requirements.

REASON:  To provide adequate sanitary facilities during the construction phase.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

5.         A CONSTRUCTION CERTIFICATE pursuant to Section 109C of the Environmental Planning and Assessment Act 1979, as amended from either Council or an accredited certifying authority certifying that the proposed works are in accordance with the Building Code of Australia PRIOR to any works commencing.

NOTE 1:        No building, engineering, excavation work or food premises fitout must be carried out in relation to this development until the necessary Construction Certificate has been obtained.

NOTE 2:        YOU MUST NOT COMMENCE WORK UNTIL YOU HAVE RECEIVED THE CONSTRUCTION CERTIFICATE, even if you made an application for a Construction Certificate at the same time as you lodged this Development Application.

NOTE 3:        It is the responsibility of the applicant to ensure that the development complies with the provision of the Building Code of Australia in the case of building work and the applicable Council Engineering Standards in the case of subdivision works. This may entail alterations to the proposal so that it complies with these standards.

REASON:  To ensure the design of the proposed work may be assessed in detail before construction commences and because it is in the public interest that the development complies with the appropriate construction standards. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

6.         Prior to works commencing a container must be erected on site for the enclosure of all building rubbish and debris, including that which can be wind blown. The enclosure shall be approved by Council and be retained on site at all times prior to the disposal of rubbish at a licenced Waste Management Centre.

Materials and sheds or machinery to be used in association with the construction of the building must not be stored or stacked on Council’s footpath, nature strip, reserve or roadway.

NOTE 1:        No building rubbish or debris must be placed, or be permitted to be placed on any adjoining public reserve, footway, road or private land.

NOTE 2:        Weighbridge certificates, receipts or dockets that clearly identify where waste has been deposited must be retained. Documentation must include quantities and nature of the waste.  This documentation must be provided to Council prior to application for an Occupation Certificate for the development.

NOTE 3:        The suitable container for the storage of rubbish must be retained on site until an Occupation Certificate is issued for the development.

REASON:  To ensure that the building site and adjoining public places are maintained in a clean and tidy condition so as not to interfere with the amenity of the area. Section 79C (1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

7.         Prior to the commencement of works erosion and sediment control measures are to be established and maintained to prevent silt and sediment escaping the site or producing erosion.  This work must be carried out and maintained in accordance with Council’s:-

a)         Development Control Plan 2010 (Section 2.6 and Appendix 2)

b)        Erosion and Sediment Control Guidelines for Building Sites; and

c)         Soils and Construction Volume 1, Managing Urban Stormwater

Prior to commencement of works, a plan illustrating these measures shall be submitted to, and approved by, Council.

NOTE:           All erosion and sediment control measures must be in place prior to earthworks commencing. 

REASON:  To ensure the impact of the work on the environment in terms of soil erosion and sedimentation is minimised. Section 79C (1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

8.         A Section 68 Approval must be obtained from Council prior to any sewer or stormwater work being carried out on the site.

The licensed plumber must submit to Council, at least two (2) days prior to the commencement of any plumbing and drainage works on site a “Notice of Works”.

NOTE:           A copy of the Notice of Works form can be found on Council’s website.

REASON: It is in the public interest that plumbing and drainage work is carried out with the relevant approvals required under the Local Government Act 1993 and the Plumbing Code of Australia. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

9.         Building work (within the meaning of the Home Building Act 1989) must not be carried out unless the Principal Certifying Authority for the development:

a)         in the case of work done by a licensee under the Act:

i)          has been informed in writing of the licensee’s name and contractor license number, and

ii)         is satisfied that the licensee has complied with the requirements of Part 6 of that Act, OR

b)        in the case of work to be done by any other person:

i)          has been informed in writing of the person’s name and owner-builder permit number, or

ii)         has been given a declaration, signed by the owner of the land, that states that the reasonable market cost of the labour and materials involved in the work is less than the amount prescribed for the purposes of the definition of owner-builder work in Section 29 of the Act,

and, is given appropriate information and declarations under paragraphs a) and b) whenever arrangements for the doing of the work are changed in such a manner as to render out of date any information or declaration previously given under either a) or b).

NOTE:           A certificate issued by an approved insurer under Part 6 of the Home Building Act 1989 that states that the person is the holder of an insurance policy is sufficient evidence to satisfy this condition.

REASON:  To ensure the development complies with the requirements of Clause 98 of the Environmental Planning and Assessment Regulations 2000, and Section 80A(11) of the Environmental Planning and Assessment Act 1979, as amended.

 

10.       Prior to works commencing, a sign must be erected in a prominent position on any work site on which work involved in the erection or demolition of a building is being carried out:

a)         stating that unauthorised entry to the site is prohibited, and

b)        showing the name of the person in charge of the work site and a telephone number at which that person may be contacted outside work hours

c)         the development consent or complying development consent number, the name and contact details of the Principal Certifying Authority.

Any sign must be removed when the work has been completed.

NOTE:           This condition does not apply to:

a)   building work carried out inside an existing building, or

b)  building work carried out on premises that must be occupied continuously (both during and outside work hours) while the work is being carried out.

REASON:  To ensure the development complies with the requirements imposed under Clause 98 of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A(11) of the Environmental Planning and Assessment Act 1979, as amended.

11.       At least two (2) days prior to the commencement of any works, the attached ‘Notice of Commencement of Building or Subdivision Works and Appointment of Principal Certifying Authority’, must be submitted to Council.

REASON:  Because it is in the public interest that Council receive notification in accordance with the provision of the Environmental Planning and Assessment Act 1979, as amended. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

During works

12.       If the Council is appointed as the Principal Certifying Authority the following inspections must be undertaken by Council and a satisfactory Inspection Report must be issued by Council for such works prior to any further works being undertaken in respect of the subject development.  Inspection Stages for construction are listed in Column 1 and must be inspected by Council at the times specified in Column 2.

COLUMN 1

COLUMN 2

Footings

When the footings have been excavated and all steel reinforcement has been placed in position.

Slab

When reinforcement steel has been placed in position in any concrete slab, whether or not the slab is suspended, on the ground, or on fill.

Bearers and joists

Prior to the laying of the floor.

Wall frame

When the frame has been erected and prior to sheeting and or brick veneer outer wall has been constructed and tied to the frame.

Roof frame

When external roof covering has been installed and prior to the installation of the ceiling lining and eaves soffit lining.

Wet areas

When waterproofing has been applied to all wet areas, prior to tiling or finishing of surface.

Drainage

When the stormwater and roof water drainage system has been completed.

Final

Required prior to occupation of the building

NOTE 1:        A Final Occupation Certificate in relation to the building cannot be issued by Council until all Inspection Reports required by this condition have been issued by Council. Prior to or at the time of the application for Occupation Certificate the application for “Occupation Certificate” form attached to the Council issued Construction Certificate must be completed and submitted to Council with all required attachments - failure to submit the completed Occupation Certificate application form will result in an inability for Council to book and subsequently undertake occupation certificate inspection.

NOTE 2:        The above Inspection Reports are required whether or not the work has been inspected by a Structural Engineer, a lending authority or any other person. If the Inspection Reports are not issued Council may refuse to issue a Building Certificate under Section 149A of the Environmental Planning and Assessment Act 1979, as amended.

NOTE 3:        Submission of the bracing plan and the Truss and Frame Certificate is required seven (7) working days before the frame inspection.

REASON:  It is in the public interest that critical stage inspections be issued for these components of the development in accordance with Section 162A of the Environmental Planning and Assessment Regulations 2000 as amended.

 

13.       The Builder must at all times maintain, on the job, a legible copy of the plan and specification approved with the Construction Certificate.

REASON:  It is in the public interest that a copy of the Construction Certificate plans are available, and Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

14.       All excavation and backfilling associated with the erection/demolition of the building must be properly guarded and protected to prevent them from being dangerous to life or property.

Excavations must be undertaken in accordance with the terms and conditions of Section 9.4.6 of the Wagga Wagga Development Control Plan 2010.

REASON:  It is in the public interest that all building elements are able to withstand the combination of loads and other actions to which it may be subjected.  Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

15.       Any alterations or additions marked by Council on the approved plans and/or the specifications must be carried into effect.

REASON:  It is in the public interest that work is carried out in accordance with the approved plans. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

16.       The concrete slab floor shall be treated against termites in accordance with AS 3660-1 2000 Termite Management:

a)         NON CHEMICAL - where a non chemical treatment (physical barriers) is to be used the applicant shall submit details to Council prior to any work commencing.

b)        CHEMICAL RETICULATION - where a chemical method of treatment is to be used by way of reticulation, details shall be provided to Council for approval prior to installation accompanied by a signed maintenance contract with a Pest Control Operator.

Applicants and owners are to ensure that an annual inspection is undertaken to determine need for treatment.

c)         CHEMICAL TREATMENT - where a chemical method of treatment is to be used by way of hand spray treatment before laying the slab, details shall be provided to the Council for approval prior to installation.

Warning - Applicants and owners are warned that the expected life of the under floor barrier (Chemical Treatment) is only ten (10) years and the external barrier (Chemical Treatment) is only five (5) years. The actual protection will depend on factors such as termite hazards, climate and soil conditions.

Council recommends in all cases of chemical treatment including reticulation that regular annual inspection be carried out by a licensed Pest Control Operator to determine the need for re-treatment.

d)        Upon installation of the method of treatment, a Certificate shall be issued to Council by the licensed installer of the system certifying that the system installed is in accordance with AS 3660-1 and in accordance with any specific requirements of the Council.

e)         A durable notice must be permanently fixed to the building in the electricity meter box indicating:

i)          The method of protection

ii)         The date of installation of the system

iii)        Where a chemical barrier is used, its life expectancy as listed on the National Registration Authority label.

iv)        The need to maintain and inspect the system on a regular basis.

REASON:  It is in the public interest that where appropriate termite management treatments are used in compliance with AS 3660.1.2000 Termite Management New Building Work. Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

17.       The demolition must be carried out in accordance with the provisions of Australian Standard AS2601-2001: The Demolition of Structures.

Within fourteen (14) days of completion of demolition, the following information shall be submitted to Council for assessment and approval:

a)         an asbestos clearance certificate prepared by a competent person; and

b)        a signed statement verifying that demolition work and the recycling of materials was undertaken in accordance with any Waste Management Plan approved with this consent. In reviewing such documentation Council will require the provision of actual weighbridge receipts for the recycling/disposal of all materials.

NOTE 1:       Developers are reminded that WorkCover requires that all plant and equipment used in demolition work must comply with the relevant Australian Standards and manufacturer specifications.

NOTE 2:      Demolition works involving the removal and disposal of asbestos cement must only be undertaken by contractors who hold a current WorkCover “Demolition Licence” and a current WorkCover “Class 2 (Restricted) Asbestos Licence”.

NOTE 3:        Competent Person (as defined under Safe Removal of asbestos 2nd Edition [NOHSC: 2002 (2005)] means a person possessing adequate qualifications, such as suitable training and sufficient knowledge, experience and skill, for the safe performance of the specific work.

NOTE 4:        A licence may be required for some of the tasks described in the document entitled Safe Removal of Asbestos 2nd Edition as requiring a competent person.

REASON:  It is in the public interest that the demolition be carried out in a safe manner and that the utilities be protected from damage.  Section 79C(1)(a) & (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

18.       The permitted construction hours are Monday to Friday 7.00am to 6.00pm and Saturday 7.00am to 5.00pm, excepting public holidays. All reasonable steps must be taken to minimise dust generation during the demolition and/or construction process. Demolition and construction noise is to be managed in accordance with the Office of Environment and Heritage Guidelines.

REASON:  To ensure building works do not have adverse effects on the amenity of the area.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

19.       All earthworks, filling, building, driveways or other works, must be designed and constructed (including stormwater drainage if necessary) so that at no time, will any ponding of stormwater occur on adjoining land as a result of this development.

REASON:  To prevent the proposed development having a detrimental effect on the developments existing on the adjoining lands.  Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

20.       Trees indicated on the submitted plans for removal, shall be removed from the site in accordance with the proposed development. Consent under Council’s Tree Preservation Order is not required for removal of the subject trees.

The approved works shall be executed so as to comply with the NSW Work Cover Code of Practice - amenity tree industry 1998 No. 034.

Any works associated with tree removal shall be carried out in Accordance with Australian Standards - AS 4373-2007, Pruning of Amenity Trees.

All tree stumps shall be removed below ground level and the surface area reinstated to prevent potential injury. 

All waste material from the subject tree/s shall be removed from site in conjunction with clearing.

REASON:  Because it is considered that the subject trees are prejudicial the successful implementation of the development.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

21.       A Compliance Certificate for the plumbing and drainage work identified in Column 1 at the times specified in Column 2 must be obtained from Council.

COLUMN 1

COLUMN 2

Internal Sewer Drainage

When all internal plumbing and drainage work is installed and prior to concealment.

External Sewer Drainage

When all external plumbing and drainage work is installed and prior to concealment.

Stormwater Drainage

When all external stormwater drainage work is installed and prior to concealment.

Stack Work

When all work is installed and prior to concealment.

Final

Prior to occupation of the building or structure.

REASON:  It is in the public interest that plumbing work is certifying as complying with AS/NZS 3500.2003 and Plumbing Code of Australia.

 

22.       All building work must be carried out in accordance with the requirements of the Building Code of Australia (as in force on the date the application for the relevant Construction Certificate or Complying Development Certificate was made).

REASON:  To ensure the development complies with the requirements imposed under Clause 98 of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A(11) of the Environmental Planning and Assessment Act 1979, as amended.

 

23.       If Council is appointed as the Principal Certifying Authority the applicant must obtain a Compliance Certificate, pursuant to Section 109C of the Environmental Planning and Assessment Act 1979, as amended, from Council or an accredited certifying authority, certifying compliance with the Building Code of Australia and the Swimming Pool Act 1992, for the stages of construction listed in Column 1. For the purposes of obtaining the Compliance Certificate the works must be inspected by the accredited certifying authority at the times specified in Column 2.

 

COLUMN 1

COLUMN 2

A

Footings/ Coping

When the pool is in position and all reinforcement has been placed in position.

B

Fencing

When the pool and all fencing, gates and locks have been completed and prior to water being placed in the pool.

NOTE 1:        A final Occupation Certificate in relation to the work cannot be issued by Council or an accredited certifying authority until all Compliance Certificates required by this condition have been issued or registered with Council.

NOTE 2:        The above Compliance Certificates are required whether or not the work has been inspected by a Structural Engineer, a lending authority or any other person. If the Compliance Certificates are not issued Council may refuse to issue a Building Certificate under Section 149A and D of the Environmental Planning and Assessment Act 1979, as amended.

REASON:  It is in the public interest that Compliance Certificates be issued for these components of the development.  Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

24.       All work is to comply with the Building Code of Australia, the Swimming Pools Act 1992 and Swimming Pools Regulations 2008. In this regard the following minimum requirements will apply:

a)         a minimum 1.2 metre high child resistant barrier is to be provided to enclose the swimming pool,

b)        gate/s leading into the pool area is to be fitted with an outward opening, self closing and latching gate,

c)         pool latches are to be located 1.5 metres high above the ground level,

d)        a resuscitation poster is to be affixed within the pool area.

NOTE:    Prior to the issue of an occupation certificate, the owner of the property shall supply Council with documentary evidence that the completed swimming pool has been registered at www.swimmingpoolregister.nsw.gov.au as required by the amended Swimming Pool Act.

REASON:  It is in the public interest that the provisions of the Building Code of Australia and the Swimming Pool Act 1992 be complied with.  Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

25.       In sewered areas, the swimming pool backwash pipe must be connected to the house sewer drainage system in accordance with Clause 10.9 and Figure 10.2 of AS/NZS 3500.2.2003 Sanitary Plumbing and Sanitary Drainage.  This connection can be via a suitable existing gully or, alternatively, a gully can be cut into the house drainage line for this purpose.

If alterations to the existing house drainage lines are required, a Compliance Certificate must be obtained pursuant to Section 109C of the Environmental Planning and Assessment Act 1979 from Council or an accredited certifying authority at the stages of construction listed in Column 1 certifying compliance with AS/NZS 3500.2003. For the purpose of obtaining the Compliance Certificate the works must be inspected by Council or an accredited certifying authority at the times specified in Column 2.

 

COLUMN 1

COLUMN 2

A

External Drainage Alterations

When all external plumbing work is installed and prior to concealment.

B

Final

At the completion of the installation of the pool.

REASON:  To ensure that backwash water is discharged into Council Sewerage system in accordance with AS/NZS 3500.2003 and because it is in the public interest to do so.  Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

Prior to release of Occupation Certificate / Prior to Operation

26.       An Occupation Certificate, must be obtained pursuant to Section 109C of the Environmental Planning and Assessment Act 1979, from either Council or an accredited certifying authority, prior to occupation of the building.

In order to obtain this, the “Final Occupation Certificate” form must be completed and submitted to Council with all required attachments - failure to submit the completed Occupation Certificate Application form will result in an inability for Council to book and subsequently undertake Occupation Certificate inspection.

NOTE:           The issuing of an Occupation Certificate does not necessarily indicate that all conditions of development consent have been complied with. The applicant is responsible for ensuring that all conditions of development consent are complied with.

REASON:  It is in the public interest that an Occupation Certificate be issued prior to occupation of the building. Section 79C (1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

27.       A final inspection must be carried out upon completion of plumbing and drainage work and prior to occupation of the development, prior to the issuing of a final plumbing certificate Council must be in possession of Notice of Works, Certificate of Compliance and Works as Executed Diagrams for the works. The works as Executed Diagram must be submitted in electronic format in either AutoCAD or PDF file in accordance with Council requirements.

All plumbing and drainage work must be carried out by a licensed plumber and drainer and to the requirements of the Plumbing and Drainage Act 2011.

NOTE:           Additional fees for inspections at the Plumbing Interim Occupancy / Plumbing Occupation stage may apply.  This will depend on the number of inspections completed at this stage of the work/s.

REASON: To ensure compliance with the relevant provisions of the Plumbing and Drainage Act 2011 and Regulations.

 

28.       Prior to the issue of an Occupation Certificate a Water Plumbing Certificate from Riverina Water County Council shall be submitted to Council.

NOTE 1:        The applicant is to obtain a Plumbing Permit from Riverina Water County Council before any water supply/plumbing works commence and a Compliance Certificate upon completion of the works. Contact Riverina Water County Council’s Plumbing Inspector on 6922 0618. Please be prepared to quote your Construction Certificate number.

REASON: To ensure that the water servicing requirements of the development have been approved by the relevant authority. Section 79C (1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

29.       The commitments listed in any relevant BASIX Certificate for this development must be fulfilled in accordance with the BASIX Certificate Report, Development Consent and the approved plans and specifications.

REASON:  To ensure the development complies with the requirements imposed under Clause 97A of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A (11) of the Environmental Planning and Assessment Act 1979, as amended.

 

General

30.       All exterior lighting associated with the development must be designed and installed so that no obtrusive light will be cast onto any adjoining property.

NOTE:           Compliance with Australian Standard AS4282.1997 “Control of the Obtrusive Effects of Outdoor Lighting” will satisfy this condition.

REASON:  To prevent the proposed development having a detrimental effect on the developments existing on adjoining land. Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

31.       (1)  For the purposes of Section 80A (11) of  the Environmental Planning and Assessment Act 1979, it is a prescribed condition of the development consent that if the development involves an excavation that extends below the level of the base of the footings of a building on adjoining land, the person having the benefit of the development consent must, at the person’s own expense:

(a)       protect and support the adjoining premises from possible damage from the excavation, and

(b)       where necessary, underpin the adjoining premises to prevent any such damage.

(2)       The condition referred to in subclause (1) does not apply if the person having the benefit of the development consent owns the adjoining land or the owner of the adjoining land has given consent in writing to that condition not applying.

REASON: To ensure the development complies with the requirements imposed under Clause 98E of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A (11) of the Environmental Planning and Assessment Act 1979, as amended.

 

32.       All backwash water or water discharged from the pool during emptying must be discharged into Council’s sewer in accordance with the requirements of AS/NZS 3500 and the Plumbing Code of Australia. Under no circumstances must water be discharged to the street.

NOTE:            Discharge from Pools in unsewered areas will be in a method approved by Council.

REASON: To ensure that all swimming pool backwash and water discharged is dealt with in an appropriate fashion. Section 79C (1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

33.       The proposed filter and pump must be operated in accordance with the Protection of the Environment Operations (Noise Control) Regulation 2008 which restricts the times of operation.  Restrictions apply between 8.00 pm and 7.00 am on weekdays and Saturdays and 8.00 pm to 8.00 am on Sundays and public holidays.

NOTE 1:        The swimming pool water, together with the treatment processes and facilities must comply with the requirements of the Public Health Act 2010 and Public Health Regulation 2012.

In this regards -

•     pH needs to be between 7.2 and 7.8

•     Alkalinity needs to be between 80mg/L and 200mg/L

•     Free chlorine needs to be between 3mg/L and 10mg/L

•     Combined chlorine needs to be less than 1mg/L

•     Cyanuric acid (if used) must be between 30mg/L and 100mg/L

NOTE 2:        For all pools in “septic areas”, the applicant must ensure that water discharged from the pool does not enter the septic tank or adversely impact on the septic disposal area or enter a drainage line.

REASON:  To ensure the development does not reduce the amenity of the area.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                                          RP-2

 




















Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                           RP-2

 







Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                              RP-2

 




Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                       RP-3

 

RP-3                             DA16/0364 - SHOP TOP HOUSING 2 BEDROOM DWELLING

Author:                        Koop, Bryce

Sector Manager:       Somerville, Paul

         

Analysis:

The report is for a development application and is presented to Council for decision. The application has been referred to Council for determination as the application seeks to one numeric controls of the Wagga Wagga Development Control Plan 2010 (DCP) by greater than 10%.

 

 

Recommendation

That Council approve DA16/0364 for Shop Top Housing development at 80 Fitzmaurice Street Wagga Wagga NSW 2650, subject to conditions outlined in the Section 79C Assessment Report for DA16/0364.

 

 

Development Application Details

 

Applicant

Mr Elias Konstas

Owner

Elias & Georgina Konstas

Development Cost

$10,000

Development Description

Change of use of Office Premises to Shop Top Housing at first floor level. Works will involve internal alteration and additions to construct a 2 bedroom first floor dwelling, totalling 87.29sqm.

 

Key Reasons

Key Issues

·    No private open space

·    Acoustic privacy, through the introduction of sensitive receiver in close proximity to Romano’s Hotel.

·    No external drying area or mailbox located on site.

 

The use of first upper level tenancies for Shop Top Housing developments is common within this area. Approval of this development is generally consistent with the objectives for the B3 zone and would not set an unwanted precedent within the city centre. Any similar developments would require a development application (DA). Those DA’s would be subject to the same scrutiny, assessment and notification as this development and would be assessed on their merits including consideration of the impacts on the streetscape and surrounding developments and consideration of any submissions received.

 

The application was notified in accordance with the provisions of Section 1.10 of the DCP. No submissions were received during notification.

Assessment

 

Criteria for the Development Application Report

 

Determination Body Reason:

 

In accordance with Clause 1.11 “Complying with the Wagga Wagga Development Control Plan 2010” of the Wagga Wagga Development Control Plan 2010 the application has been referred to Council for determination:

 

·        as one numeric control is varied by greater than 10% in relation to this proposal.

·        as adequate justification is provided by the applicant for the number of controls being varied in relation to this proposal.

 

Control C4 requires shop top housing without private open space access at ground level, to have a balcony with a minimum of 8m2 and minimum dimension of 2m that is directly accessible from the main living area. The development does not provide a balcony of this size or any private open space.

 

The applicant is seeking a variation of greater than 10% of the minimum private open space required which cannot be determined under delegation by Council Staff. The applicant has provided reasonable justification and has shown the development is generally consistent with the objectives of the B3 Commercial Core Zone, Heritage Conservation area and Objectives of Section 9.3.5 as summarised below:

 

·     The proposed shop top housing development has been designed to be consistent with surrounding developments, both in scale and function, retaining compatibility with the site context.

·     Appropriate solar access to the eastern elevation with a large door opening with Juliet style balcony gives the impression of passive private open space.

·     Retaining attractive streetscapes, consistent with the area, is important in the conservation area and when in close proximity to heritage items.

 

The development generally complies with all other controls not relating to private open space and where necessary impacts such as noise mitigation measures will be controlled via conditions. Considering this and the above justification it is recommended the application be supported because assessment has shown that exclusion of private open space is appropriate for this development site because reasonable amenity is achieved within the dwelling and there are no likely adverse impacts from this development occurring.

 

Reasons for Approval

The applicant has provided reasonable justification for the proposed development and no submissions were received during the notification period.

 

The development complies with the objectives of the LEP and DCP as outlined in the Section 79C Assessment Report.

 

This particular development is recommended for approval because it has merit and is acceptable development for the lot.

 

 

The total area of development on the lot is acceptable and should be supported because:

 

·    Adaptive reuse of upper floor levels is seen as important to maintain a strong CBD area.

·    There are minimal impacts to the locality subject to appropriate acoustic design;

·    The development is generally consistent with the objectives for the B3 Commercial Core Zone;

·    The close proximity of the site to the CBD encourages greater patronage within the CBD; and

 

The shop top housing development is acceptable in the location at the first floor level of an existing building, which has historically been used for commercial uses.

 

Site Location

The site is legally identified as Lot 1 DP 89930 and known as Unit 6, 80 Fitzmaurice Street, Wagga Wagga. The subject site is located on the western side of Fitzmaurice Street, approximately 40 metres to the south of the intersection with Gurwood Street, directly opposite the western end of Sturt Street. A section of the building also fronts Gurwood Street. The site is located within the conservation area.

 

The subject site falls within the Wagga Wagga Central Business District. The site consists of a 2 level building with individual tenancies at each level. At ground floor level the block of properties consists of business and office premises. Uses within the area are of a similar nature and also include a pub (Romano’s Hotel) with late night trading and a number of heritage listed items. The site is 100% developed and doesn’t contain any vehicle parking areas.

 

Financial Implications

N/A

Policy

Wagga Wagga Local Environmental Plan 2010

Wagga Wagga Development Control Plan 2010

 

Link to Strategic Plan

4. We have a sustainable natural and built environment

4.2 We plan for resilient and sustainable built environments

 

Risk Management Issues for Council

Approval raises no risk management issue and will not create an undesirable precedent. Refusal of the application may result in an appeal process in the Land and Environment Court which will have to be defended by Council. The reasons for refusal will have to be justified and withstand scrutiny and cross examination in Court.

 

 

Internal / External Consultation

Standard internal Council referrals of the application occurred. The application is supported, subject to conditions.

 

Notification was conducted to properties surrounding the development between 24/11/2016 and 12/12/2016. The application was not required to be Advertised. No submissions were received during the notification period.

 

See the Section 79C Assessment report for full details of all consultation.

 

Attachments  

1.

DA16/0364 s79c Report

 

2.

DA16/0364 Plans

 

3.

DA16/0364 Statement of Environmental Effects

 

4.

DA16/0364 BASIX Certificate

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                 RP-3

 

 

ww_council

 

 

Report of Development Application

Pursuant to Section 79C of the Environmental Planning and Assessment Act 1979

 

APPLICATION DETAILS

Type of Application

Development Application

Application No.

DA16/0364

Modification No.

N/A

Council File No.

D/2016/0364

Date of Lodgement

22/06/2016

Applicant

E Konstas

80 Fitzmaurice St

WAGGA WAGGA  NSW  2650

Proposal

Shop Top Housing - 2 Bedroom Dwelling

Description of Modification

N/A

BCA Classification

4

Development Cost

$10000

Other Approvals

Nil

Concurrence Required

No

Referrals

Internal

Building, Plumbing & Environmental

 

External

Riverina Water

Determination Body

Wagga Wagga City Council

Reason

1.11 of the Wagga Wagga Development Control Plan - Variation by more than 10% (Section 9.3.5 C4)

 

Meeting Date

30 January 2017

Assessment Officer:

Bryce Koop


SITE DETAILS

Subject Land

80 Fitzmaurice St WAGGA WAGGA  NSW  2650

Lot 1 DP 89930

Owner

E Konstas & G Konstas

Owner’s Consent Provided

22/06/2016.

 

Location

On the western side of Fitzmaurice Street, approximately 40 metres to the east of the intersection with Gurwood Street.

 


STATUTORY CLASSIFICATION

Pursuant to Part 4 (Division 1)

Environmental Planning Instrument

Wagga Wagga Local Environmental Plan 2010

 

Zoning

Under the Wagga Wagga Local Environmental Plan, 2010 - B3 Commercial Core

 

Land Use Definition

Shop Top Housing

Statement of Permissibility

Permissible with consent

 

REPORT

Description of Development

The application is for the change of use of currently vacant premises, previously used as an Office Premises (tenancy 6) to Shop Top Housing, including ancillary building works.

The proposed works will involve internal alteration and additions to construct a 2 bedroom first floor dwelling, totalling 87.29sqm. Access to the property is at ground floor from Fitzmaurice Street.

Minor external works are proposed being the replacement of existing windows to the eastern elevation to allow for acoustic protection and addition of a door with Juliet style balcony opening.

 

The Site and Locality

The site is legally identified as Lot 1 DP 89930 and known as Unit 6, 80 Fitzmaurice Street, Wagga Wagga. The subject site is located on the western side of Fitzmaurice Street, approximately 40 metres to the south of the intersection with Gurwood Street, directly opposite the western end of Sturt Street. A section of the building also fronts Gurwood Street. The site is located within the conservation area.

 

The subject site falls within the Wagga Wagga Central Business District. The site consists of a 2 level building with individual tenancies at each level. At ground floor level the block of properties consists of business and office premises. Uses within the area are of a similar nature and also include a pub (Romano’s Hotel) with late night trading and a number of heritage listed items.

 

The site is 100% developed and doesn’t contain any vehicle parking areas.

 

An inspection of the premises was carried out on 28/07/2016.

 

Easements and Covenants

There are no known easements or covenants that will impact the proposed development.

 

Previous Development Consents

DA14/0413 - Office Premises

DA09/0678 - Subdivision

 

Summary of main issues:

   Variation of DCP Control 9.3.5 (C4) - Private Open Space

   Acoustic Privacy - Introduction of sensitive receiver in proximity to entertainment venue

   Site Facilities

 

MATTERS FOR CONSIDERATION PURSUANT TO SECTION 79C(1)

Section 79C(a)(i) - The provisions of any environmental planning instrument (EPI)

 

Wagga Wagga Local Environmental Plan 2010

 

Under the provisions of the WWLEP2010, the subject site is within the B3 Commercial Core zone.

 

The development is permissible with consent.

Matters listed under Part 1 have been noted and satisfied.

Part 2 Permitted or prohibited development

Under the provisions of the WWLEP, the subject site is within the B3 Commercial Core zone.  The objectives of this zone are:

   To provide a wide range of retail, business, office, entertainment, community and other suitable land uses that serve the needs of the local and wider community

   To encourage appropriate employment opportunities in accessible locations

   To maximise public transport patronage and encourage walking and cycling

   To ensure the maintenance and improvement of the historic, architectural and aesthetic character of the commercial core area.

 

Shop Top Housing is permitted with consent, being defined as; one or more dwellings located above ground floor retail premises or business premises.

The space at ground floor level is used for business premises.

 

The proposal is in proximity to existing commercial uses and late night trading premises. The proposal is generally inconsistent with the existing character of the area.

 

Objective 1 encourages a wide range of uses in the area to meet the demands of the public. The proposal is seen to meet the changing demands of the community and the adaptive reuse of a business premises is important to maintaining a strong commercial core.

Given the proximity to an existing entertainment venue (Romano’s Hotel), it is imperative that there is no adverse impact to future occupants or conflicts as a result of the introduction of a residential use. Appropriate acoustic design will ensure there is minimum disturbance to future occupants and that the entertainment venue uses can can continue to operate.

 

Objectives 2 & 3 are generally not related to the proposal, other than the encouragement of alternative means of transport, as no parking is provided on side.

 

The adaptive reuse of part of the building is seen to be consistent with the objective 4 as the works are seen to maintain and respect the heritage nature of the area including heritage items in close proximity.

 

Clause 5.10 Heritage conservation

The site is not heritage listed, however is within the heritage conservation area and within the proximity of a number of Heritage Items - I120 (Courthouse - Fitzmaurice Street) & I119 (Shops - Gurwood Street).

The development is considered to be compatible with the conservation area, as it generally involves internal alteration works. There are some minor changes externally to the windows and the addition of a Juliet style balcony to Fitzmaurice Street is consistent with adjoining development and the streetscape.

As a result of the proposal the streetscape will be enhanced and the surrounding area including heritage items will not be adversly impacted.

 

7.2   Flood planning

The subject site is located in Central Wagga and is protected by the levee.  At the 1:100 year flood level, Council’s flood modelling software shows that the site is inundated.  It is considered that the proposed development is compatible with the flood hazard of the land and will have minimal impact on flood behaviour.  See further discussion under the DCP section of the report, below.

 

7.6   Groundwater vulnerability

The objective of this clause is to protect and preserve groundwater sources.  This clause applies to land identified as “Groundwater” on the Water Resource Map.  The subject development is not development specified for the purposes of this clause therefore this clause does not apply.

 

State Environmental Planning Policies (SEPPs)    

State Environmental Planning Policy No 55-Remediation of Land applies to the land.  A consent authority must not consent to the carrying out of any development on land unless it has considered whether the land is contaminated.  As the land has been sealed historically, it is considered unlikely to be contaminated and further investigation is not warranted.  It is noted that the site is not on Council’s contaminated land register.

 

Section 79C(1)(a)(ii) - the provisions of any draft environmental planning instrument

No relevant planning instrument under this clause is currently the subject of public exhibition or comment.

 

Section 79C(1)(a)(iii) - The provisions of any development control plan

 

Wagga Wagga Development Control Plan 2010

The proposed development complies with the development standards of the Wagga Wagga Development Control Plan 2010 as follows:

 

Section 1 - General

 

1.10 Notification of a Development Application

In accordance with the Wagga Wagga DCP the application was notified to neighbouring properties between 24 November and 12 December 2016. No submissions were received during the notification period. The application was not required to be advertised.

 

1.11 Complying with the Wagga Wagga Development Control Plan 2010

The controls in the DCP support the Guiding Principles of the Plan and principles and objectives within the various sections. Except as varied elsewhere in this Plan, all Development Applications, Section 96 Applications and Section 82A Applications should aim to satisfy all stated objectives and controls.

Whilst all developments should aim to satisfy all controls within the DCP, it is acknowledged that there may be circumstances where it may not be possible to achieve strict compliance.

Council may consent to an application which departs from any control, whether a “numeric” or non-numeric control. In such cases, a written submission must be lodged with the Development Application.

Where an application involves the variation of one or more controls within the DCP Council staff have delegation to approve variations but limited to the following circumstances;

   Where any numeric control is not being varied by greater than 10%

 

The application proposes a variation to C4 of Section 9.3.5 of the DCP by greater than 10%. Council staff do not have delegation to approve such an application and it has therefore been referred to Council.

The applicant has submitted the required written justification for the variation and Council may consent to the proposal if deemed acceptable.

The issues surrounding the variation have been discussed throughout this report, particular attention is drawn to Section 9.3.5 of the DCP.

Section 2 - Controls that Apply to All Development 

 

2.1 Vehicle access and movements

The site is 100% covered by building and does not contain any vehicle access or movement areas. The proposed development will not impact on the vehicle access and movements of adjoining developments.

 

2.2 Off-street parking

There is no existing car parking located on the site as the site is 100% covered by the existing building.

 

C1 As per the table the dwelling is to provide 1 parking space per 2 bedrooms.

 

The proposal doesn't provide any parking. C6 below allows no increase in parking for this area of the CBD.

 

C6 In the case of redevelopment or change of use within the B3 zone where there is no increase in gross floor area, no additional spaces will be required.

 

There is no increase in the floor area of the building, therefore no parking is required to be provided.

 

This section of the DCP is satisfied and there is not expected to be any increased impacts to the traffic in the area.

 

2.3 Landscaping

There is no existing landscaping on the site. As the site is already 100% developed no landscaping is required to be provided.

 

2.5 Signage

There is no signage proposed as part of the current Development Application.

 

2.5 Safety and security

The subject property is secure as it is fully contained within the main building. The reuse of the upper floor introduces greater natural surveillance and activity within the building at all times for the benefit of all tenants. There are no safety or security concerns presented as a result of this development.

 

2.6 Erosion and Sediment Control Principles

There are works proposed to the footings or any works that would disturb soil.

 

2.7 Development adjoining open space

The development does not adjoin open space. All works will be contained within the existing building.

 

Section 3 - Heritage Conservation

3.2.4 Development in the vicinity of a heritage item

The site is adjacent to Item 119 (Shops) at Gurwood Street & Item 120 (Courthouse) at Fitzmaurice Street. Tenancy 6 fronts Fitzmaurice Street only, with the Gurwood Street frontage making up other tenancies and will remain unaltered.

 

C2 Development in the vicinity of a heritage item is to minimise the impact on the setting of the item by:

a) Providing an adequate area around the heritage item to allow its interpretation.

b) Retaining original or significant landscaping associated with the heritage item.

c) Protecting and allowing the interpretation of archaeological features associated with the heritage item.

d) Retaining and respecting significant views to and from the heritage item.

 

The proposal is unlikely to have any impact on the existing heritage items in the area, as the works remain consistent with the character of the area and are not seen to be overbearing.

 

Clause 3.3.1 contains provisions relating to the Fitzmaurice Street commercial precinct. The proposal is generally responsive to the objectives for this section.

 

Colour schemes

C1 Colour schemes are to reflect the period and detail of the building, particularly where a building is identified as a streetscape reference building or contributes to the character of the conservation area.

 

There is no external change proposed to the colour of the existing façade. There is expected to be no impact on the heritage character of the area as a result of the proposal.

 

Section 4 - Environmental Hazards and Management 

Clause 4.2 Flooding 

The objectives of this section are to minimise the public and private costs of flood damage, minimise the risk of life during floods, ensure compatibility with the Flood Plain Development Manual and ensure that development and construction are compatible with the flood hazard.

The site is located within the CBD protected by a levee bank around the Murrumbidgee River. The proposal is not expected to impact on flood risk or behaviour, being a change of use at first floor level with no increase in floor area. 

 

Section 5 - Natural Resource and Landscape Management 

5.4 Environmentally sensitive land

According to Council's mapping the subject allotment is identified as a “sensitive area” for groundwater vulnerability. The proposed works include internal alterations and additions to the existing commercial building. These works will not adversely impact groundwater and are not listed as prescribed uses for the purposes of the clause.

 

Section 9 - Residential Development  

The proposal is for shop top housing in the CBD area.

 

Whilst the site is located within the business zone (B3), the proposed use is residential and therefore is required to comply with this section of the DCP.

 

The proposed change of use of a business premises to shop top housing will involve minimal building works, the applicant has appropriately designed the internal layout to give the main living area the maximum amount of natural daylight possible from windows at the eastern elevation being Fitzmaurice Street.

 

9.2 Site context and layout

C3 Orient living spaces to maximise solar access.

C4 Facilitate natural cross ventilation within dwellings through the location of windows and doors.

 

The proposal is seen to be generally consistent with the above control. The adaptive reuse of a building within the conservation area generally restricts the amount of external works that can be completed, however there are windows on either side of the tenancy (East/West) which allows for cross ventilation and appropriate solar access to the eastern elevation.

 

9.2.2 Streetscape

C1 Provide a street address and front elevation that is consistent with the predominant scale, rhythm and form of the street.

 

There is minimal impact to the streetscape, with merely the addition of a Juliet style balcony to Fitzmaurice Street and minor changes to window glazing. No concerns are raised under this section.

 

9.3.4 Solar access

C3 For single dwellings, dual occupancies, secondary dwellings & shop top housing the windows to the main internal living area and at least half the private open space are to receive a minimum 3 hours direct sunlight between 9am and 3pm in mid-winter (June 22).

 

The living area windows located at the eastern elevation, are likely to receive the required amount of sunlight during the necessary times. The proposal does not provide any private open space as required in section 9.3.5 below.

 

9.3.5 Private open space

O1 Provide quality, useable private open space.

O2 Ensure adequate areas for recreation and outdoor living.

O3 Encourage good connection between dwellings and private open space.

 

The following control for private open space requirements is relevant:

 

C4       For residential flat developments and shop top housing, each unit without direct access to ground level must have a balcony with a minimum area of 8m2, and minimum dimension of 2m that is directly accessible from the main living area

 

Whilst the proposed shop top housing has direct access to the ground level (Fitzmaurice Street) it is directly to the street and not to any secure private open space. No other areas on the site have been proposed for alternate private open space. As a result the proposal does not comply with this control and constitutes a greater than 10% variation of this numerical control and therefore will need to have a determination made at a meeting of Council.

 

The applicant has provided the following justification in accordance with the requirements of section 1.11;

 

The introduction of an inwards opening “French” door to the eastern elevation with a Juliet style balcony directly to the living area increases solar access. It also introduces an element that is consistent with the ambience of private open space.

 

The variation of this control is considered acceptable on a merit based assessment as the proposal is generally seen to not be inconsistent with the objectives of the section, being that there is some appreciation of private open space expected by a door opening directly to the living area at the eastern elevation

 

The proposal is also seen to comply with solar access controls and given the site is 100% developed that it is not possible to provide adequate private open space.

 

9.4.3 Privacy

Objectives:

O1 Ensure privacy within new developments, and avoid potential impacts to existing properties.

O2 Ensure adequate acoustic privacy within dwellings.

 

The proposal is in close proximity to an existing entertainment venue and has the potential to impact on the operation if appropriate acoustic design and materials are not applied. Noise may pass through the windows if they are not to a standard or level consistent with the noise being generated. This will then impact on the future occupants and may lead to noise complaints and conflicts between the uses.

 

The applicant has identified that the eastern facing windows which are directly adjacent to the pub will be replaced with double glazed, aluminium windows which will mitigate any disturbance to the residence. A report from the window manufacturer completed by Australian Hearing has been provided, to state the acoustic properties of the design in support of the application with a pretection level of 25dBA. No noise level monitoring has been carried out to show that the proposed works would mitigate late night noise to this level.

 

The proposal is seen to have addressed the objectives of the section and met the required control to a certain degree. Concerns are still raised given the potential for ongoing issues by the introduction of a sensitive receiver within such close distance to the entertainment venue, without having acoustic testing completed. The applicant is required to provide an acoustic report detailing that the design of window is appropriate for shop top housing on the subject site. This will ensure that the likelihood of impacts between the uses will be managed and not conflict with each other allowing them to co-exist creating a stronger commercial core.

 

9.4.5 Site facilities

Integrating these facilities into the overall design of a development improves site function and appearance.

 

C3 Locate mail boxes so that they are clearly visible from the street or main entry. The plans are to include details of the location for letter boxes and any associated shelter structure.

 

No mailbox will be provided on site with the applicant electing for a local post office box. No concerns are raised with this given the scale of development.

 

C4 Garbage areas are to be easily accessible within the site, and are to have adequate lighting. The area should be visually screened from adjoining developments and public spaces.

 

Garage collection will be carried out from a central location within the building. No concerns are raised with this.

 

C5 Provide an external drying area in an area that receives reasonable solar access. The drying area is to be screened from the street or adjoining public spaces.

 

The site has no external areas therefore this is not possible. The applicant has stated that there is ample area internally for hanging of cloths and that a machine dryer will be provided. No concerns are raised given the layout of the existing building.

No other controls in this section are relevant to change of use to shop top housing within the business zone.

 

Section 10 - Business Development

The proposal is for shop top housing in the CBD. The controls within section 10 generally relate to new build developments and impacts on the streetscape. The proposed change of use to shop top housing within the business zone raises no issues under this section of the DCP.

 

Section 79C(1)(a)(iiia) - Planning Agreements

 

There is no draft or current planning agreement applicable to this application under Section 93F of the Environmental Planning and Assessment Act 1979.

 

Section 79C(1)(a)(iv) - any matters prescribed by the regulations

 

There are no applicable matters prescribed by the regulations.

 

Section 79C(1)(b) - likely impacts of the development

 

Section 733 of the Local Government Act 1993                                                                                   

 

Section 733 of the Local Government Act 1993 provides that Councils will not incur liability for decisions or omissions concerning flood liable land or land subject to the risk of bushfire. Where required, a risk assessment has been completed and Council will be able to demonstrate that it has acted appropriately in its decision making when defending claims in liability or in circumstances where administrative decisions are challenged.

 

Flooding Risk Assessment

 

The development has been considered against the relevant provisions of the WWLEP2010 and DCP2010. A risk assessment is not required as the development whilst being mapped being Flood Prone Land within the CBD levee, is located at the first floor level of an existing building. No concerns are raised under this section.

 

Bush Fire Risk Assessment

 

The development has been considered against the relevant provisions of the WWLEP2010 and DCP. A risk assessment is not required as the development is not mapped as being on Bushfire Prone Land. 

 

Section 79C(1)(b) - likely impacts of that development

 

Satisfactory

Not Satisfactory

Not Relevant

Comment

Context & Setting

x

 

 

The subject site is within the commercial core surrounded by a mix of business, retail, entertainment and residential premises. The shop-top housing will generally fit within the existing context and setting without significant impact which is seen to be appropriate for the future strength of the CBD. 

Streetscape

x

 

 

Minor changes at first floor level are seen to be consistent with the character of the area.

Traffic, access and parking

x

 

 

No existing parking is provided on site as the site is 100% covered by building. There will be a reduction in car parking demand due to the change of use to a less intense user. No concerns are raised with impacts on the local traffic network.

Public Domain

x

 

 

Existing pavement area to front of building is not affected by the development.

Utilities

x

 

 

The site is fully serviced.

Heritage

X

 

 

The site is not listed, however is within the conservation area and proximity to a number of heritage items. Due to the scale of works, the adaptive reuse of part of the building at first floor level is not likely to cause any heritage impacts.

Other land Resources

 

 

x

n/a

Water Quality & Stormwater

x

 

 

There are no likely impacts to water quality and stormwater.

Soils, soil erosion

 

 

x

No ground works.

Air and microclimate

x

 

 

There are no likely impacts on air and microclimate.

Flora and Fauna Trees

 

 

x

No impacts

Waste

 

 

x

n/a

Energy

x

 

 

Improved as windows are upgraded and natural light and ventilation are introduced.

Noise & vibration

x

 

 

Concern is raised given the location of the proposal in proximity to an existing entertainment facility (pub) with late night trading, as it introduces a new sensitive land receiver opposite to the pub (closer than other existing residential development). The applicant has elected to replace the existing windows at the eastern elevation which are adjacent to the venue, with windows of greater acoustic properties. Manufacture's details and a report on the windows properties has been provided, however no testing has been carried out to conclude that existing noise levels would be offset. It is considered imperative for the ongoing operation of the existing entertainment venue that acoustic testing is carried out, to ensure that the acoustic properties of the windows are at an acceptable level. This will allow for both uses to operate harmoniously together.

Hours of operation

 

 

x

n/a

Natural hazards  - Flooding  - Bushfire Prone

x

 

 

The proposal is within an existing building at first floor level. Whilst the site is in the flood area, it is protected by the main city levee. The site is not bushfire prone.

Technological Hazards

 

 

x

n/a

Safety, security and crime prevention

x

 

 

Improved security as premises occupied outside of core commercial operating hours. No detrimental impacts.

Social impact in locality

x

 

 

Positive as variety of housing choices in the CBD is increased.

Economic Impact in Locality

x

 

 

Positive impact through continued investment in the city and adaptive reuse of buildings.

Site design and internal design

x

 

 

No changes to site layout, minor internal alterations to accommodate open plan dwelling arrangement.

Overlooking - overshadowing

 

 

x

n/a

Landscaping

 

 

x

Internal works only

Construction

x

 

 

Standard hours of work will apply and be secured by condition

Private open space

 

 

x

n/a

Cumulative Impacts

x

 

 

Potential for increased number of similar developments within the CBD will result in the adaptive reuse of vacant upper floor levels.

Disabled access

 

 

x

Existing premises, no requirement to upgrade.

Signage

x

 

 

No signs are included with this application.

Setbacks, Building Envelopes

 

 

x

No changes to the building are proposed

 

Section 79C(c) - the suitability of the site for the development

 

The subject site is within the commercial core area and consists of a part single, part two storey building with ground floor commercial premises and upper floor tenancies. The shop-top housing is permissible in the zone and a good use of first floor areas within the business zone. Whilst not common in Wagga there are other examples and the development would not be out of character in terms of context and setting. The proposal is entirely suitable in this locality and an appropriate use of the floor area.

 

There are no associated adverse impacts as a result of the development.

 

Section 79C(d) - any submissions made in accordance with the Act or the regulation

 

Referrals

The application was referred to relevant internal referral groups.

 

Notification

In accordance with the DCP provisions the application was notified to neighbouring properties for a period of 14 days.

 

Advertising

In accordance with the DCP provisions the application was not required to be advertised.

 

Public Submissions and those from public authorities

 

No submissions were received during the 14 day notification period.

 

Section 79C(e) - the public interest

 

The public interest is best served by the consistent application of the requirements of the relevant planning controls and by Council ensuring that any adverse effects on the surrounding area and the environment are avoided. The proposed development will have no detrimental impacts and will enable the full utilisation of the floor area affected.

 

Other Legislative Requirements

Section 5A ("Seven Part Test" - Threatened Species)

The following factors must be taken into account in making a determination under this section:

(a)  in the case of a threatened species, whether the action proposed is likely to have an adverse effect on the life cycle of the species such that a viable local population of the species is likely to be placed at risk of extinction,

(b)  in the case of an endangered population, whether the action proposed is likely to have an adverse effect on the life cycle of the species that constitutes the endangered population such that a viable local population of the species is likely to be placed at risk of extinction,

(c)  in the case of an endangered ecological community or critically endangered ecological community, whether the action proposed:

(i)  is likely to have an adverse effect on the extent of the ecological community such that its local occurrence is likely to be placed at risk of extinction, or

(ii)  is likely to substantially and adversely modify the composition of the ecological community such that its local occurrence is likely to be placed at risk of extinction,

(d)  in relation to the habitat of a threatened species, population or ecological community:

(i)  the extent to which habitat is likely to be removed or modified as a result of the action proposed, and

(ii)  whether an area of habitat is likely to become fragmented or isolated from other areas of habitat as a result of the proposed action, and

(iii)  the importance of the habitat to be removed, modified, fragmented or isolated to the long-term survival of the species, population or ecological community in the locality,

(e)  whether the action proposed is likely to have an adverse effect on critical habitat (either directly or indirectly),

(f)  whether the action proposed is consistent with the objectives or actions of a recovery plan or threat abatement plan,

(g)  whether the action proposed constitutes or is part of a key threatening process or is likely to result in the operation of, or increase the impact of, a key threatening process.

The proposed change of use for shop top housing development is on a site that is void of vegetation; no threatened species have been identified on the site. No further assessment is required under this section.

Section 79B(3)

As mentioned above there is unlikely to be significant impact and a species impact statement is not required. Therefore concurrence is not required from the Director General of National Parks and Wildlife.

 

Development Contributions - Section 94/94A & Section 64 Local Government Act, 1993 and Section 306 Water Management Act, 2000

 

Section 94/94A of the Environmental Planning and Assessment Act 1979 and the City of Wagga Wagga’s Section 94 Contributions Plan 2006-2019 enables Council to levy contributions, where anticipated development will or is likely to increase the demand for public facilities. A Section 94A contribution will apply to this development that will be put towards the provision of high quality and diverse public facilities to meet the expectations of the residents of the city.

 

The proposed development has an estimated cost of works of that is less than $100,000 therefore there is no applicable s94A charge.

 

Section 64 of the Local Government Act 1993, Section 306 of the Water Management Act 2000 as well as the City of Wagga Wagga’s Development Servicing Plan for Stormwater 2007 and/or City of Wagga Wagga Development Servicing Plan for Sewerage 2013 enable Council to levy developer charges based on the increased demands that new development will have on sewer and/or stormwater.

 

There is no increase in the area of hardstand on site. No Section 64 (stormwater) contribution is required for the works.

 

There will be no sewer contributions payable as the dwelling rate will not exceed the previous office use.

 

REFERRALS:

Building Surveyor:- No objections, recommended conditions of consent.

Plumbing Inspector: - No objections, recommended conditions of consent.

Subdivision Engineer:- Referral not required.

Environmental Officer: - No objections, no recommended conditions of consent.

Parks & Recreation Officer:- Referral not required.

Riverina Water - No objections, recommended conditions of consent.

 

Other Approvals:

No further approvals are required.

 

CONCLUSION:

This assessment has given consideration to the matters listed where relevant. This assessment was undertaken in accordance with section 79C of the Environmental Planning and Assessment Act 1979.

 

This particular development is recommended for approval because it has merit and is an acceptable development for the adaptive reuse of the building at first floor level as discussed within this report subject to compliance with conditions.

 


RECOMMENDATION

It is recommended that DA16/0364 for Shop Top Housing – 2 bedroom dwelling at first floor level be approved, subject to the following conditions:-


CONDITIONS

Approved Plans and Documentation

1.         The development must be carried out in accordance with the approved plans and specifications as follows.

Plan/Doc No.

Plan/Doc Title

Prepared by

Issue

Date

1602 - 1001

New Class 4 Residence at first floor level - Site, Block Plans & Elevations

Mark G. Golden & Associates

DA 01

12/01/ 2017

1602 - 1002

New Class 4 Residence at first floor level - Floor Plans & Section

Mark G. Golden & Associates

DA 01

20/06/ 2017

1602 - 1003

New Class 4 Residence at first floor level - First Floor Plan

Mark G. Golden & Associates

DA 01

12/01/ 2017

 

Statement of Environmental Effects/ Heritage Impact Statement

Mark G. Golden & Associates

DA 01

20/06/ 2016

726678S

BASIX Certificate

Mark G. Golden & Associates

 

12/01/ 2017

The Development Application has been determined by the granting of consent subject to and as amended by the conditions of development consent specified below.

NOTE:           Any modifications to the proposal shall be the subject of an application under Section 96 of the Environmental Planning and Assessment Act, 1979.

REASON:  It is in the public interest that work is carried out in accordance with the approved plans. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

Prior to release of Construction Certificate

2.         Prior to the issue of a Construction Certificate details of all structural concrete and structural steelwork shall be submitted to the Principal Certifying Authority for approval, all such details shall be certified by a practising Structural Engineer.

REASON:  It is in the public interest that all building elements are able to withstand the combination of loads and other actions to which it may be subjected.  Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

3.         Prior to the release of the Construction Certificate an acoustic report shall be prepared and submitted to Council for approval by a suitably qualified business or person that analyses the likely impacts of late night noise and/or vibration impacts from the pub on the future shop top housing use. The report must include required mitigation measures appropriate to minimise the likelihood of noise complaints against the existing businesses within the immediate area.

 

NOTE: The findings of the report will assist in determining whether the measures proposed are appropriate and or need to be upgraded further.

REASON: To ensure proposed development does not have adverse effects on the amenity of the existing area and to ensure the residence is appropriately protected. Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

Prior to Commencement of Works

4.         If the work involved in the erection or demolition of a building or structure:

a)         is likely to cause pedestrian or vehicular traffic in a public place to be obstructed or rendered inconvenient, or

b)        building involves the enclosure of a public place,

a hoarding or fence must be erected between the development site/works and the public place prior to works commencing on site.

All construction materials, waste, waste skips, machinery and contractors vehicles must be located and stored or parked within the site. No storage of materials, parking of construction machinery or contactor’s vehicles will be permitted within the public space.

If necessary, an awning must be erected, sufficient to prevent any substance, from or in connection with the work, falling into the public place. Further the work site must be kept lit between sunset and sunrise if it is likely to be hazardous to persons in the public place.

NOTE 1:        Any such hoarding, fence or awning must be removed when the work has been completed.

NOTE 2:        Any external lighting required by this condition must be designed and positioned so that, at no time, will any light be cast upon any adjoining property.

NOTE 3:        Prior to any hoarding being erected, the applicant must ensure that an application for a Hoarding Permit is submitted to and approved by Council.

REASON:  It is in the public interest that adequate safety measures are provided. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

5.         Prior to works commencing on site, toilet facilities must be provided, at or in the vicinity of the work site on which work involved in the erection or demolition of a building is being carried out, at the rate of one toilet for every 20 persons or part of 20 persons employed at the site. Each toilet provided must be:

a)         a standard flushing toilet connected to a public sewer, or

b)        if that is not practicable, an accredited sewage management facility approved by Council, or

c)         if that is not practicable, any other sewage management facility approved by Council.

NOTE 1:        The provision of toilet facilities in accordance with this condition must be completed before any other work is commenced and the toilet facility must not be removed without the prior written approval of Council.

NOTE 2:        “Vicinity” in this condition is defined to mean within 50 metres of the subject building site.

NOTE 3:        The toilet facilities are to comply with all WORK COVER NSW requirements.

REASON:  To provide adequate sanitary facilities during the construction phase.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

6.         A CONSTRUCTION CERTIFICATE pursuant to Section 109C of the Environmental Planning and Assessment Act 1979, as amended from either Council or an accredited certifying authority certifying that the proposed works are in accordance with the Building Code of Australia PRIOR to any works commencing.

NOTE 1:        No building, engineering, excavation work or food premises fitout must be carried out in relation to this development until the necessary Construction Certificate has been obtained.

NOTE 2:        YOU MUST NOT COMMENCE WORK UNTIL YOU HAVE RECEIVED THE CONSTRUCTION CERTIFICATE, even if you made an application for a Construction Certificate at the same time as you lodged this Development Application.

NOTE 3:        It is the responsibility of the applicant to ensure that the development complies with the provision of the Building Code of Australia in the case of building work and the applicable Council Engineering Standards in the case of subdivision works. This may entail alterations to the proposal so that it complies with these standards.

REASON:  To ensure the design of the proposed work may be assessed in detail before construction commences and because it is in the public interest that the development complies with the appropriate construction standards. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

7.         Prior to works commencing a container must be erected on site for the enclosure of all building rubbish and debris, including that which can be wind blown. The enclosure shall be approved by Council and be retained on site at all times prior to the disposal of rubbish at a licenced Waste Management Centre.

Materials and sheds or machinery to be used in association with the construction of the building must not be stored or stacked on Council’s footpath, nature strip, reserve or roadway.

NOTE 1:        No building rubbish or debris must be placed, or be permitted to be placed on any adjoining public reserve, footway, road or private land.

NOTE 2:        Weighbridge certificates, receipts or dockets that clearly identify where waste has been deposited must be retained. Documentation must include quantities and nature of the waste.  This documentation must be provided to Council prior to application for an Occupation Certificate for the development.

NOTE 3:        The suitable container for the storage of rubbish must be retained on site until an Occupation Certificate is issued for the development.

REASON:  To ensure that the building site and adjoining public places are maintained in a clean and tidy condition so as not to interfere with the amenity of the area. Section 79C (1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

 

8.         A Section 68 Approval must be obtained from Council prior to any sewer or stormwater work being carried out on the site.

The licensed plumber must submit to Council, at least two (2) days prior to the commencement of any plumbing and drainage works on site a “Notice of Works”.

NOTE:           A copy of the Notice of Works form can be found on Council’s website.

REASON: It is in the public interest that plumbing and drainage work is carried out with the relevant approvals required under the Local Government Act 1993 and the Plumbing Code of Australia. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

9.         Prior to works commencing, a sign must be erected in a prominent position on any work site on which work involved in the erection or demolition of a building is being carried out:

a)         stating that unauthorised entry to the site is prohibited, and

b)        showing the name of the person in charge of the work site and a telephone number at which that person may be contacted outside work hours

c)         the development consent or complying development consent number, the name and contact details of the Principal Certifying Authority.

Any sign must be removed when the work has been completed.

NOTE:           This condition does not apply to:

a)   building work carried out inside an existing building, or

b)  building work carried out on premises that must be occupied continuously (both during and outside work hours) while the work is being carried out.

REASON:  To ensure the development complies with the requirements imposed under Clause 98 of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A(11) of the Environmental Planning and Assessment Act 1979, as amended.

 

10.       At least two (2) days prior to the commencement of any works, the attached ‘Notice of Commencement of Building or Subdivision Works and Appointment of Principal Certifying Authority’, must be submitted to Council.

REASON:  Because it is in the public interest that Council receive notification in accordance with the provision of the Environmental Planning and Assessment Act 1979, as amended. Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

During works

11.       If the Council is appointed as the Principal Certifying Authority the following inspections must be undertaken by Council and a satisfactory Inspection Report must be issued by Council for such works prior to any further works being undertaken in respect of the subject development.  Inspection Stages for construction are listed in Column 1 and must be inspected by Council at the times specified in Column 2.

COLUMN 1

COLUMN 2

Bearers and joists

Prior to the laying of the floor.

Wall frame

When the frame has been erected and prior to sheeting and or brick veneer outer wall has been constructed and tied to the frame.

Wet areas

When waterproofing has been applied to all wet areas, prior to tiling or finishing of surface.

Final

Required prior to occupation of the building

NOTE 1:        A Final Occupation Certificate in relation to the building cannot be issued by Council until all Inspection Reports required by this condition have been issued by Council. Prior to or at the time of the application for Occupation Certificate the application for “Occupation Certificate” form attached to the Council issued Construction Certificate must be completed and submitted to Council with all required attachments - failure to submit the completed Occupation Certificate application form will result in an inability for Council to book and subsequently undertake occupation certificate inspection.

NOTE 2:        The above Inspection Reports are required whether or not the work has been inspected by a Structural Engineer, a lending authority or any other person. If the Inspection Reports are not issued Council may refuse to issue a Building Certificate under Section 149A of the Environmental Planning and Assessment Act 1979, as amended.

NOTE 3:        Submission of the bracing plan and the Truss and Frame Certificate is required seven (7) working days before the frame inspection.

REASON:  It is in the public interest that critical stage inspections be issued for these components of the development in accordance with Section 162A of the Environmental Planning and Assessment Regulations 2000 as amended.

 

12.       The Builder must at all times maintain, on the job, a legible copy of the plan and specification approved with the Construction Certificate.

REASON:  It is in the public interest that a copy of the Construction Certificate plans are available, and Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

13.       The permitted construction hours are Monday to Friday 7.00am to 6.00pm and Saturday 7.00am to 5.00pm, excepting public holidays. All reasonable steps must be taken to minimise dust generation during the demolition and/or construction process. Demolition and construction noise is to be managed in accordance with the Office of Environment and Heritage Guidelines.

REASON:  To ensure building works do not have adverse effects on the amenity of the area.  Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

14.       Should asbestos material be found during works, it is to be handled, transported and disposed of in accordance with the legislative requirements and standards determined by NSW WorkCover. All weighbridge receipts must be provided to Wagga Wagga City Council, within 14 days of the completion of the demolition/removal. 

 NOTE 1: All asbestos material needs to be double wrapped in 200μm thick plastic and disposed of at an EPA licensed facility. In this regard it should be noted that Wagga Wagga City Council's Gregadoo Waste Facility is the only EPA licensed facility within the Local Government Area to accept asbestos material. Council's Waste Management Supervisor requires 24 hours notice prior to disposal of this material

 

NOTE 2: Demolition works involving the removal and disposal of asbestos cement must only be undertaken by contractors who hold a current WorkCover ― Demolition Licence and a current WorkCover ― Class 2 (Restricted) Asbestos Licence.

 

NOTE 3: Competent Person (as defined under Safe Removal of Asbestos 2nd Edition [NOHSC: 2002 (2005)] means a person possessing adequate qualifications, such as suitable training and sufficient knowledge, experience and skill, for the safe performance of the specific work.

 

NOTE 4: A licence may be required for some of the tasks described in the document entitled Safe Removal of Asbestos 2nd Edition as requiring a competent person.

 

REASON: To minimize the risk to human and environmental health, Contaminated Land Management Act 1997 No 140 and Section 79C(1)(e) of the Environmental Planning and Assessment Act 1979, as amended. 

 

15.       A Compliance Certificate for the plumbing and drainage work identified in Column 1 at the times specified in Column 2 must be obtained from Council.

COLUMN 1

COLUMN 2

Internal Sewer Drainage

When all internal plumbing and drainage work is installed and prior to concealment.

External Sewer Drainage

When all external plumbing and drainage work is installed and prior to concealment.

Stormwater Drainage

When all external stormwater drainage work is installed and prior to concealment.

Stack Work

When all work is installed and prior to concealment.

Final

Prior to occupation of the building or structure.

REASON:  It is in the public interest that plumbing work is certifying as complying with AS/NZS 3500.2003 and Plumbing Code of Australia.

 

16.       All building work must be carried out in accordance with the requirements of the Building Code of Australia (as in force on the date the application for the relevant Construction Certificate or Complying Development Certificate was made).

REASON:  To ensure the development complies with the requirements imposed under Clause 98 of the Environmental Planning and Assessment Regulations 2000, as amended, and Section 80A(11) of the Environmental Planning and Assessment Act 1979, as amended.

 

Prior to release of Occupation Certificate

17.       Prior to the Occupation of the building the mitigation measures identified in the acoustic report under condition 3 are to be fully implemented.

REASON: To ensure proposed development does not have adverse effects on the amenity of the existing area and to ensure the residence is appropriately protected. Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

 

18.       An Occupation Certificate, must be obtained pursuant to Section 109C of the Environmental Planning and Assessment Act 1979, from either Council or an accredited certifying authority, prior to occupation of the building.

In order to obtain this, the “Final Occupation Certificate” form must be completed and submitted to Council with all required attachments - failure to submit the completed Occupation Certificate Application form will result in an inability for Council to book and subsequently undertake Occupation Certificate inspection.

NOTE:           The issuing of an Occupation Certificate does not necessarily indicate that all conditions of development consent have been complied with. The applicant is responsible for ensuring that all conditions of development consent are complied with.

REASON:  It is in the public interest that an Occupation Certificate be issued prior to occupation of the building. Section 79C (1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

19.       A final inspection must be carried out upon completion of plumbing and drainage work and prior to occupation of the development, prior to the issuing of a final plumbing certificate Council must be in possession of Notice of Works, Certificate of Compliance and Works as Executed Diagrams for the works. The works as Executed Diagram must be submitted in electronic format in either AutoCAD or PDF file in accordance with Council requirements.

All plumbing and drainage work must be carried out by a licensed plumber and drainer and to the requirements of the Plumbing and Drainage Act 2011.

NOTE:           Additional fees for inspections at the Plumbing Interim Occupancy / Plumbing Occupation stage may apply.  This will depend on the number of inspections completed at this stage of the work/s.

REASON: To ensure compliance with the relevant provisions of the Plumbing and Drainage Act 2011 and Regulations.

 

20.       Prior to the issue of an Occupation Certificate a Water Plumbing Certificate from Riverina Water County Council shall be submitted to Council.

NOTE 1:        The applicant is to obtain a Plumbing Permit from Riverina Water County Council before any water supply/plumbing works commence and a Compliance Certificate upon completion of the works. Contact Riverina Water County Council’s Plumbing Inspector on 6922 0618. Please be prepared to quote your Construction Certificate number.

REASON: To ensure that the water servicing requirements of the development have been approved by the relevant authority. Section 79C (1)(e) of the Environmental Planning and Assessment Act 1979, as amended.

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                                          RP-3

 




Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                           RP-3

 



Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                                          RP-3

 









Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                       RP-4

 

RP-4               ANNUAL DISCLOSURE OF PECUNIARY INTEREST RETURNS - NEW COUNCILLORS AND DESIGNATED STAFF

Author:                        Hensley, Ingrid

General Manager:    Eldridge, Alan

         

Analysis:

That Councillors and designated staff have completed an annual Disclosure of Pecuniary Interest Return as required by the Local Government Act 1993 (NSW) and Local Government (General) Regulation 2005.

 

 

Recommendation

That the Register of Disclosure of Interest Returns, as tabled at the meeting, and containing returns for newly elected Councillors and newly appointed staff who are Designated Persons, be received by Council.

 

Key Reasons

Each year, councillors and designated persons are required under Section 449 of the Local Government Act 1993 (“the Act”) to complete an annual Disclosure of Interest Return.

 

A Pecuniary Interest is described in Section 442 of the Act as: “an interest that a person has in a matter because of a reasonable likelihood or expectation of appreciable financial gain or loss to the person”.

 

Section 449 of the Act states that:

 

(1)     A councillor or designated person must complete and lodge with the general manager, within 3 months after becoming a councillor or designated person, a return in the form prescribed by the regulations.

(1A)  A person must not lodge a return that the person knows or ought reasonably to know is false or misleading in a material particular.

(2)     A person need not lodge a return within the 3-month period after becoming a councillor or designated person if the person lodged a return in that year or the previous year or if the person ceases to be a councillor or designated person within the 3-month period.

 

Division 2 of Part 8 of the Local Government (General) Regulation 2005 sets out the pecuniary interests to be disclosed in returns.

 

Section 450A of the Act further provides that:

 

(1)     The general manager must keep a register of returns required to be lodged with the general manager under section 449.

(2)     Returns required to be lodged with the general manager under section 449 must be tabled at a meeting of the council, being:

(a)     in the case of a return lodged in accordance with section 449 (1)-the first meeting held after the last day for lodgement under that subsection, or

(b)     in the case of a return lodged in accordance with section 449 (3)-the first meeting held after the last day for lodgement under that subsection, or

(c)     in the case of a return otherwise lodged with the general manager-the first meeting after lodgement.

 

Newly appointed Council staff who are considered under the Act as designated persons must complete a Disclosure of Interest Return within 3 months of the date of commencement of employment with Council. Similarly, newly elected Councillors must lodge Disclosure of Interest Returns within 3 months of being elected, that being 30 December 2016. Designated persons are defined under Section 441of the Act.

 

Accordingly, Council’s register is submitted to this meeting of Council in accordance with the Act. That register is available for inspection at the Council meeting of 30 January 2017, upon request, or at other times as set out under the Act and Regulation.

 

Financial Implications

N/A

Policy

N/A

 

Link to Strategic Plan

1. We are an engaged and involved community

1.1 We are a community that is informed and involved in decisions impacting us

 

Risk Management Issues for Council

Pecuniary interests and other matters to be disclosed in the return are prescribed by Part 8 of the Regulation. A councillor or designated person must not submit a return that they know or ought reasonably to know is false or misleading in a material particular. A councillor or designated person may correct or update the information contained in the register of returns by submitting a fresh return at any time.

 

Complaints made about contraventions of these requirements may be referred to the Civil and Administrative Tribunal. The information collected is kept by the general manager at the council chambers in a register of returns. Everyone is entitled to inspect the register of returns free of charge. 

Internal / External Consultation

Upon receipt of Disclosure of Interest Returns Councillors and designated persons are sent a Memorandum acknowledging receipt of that document and the date it was received.

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                       RP-5

 

RP-5               PROPOSED ESTABLISHMENT OF A DETENTION BASIN ON LOT 2 DP 702330 AT BOOROOMA

Author:                        Richardson, Craig

General Manager:    Eldridge, Alan

         

Analysis:

The developer of the Boorooma Charles Sturt Estate is seeking to construct a drainage detention basin on the Council owned site which is designated for an Emergency Services Precinct. This proposal is considered by staff and the various emergency services agencies to be complimentary to the proposed future development of Lot 2 DP 702330 as an Emergency Services Precinct. The developer will pay fair value compensation to Council of $40,000 for the use of Council’s land but is seeking a contribution from Council of $30,000 for the costs associated with constructing a detention basin with higher level specifications to meet the requirements of the emergency service agencies.

 

 

Recommendation

That Council:

a       agree to the establishment of a drainage detention basin on Lot 2 DP702330, Kingsford Smith Road at Boorooma

b       agree to accept compensation from the Catholic Diocese of Wagga Wagga as outlined in the body of this report

c        agree to contribute $30,000 to the developer of Boorooma Charles Sturt Estate representing the pro-rata portion of the construction cost of the detention basin which meets the requirements for a future emergency services precinct on the site

d       delegate authority to the General Manager or his delegate to execute any necessary documents on behalf of Council

e       note and approve the budget variation/s as detailed in the budget section of the report

 

Key Reasons

Initial request from the Developer

Rather than incorporate the detention basin in to the residential development area the developer has approached Council regarding the use of Council land for this purpose. The reasons for this include:

 

a)      The land is being retained by Council for non-residential purposes. The proposed use is compatible with the present aim.

b)      The proposed location makes sense from a topographical point of view being located in a naturally low lying area.

c)      Council will retain ownership and control of the land. Appropriate easements or dedications will be created for future management of the detention basin.

d)      The proposed location will allow Council future ease of maintenance compared to a location alongside residential allotments

The proposal will allow the developer to create approximately five residential development blocks measuring an average of 700 square metres in place of the detention basin. For this reason it is considered appropriate for the developer to compensate Council for the use of the land.

 

Previous Resolutions

Council resolved on 23 November 2015 and again on 14 December 2015 to defer consideration of the request from the developer to establish a drainage detention basin on Lot 2 DP702330.

 

Council received a further report on 29 February 2016 which responded to questions raised at the 23 November 2015 meeting and advised that Council staff were continuing investigations around the best use of the land at Lot 2 DP702230.

 

Council resolved on 27 June 2016 to set aside Lot 2 DP702330 as the preferred site for an Emergency Services Precinct.

 

Fair Valuation for use of the site

Both Council and the developer obtained an assessment of market value for the land from independent valuers. Council’s valuer considered the land to be worth $30,000, whilst the developer’s valuer assessed the land to be worth $40,000. This amount represents the difference in potential development profit Council could derive from the land before and after the creation of the detention basin.

 

Requirements of the Emergency Services Agencies

The RFS and NSW Fire & Rescue initially requested that the detention basin be constructed with the capacity to hold permanent water storage for training and fire fighting purposes.

 

This was later revised and Council received advice as follows:

 

After discussions with C/Supt Ken Murphy and Mr Andrew Peters following our last meeting it has been decided that the detention basin should not have a permanent capacity.

 

However the ability to hold water on a temporary basis would be advantageous ie gate valves on the outlets that are kept open but can be closed;

 

1 As a point of retention should there be a spill in the estate that should not be released onto the floodplain (HAZMAT)

2 To prevent backfilling of the basin in a high flood event

3To provide a temporary fill point for fire fighting purposes ie training/operations

 

A permanent water source would potentially provide a breeding environment for mosquitoes and potentially be fouled with algal growth and rubbish. Additionally the risk presented to children both locally and on site is undesirable

 

This advice was provided to the developer,

 

Request for a financial contribution by Council to the developer

The developer has provided a request supported by plans and a separate bill of quantities that Council contribute $30,000 towards the cost of construction. The letter of request is attached.

 

The developer has advised as follows:

 

I can confirm that I had my engineers complete an independent analysis of the costs of the basin that is now proposed, including the variations for the emergency services precinct, to assess a fair costing of the additional expenses to be incurred for the additions required by the Services.

 

I had asked that the bill of quantities be shown together with a percentage term, as this is not yet a tender cost, once a tender is sought and received I will forward it to council for review.

 

As you are aware I wish to be in a position to commence work on Stage 6 Boorooma in March or April 2017.

 

The basin has been sized to cater for Boorooma Estate stages 6 and 7 along with the emergency services precinct. Based on both catchments and percentage impervious areas we calculate that the shared contributions to the basin are equitable at 70% Boorooma Estate and 30% Emergency Services Precinct.

 

Basis for this assumption:-

BOOROOMA STAGE 6 AND 7 = 10HA AT 60% PAVED = 6HA EMERGENCY SERVICES SITE 5HA AT 50% PAVED = 2.5HA PERCENTAGE USAGE OF BASIN BOOROOMA 70%, EMERGENCY 30%

 

The above ratio applies to the basin construction works that both catchments utilise. There are several items that are catchment specific, ie length of drainage pipes, outlet valve. This is all reflected in the Schedule of Works provided.

 

The request has been considered by Council officers and determined that the request for contribution is reasonable and sufficiently justified.

 

Financial Implications

The Diocese of Wagga Wagga will meet all costs in relation to this matter with the exception of the contribution of $30,000.

 

The fair value compensation of $40,000 less the pro-rata contribution to the detention basin of $30,000 will be paid into the Strategic Property Reserve.

 

Ongoing maintenance of the detention basin will be covered by Council’s annual maintenance budgets.

Policy

N/A

 

Link to Strategic Plan

3. We have a growing economy

3.2 Our community grows

 

Risk Management Issues for Council

A Deed of Agreement will be prepared by Council’s lawyers to formalise the legal arrangements associated with access onto the site and construction of the detention basin.

Internal / External Consultation

Consultation has occurred internally with relevant Council staff and externally with the emergency agencies and the developer.

 

Attachments  

1.

General Manager Boorooma Stages 6 and 7 Dev Consent

 

2.

Basin Share Plans

 

3.

BOQ Basin Share Plans

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                              RP-5

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                                          RP-5

 




Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                              RP-5

 






Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                       RP-6

 

RP-6               FINANCIAL PERFORMANCE REPORT AND QUARTERLY BUDGET REVIEW AS AT 31 DECEMBER 2016

Author:                        Rodney, Carolyn

Sector Manager:       Te Pohe, Natalie

         

Analysis:

This report is for Council to consider and approve the proposed 2016/17 budget variations required to manage the 2016/17 budget and Long Term Financial Plan, and to detail Council’s external investments.

 

 

Recommendation

That Council:

a       approve the proposed 2016/17 budget variations for the month ended 31 December 2016 and note the deficit budget of ($72K) as presented in this report

b       note the Responsible Accounting Officer’s reports, in accordance with the Local Government (General) Regulation 2005 (Part 9 Division 3: Clause 203) that the financial position of Council is satisfactory having regard to the original estimates of income and expenditure and the recommendations made above

c        note details of the external investments as at 31 December 2016 in accordance with Section 625 of the Local Government Act 1993

 

Key Reasons

An overall budget deficit of ($72K) is forecast as at 31 December 2016 which is an increase to the deficit that was reported as at 30 November 2016 of ($62K). This is a result of the 5 December 2016 Supplementary Council Meeting whereby the resolution contained within the Confidential Mayoral Minute MM-1 regarding airport fees and charges resulted in a further reduction to the anticipated dividend of ($10K).

 

Council experienced a positive monthly investment performance for the month of December which is mainly attributable to the positive performance experienced for the month for Council’s managed funds (NSW T-Corp). Council’s Floating Rate Note portfolio has continued a period of strong growth, with many of these investments trading at a premium.

 

Financial Implications

Key Performance Indicators

 

 

OPERATING INCOME

Total operating income is 49% of approved budget which is tracking to budget for the end of December (this percentage excludes capital grants and contributions). An adjustment has been made to reflect the levy of rates which occurred at the start of the financial year. Excluding this adjustment, operating income received is 77%.

 

OPERATING EXPENSES

Total operating expenditure is 50% of approved budget and is tracking to budget for the full financial year.

 

CAPITAL INCOME

Total capital income is 19% of approved budget. It should be noted that the actual income from capital is influenced by the timing of the receipt of capital grants and contributions relating to projects.

 

CAPITAL EXPENDITURE

Total capital expenditure including commitments is 41% of approved budget.


 

CITY OF WAGGA WAGGA
STATEMENT OF FINANCIAL PERFORMANCE
1 JULY 2016 TO 31 DECEMBER 2016

CONSOLIDATED STATEMENT

 

ORIGINAL
BUDGET
2016/17
$'000

BUDGET ADJ
2016/17
$'000

APPROVED BUDGET
2016/17
$'000

YTD ACTUAL   EXCL COMMT'S 2016/17

COMMT'S 2016/17
$'000

YTD ACTUAL + COMMT'S
2016/17
$'000

YTD % OF BUD

Revenue

 

Rates & Annual Charges

(60,642,286)

0

(60,642,286)

(30,863,824)

0

(30,863,824)

51%

User Charges & Fees

(23,631,263)

52,250

(23,579,013)

(10,408,270)

33,454

(10,374,816)

44%

Interest & Investment Revenue

(3,406,597)

0

(3,406,597)

(2,080,144)

0

(2,080,144)

61%

Other Revenues

(3,123,096)

(14,584)

(3,137,680)

(1,535,942)

0

(1,535,942)

49%

Operating Grants & Contributions

(14,779,516)

(463,547)

(15,243,063)

(7,542,115)

0

(7,542,115)

49%

Capital Grants & Contributions

(34,768,294)

(20,933,790)

(55,702,084)

(10,267,366)

0

(10,267,366)

18%

Total Revenue

(140,351,052)

(21,359,671)

(161,710,723)

(62,697,662)

33,454

(62,664,208)

39%

 

 

Expenses

 

Employee Benefits & On-Costs

42,105,886

94,622

42,200,508

21,049,466

38,752

21,088,218

50%

Borrowing Costs

3,953,083

(157,682)

3,795,402

1,788,358

0

1,788,358

47%

Materials & Contracts

2,719,884

8,703

2,728,586

5,077,701

906,707

5,984,408

219%

Depreciation & Amortisation

32,405,375

0

32,405,375

16,202,687

0

16,202,687

50%

Other Expenses

37,495,505

2,241,896

39,737,401

13,791,655

1,521,803

15,313,458

39%

Total Expenses

118,679,732

2,187,540

120,867,272

57,909,868

2,467,261

60,377,129

50%

 

 

Net Operating (Profit)/Loss

(21,671,319)

(19,172,131)

(40,843,451)

(4,787,794)

2,500,715

(2,287,079)

 

 

 

 

 

 

 

 

 

Net Operating (Profit)/Loss before Capital Grants & Contributions

 

13,096,975

1,761,659

14,858,633

5,479,571

2,500,715

7,980,287

54%

 

 

Cap/Reserve Movements

Capital Exp - Renewals

24,265,446

9,390,647

33,656,093

5,124,657

6,557,602

11,682,259

35%

Capital Exp - New Projects

45,680,456

8,591,976

54,272,432

5,969,563

21,644,667

27,614,230

51%

Capital Exp - Project Concepts

8,314,763

789,044

9,103,807

1,359

0

1,359

0%

Loan Repayments

2,603,821

(173,623)

2,430,198

1,215,098

0

1,215,098

50%

New Loan Borrowings

(13,859,917)

7,992,810

(5,867,108)

0

0

0

0%

Sale of Assets

(4,982,151)

3,097,451

(1,884,700)

(305,314)

0

(305,314)

16%

Net Movements Reserves

(7,945,724)

(10,444,578)

(18,390,301)

0

0

0

0%

Total Cap/Res Movements

54,076,694

19,243,726

73,320,420

12,005,364

28,202,269

40,207,633

55%

 

 

Net Result after Depreciation

32,405,375

71,595

32,476,970

7,217,569

30,702,984

37,920,554

 

 

 

Add back Depreciation Expense

32,405,375

0

32,405,375

16,202,687

0

16,202,687

 

 

 

Cash Budget (Surplus)/Deficit

(0)

71,595

71,595

(8,985,118)

30,702,984

21,717,866

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 




Revised Budget Result - Surplus/(Deficit)

$’000s

Original 2016/17 Budget Result as adopted by Council

Total Budget Variations approved as reported to 12 December 2016 Council Meeting

Council Resolution Variations - 5 December 2016 Council Meeting:

·        Airport – reduction in dividend – MM 1

Budget variations for December 2016

$0

($62K)

 

 

($10K)

Proposed revised budget result for 31 December 2016

($72K)

 

The proposed Budget Variations to 31 December 2016 are listed below:

 

Budget Variation

Amount

Funding Source

Net Impact

Fav/ (Unfav)

1 – We are an engaged and involved community

Corporate IT Applications

$410K

 Fit For the Future Reserve ($410K)

Nil

The purchase of Capital Planning and Delivery (CPD) Software is required to allow Council to take control of its asset renewal, replacement and upgrade strategies. This tool integrates asset management and project management with financials all held within the City’s software solution. The software will deliver the following high level benefits:

-  Make informed investment decisions based upon priorities

-  Conduct robust financial management and analysis

-  Effectively manage subcontractors and projects from inception to completion.

Included in the proposed budget variation are implementation costs and internal project management costs to effectively introduce and roll out the software solution. It is proposed to fund the variation from the Fit For the Future Reserve. Annual support and maintenance budgets of $27K, increasing by 3% annually will be included in the Long Term Financial Plan.

 

Hampden Bridge Interpretation Strategy

$81K

Hampden Bridge Grant ($81K)

Nil

Council has been successful in the receipt of a grant for the Hampden Bridge Legacy Project under the ‘Heritage Near Me Activation’ Grants program from the Office of Environment and Heritage. The grant will fund the Hampden Bridge Interpretation Strategy as a condition of the demolition of Hampden Bridge.

Copland Street Traffic Project

$(113K)

Fit For the Future Reserve $104.5K

$8.5K

Council has experienced savings with the Copland Street Traffic Project as the scope of works was modified to be more cost effective whilst still resolving the pedestrian/traffic issues. It is proposed to utilise a portion of the savings to fund Cooinbil Crescent School Crossing with the remaining balance to be transferred to the Fit For the Future Reserve.

Cooinbil Crescent School Crossing

$17K

Cooinbil Crescent School Crossing Grant Income $(8.5K)

$(8.5K)

Works are required to improve pedestrian safety at the Cooinbil Crescent School Crossing. RMS is providing grant funds of $8.5K for the project and it is proposed to utilise $8.5K of the Copland Street Traffic Project savings to fund the required matching Council contribution.

4 – We have a sustainable natural and built environment

SoACT Air Conditioning Upgrade

$20K

Sundry Property Maintenance ($20K)

Nil

Works are required for the Wagga Wagga School of Arts Community Theatre (SoACT) for the installation of air conditioning in the Basement Theatre. The proposed works to be funded from savings in the Sundry Property maintenance area include the upgrading of ventilation as per the Building Code of Australia audit carried out in the SoACT space.

 

Leavenworth Drive Street Lighting

$9K

Street Lighting Improvements Budget  ($9K)

 

Nil

Additional funds are required due to the change in scope for the Leavenworth Drive Street Lighting project for the replacement of the previously quoted timber poles with impact absorbing street light stanchions to meet AS1158 standards. This will be funded from the existing Street Lighting Improvements Budget.

 

Flood Event September 2016

$500K

Flood Event September 2016 Grant Income ($500K)

 

Nil

State funds have been received from the Roads and Maritime Services on behalf of Transport NSW to assist flood ravaged communities to fix local roads devastated by floodwater. These funds will be used to offset the preliminary investigation works carried out by Council.

Kerbside Waste Education

$14K

Kerbside Waste Education Contribution Income ($14K)

 

Nil

Suez is contracted by the City of Wagga Wagga to deliver its kerbside waste services. As part of the contract Suez are required to fund and deliver waste education initiatives in each contracted year with the aim of increasing the correct separation of wastes and reducing contamination. In 2016 Suez agreed to transfer the unexpended funds for waste education to the City of Wagga Wagga, to undertake a campaign to address plastic bag contamination in kerbside recycling bins. The project will be delivered in early 2017.

SURPLUS/(DEFICIT)

 

 

Nil

 


Current Restrictions

 

CITY OF WAGGA WAGGA

RESERVES SUMMARY

31 DECEMBER 2016

 

Approved Changes

 

 

 

CLOSING BALANCE 2015/16

ADOPTED RESERVE TRANSFERS 2016/17

BUDGET VARIATIONS APPROVED UP TO COUNCIL MEETING 12.12.16

RECOMM CHANGES for Council Resolution

REVISED BALANCE

 

 

Externally Restricted

 

Developer Contributions

(19,387,519)

1,683,496

2,518,552

(15,185,470)

Sewer Fund Reserves

(21,286,523)

2,385,453

3,522,063

(15,379,007)

Solid Waste Reserves

(12,803,085)

751,764

271,273

(11,780,049)

Specific Purpose Unexpended Grants/Cont

(3,473,810)

0

3,473,810

0

Stormwater Levy Reserves

(2,537,418)

(228,466)

164,020

(2,601,864)

Total Externally Restricted

(59,488,355)

4,592,247

9,949,718

0

(44,946,389)

 

 

Internally Restricted

 

Airport Reserve

(202,674)

(65,492)

(31,851)

(300,017)

Art Gallery Reserve

(48,490)

(3,500)

17,500

(34,490)

Ashmont Community Facility Reserve

(3,000)

(1,500)

0

(4,500)

Bridge Replacement Reserve

(646,667)

140,000

420,000

(86,667)

CBD Carparking Facilities Reserve

(936,300)

(94,195)

60,537

(969,958)

CCTV Reserve

(54,476)

(10,000)

0

(64,476)

Cemetery Perpetual Reserve

(123,860)

(89,661)

0

(213,521)

Cemetery Reserve

(308,649)

(136,637)

42,221

(403,065)

Civic Theatre Operating Reserve

0

(100,000)

0

(100,000)

Civic Theatre Tech Infrastructure Res

(55,450)

(50,000)

0

(105,450)

Civil Projects Reserve

(155,883)

0

0

(155,883)

Community Amenities Reserve

(5,685)

0

0

(5,685)

Council Election Reserve

(417,616)

236,558

0

(181,058)

Economic Developt Incentives Reserve

(19,500)

0

0

(19,500)

Employee Leave Entitles Gen Fund Res

(3,352,639)

0

0

(3,352,639)

Estella Community Centre Reserve

(230,992)

0

0

(230,992)

Family Day Care Reserve

(135,608)

14,606

0

(121,002)

Fit for the Future Reserve

(952,184)

388,225

(2,250,835)

305,500

(2,509,294)

Generic Projects Saving

(927,180)

(116,966)

103,039

(941,106)

Glenfield Community Centre Reserve

(15,704)

(2,000)

0

(17,704)

Grassroots Cricket Reserve

(45,942)

(15,000)

0

(60,942)

Gravel Pit Restoration Reserve

(738,010)

0

0

(738,010)

Gurwood Street Property Reserve

(50,454)

0

0

(50,454)

Industrial Land Development Reserve

(328,851)

0

0

(328,851)

Information Services / E-Business Res

(378,713)

0

0

(378,713)

Infrastructure Replacement Reserve

(77,488)

(887)

28,233

(50,142)

Insurance Variations Reserve

(28,644)

0

0

(28,644)

Internal Loans Reserve

(1,289,806)

(629,241)

444,842

(1,474,205)

Lake Albert Improvements Reserve

(113,972)

0

113,789

(182)

LEP Preparation Reserve

(38,665)

0

36,120

(2,545)

Livestock Marketing Centre Reserve

(8,095,560)

3,215,056

1,675,773

(3,204,732)

Lloyd Environmental Projects Res

(101,371)

0

0

(101,371)

Museum Acquisitions Reserve

(39,378)

0

0

(39,378)

Oasis Building Renewal Reserve

(122,000)

(50,000)

121,000

(51,000)

Oasis Plant Reserve

(1,005,347)

(110,000)

0

(1,115,347)

Parks & Recreation Projects

(91,288)

0

86,000

(5,288)

Pedestrian River Crossing Reserve

(198,031)

150,000

0

(48,031)

Plant Replacement Reserve

(5,145,588)

(151,353)

158,636

(5,138,305)

Playground Equip Replacement Res

0

(51,230)

0

(51,230)

Project Carryovers Reserve

(1,841,669)

0

1,841,669

(0)

Public Art Reserve

(199,713)

137,579

51,424

(10,711)

Robertson Oval Redevelopment Res

(86,697)

0

0

(86,697)

Senior Citizens Centre Reserve

(11,627)

(2,000)

0

(13,627)

Silverlite Reserve

(29,980)

0

0

(29,980)

Sister Cities Reserve

(30,914)

(10,000)

5,000

(35,914)

Stormwater Drainage Reserve

(473,996)

0

236,722

(237,274)

Strategic Real Property Reserve

(5,136)

0

(274,073)

(279,209)

Street Lighting Replacement Reserve

(44,755)

(30,000)

0

(74,755)

Subdivision Tree Planting Reserve

(195,795)

40,000

0

(155,795)

Sustainable Energy Reserve

(430,442)

(90,000)

0

(520,442)

Traffic Committee Reserve

0

(50,000)

0

(50,000)

Unexpended External Loans Reserve

(163,087)

0

0

(163,087)

Total Internally Restricted

(29,995,474)

2,462,361

2,885,747

245,500

(24,341,866)

 

 

Total Restricted

(89,483,829)

7,054,608

12,835,465

245,500

(69,288,256)

 

 


Contracts Review Statement

 

CITY OF WAGGA WAGGA

CONTRACTS REVIEW STATEMENT

31 DECEMBER 2016

Contract Number

Contractor

Contract
Detail & Purpose

Contract
Value

Start
Date

Duration of
Contract

Budget
(Yes/ No)

2017/502

J A Power Pty Ltd

Cambell Place Sewer Realignment

 98,037

28/02/17

4 weeks

y

2016*504

Breust Constructions Pty Ltd

Flood Gate 15A Shelter

 66,935

28/02/17

8 Weeks

y

 

 

 

 

 

 

 

Notes:

1. Minimum reporting level is 1% of estimated income from continuting operations or $50,000, whichever is the lesser.

2. Contracts to be listed are those entered into during the quarter and have yet to be fully performed, excluding contractors that are on Council's Preferred Supplier list.

3. Contracts for employment are not required to be included.

4. Where a contract for services etc was not included in the budget, an explanation is to be given (or reference made to an explanation in another Budget Review Statement).

 

Consultancy & Legal Expenses Budget Review Statement

 

CITY OF WAGGA WAGGA

CONSULTANCY & LEGAL EXPENSES BUDGET REVIEW STATEMENT

31 DECEMBER 2016

 

 

Approved Changes

 

 

 

 

 

 

BUDGET 2016/17

SEPTEMBER QTR BUDGET VARIATIONS

DECEMBER QTR BUDGET VARIATIONS

REVISED BUDGET

PROPOSED CHANGES
for Council Resolution

PROJECTED YEAR END RESULT

ACTUAL YTD

 

 

 

Consultancies

448,196

7,015

73,315

528,526

0

590,266

532,906

 

 

 

Legals

376,504

11,558

11,198

399,260

0

399,260

239,114

 

 

 

 

 

 

 

 

 

 

 

 

 


Investment Summary as at 31 December 2016

In accordance with Clause 212 of the Local Government (General) Regulation 2005, details of Wagga Wagga City Council’s external investments are detailed below:

 

Institution

Rating

Closing Balance
Invested
30/11/2016
$

Closing Balance
Invested
31/12/2016
$

December
EOM
Current Yield
%

December
EOM
%
of Portfolio

Investment
Date

Maturity
Date

Term
(mths)

Short Term Deposits

 

 

 

 

 

 

 

 

Police Credit Union

NR

1,000,000

1,000,000

2.87%

0.95%

6/12/2016

6/12/2017

12

BOQ

A-

2,000,000

2,000,000

2.75%

1.91%

2/09/2016

4/04/2017

7

NAB

AA-

1,000,000

1,000,000

2.96%

0.95%

2/06/2016

3/01/2017

7

NAB

AA-

1,000,000

1,000,000

2.90%

0.95%

25/07/2016

25/01/2017

6

BOQ

A-

2,000,000

2,000,000

2.80%

1.91%

7/12/2016

7/07/2017

12

Bank of Sydney

NR

2,000,000

2,000,000

2.75%

1.91%

30/09/2016

29/09/2017

12

CUA

BBB+

1,000,000

1,000,000

3.15%

0.95%

10/02/2016

9/02/2017

12

NAB

AA-

1,000,000

1,000,000

2.74%

0.95%

25/10/2016

25/05/2017

7

ME Bank

BBB+

1,000,000

1,000,000

3.10%

0.95%

23/02/2016

23/02/2017

12

Auswide

BBB

1,000,000

0

0.00%

0.00%

1/03/2016

22/12/2016

10

AMP

A+

2,000,000

2,000,000

3.00%

1.91%

2/08/2016

2/08/2017

12

Bankwest

AA-

2,000,000

0

0.00%

0.00%

25/10/2016

16/12/2016

2

BOQ

A-

1,000,000

1,000,000

2.80%

0.95%

7/11/2016

8/05/2017

6

Bankwest

AA-

0

2,000,000

2.55%

1.91%

6/12/2016

3/02/2017

2

ME Bank

BBB+

0

2,000,000

2.80%

1.91%

16/12/2016

16/10/2017

10

Total Short Term Deposits

 

18,000,000

19,000,000

2.83%

18.14%

 

 

 

At Call Accounts

 

 

 

 

 

 

 

 

NAB

AA-

3,095,401

785,467

1.50%

0.75%

N/A

N/A

N/A

NAB

AA-

11,433,382

10,655,049

2.19%

10.17%

N/A

N/A

N/A

AMP

A+

110

0

0.00%

0.00%

N/A

N/A

N/A

AMP

A+

179,125

179,559

2.20%

0.17%

N/A

N/A

N/A

Beyond Bank

BBB+

74,260

74,323

1.00%

0.07%

N/A

N/A

N/A

CBA

AA-

30,878

30,830

0.00%

0.03%

N/A

N/A

N/A

Total At Call Accounts

 

14,813,156

11,725,228

2.13%

11.20%

 

 

 

Medium Term Deposits

 

 

 

 

 

 

 

 

RaboBank

A+

1,000,000

1,000,000

6.40%

0.95%

23/04/2012

24/04/2017

60

RaboBank

A+

1,000,000

1,000,000

5.90%

0.95%

4/06/2012

5/06/2017

60

BOQ

A-

1,000,000

1,000,000

6.30%

0.95%

22/08/2012

22/08/2017

60

ING Bank

A-

3,000,000

3,000,000

6.00%

2.86%

24/08/2012

24/08/2017

60

Hume Building Society

NR

1,009,123

1,009,123

4.10%

0.96%

21/08/2014

21/08/2017

36

Banana Coast CU

NR

1,000,000

1,000,000

4.25%

0.95%

3/06/2014

2/06/2017

36

ME Bank

BBB+

2,000,000

2,000,000

4.28%

1.91%

2/09/2014

2/09/2019

60

Rabobank

A+

1,000,000

1,000,000

4.10%

0.95%

5/12/2014

5/12/2019

60

Beyond Bank

BBB+

990,000

990,000

3.70%

0.95%

4/03/2015

4/03/2018

36

Beyond Bank

BBB+

990,000

990,000

3.70%

0.95%

11/03/2015

11/03/2018

36

AMP

A+

2,000,000

2,000,000

3.10%

1.91%

2/06/2015

2/06/2017

24

AMP

A+

1,000,000

1,000,000

3.10%

0.95%

13/07/2015

13/07/2017

24

Bendigo-Adelaide

A-

1,000,000

1,000,000

2.80%

0.95%

1/09/2015

3/03/2017

18

Newcastle Permanent

BBB+

1,000,000

1,000,000

3.00%

0.95%

12/08/2016

12/08/2019

36

Rabobank

A+

1,000,000

1,000,000

3.20%

0.95%

25/08/2016

25/08/2021

60

Newcastle Permanent

BBB+

1,000,000

1,000,000

3.00%

0.95%

31/08/2016

30/08/2019

36

Institution

Rating

Closing Balance
Invested
30/11/2016
$

Closing Balance
Invested
31/12/2016
$

December
EOM
Current Yield
%

December
EOM
%
of Portfolio

Investment
Date

Maturity
Date

Term
(mths)

Medium Term Deposits Continued

 

 

 

 

 

 

 

 

Police Credit Union

NR

1,000,000

1,000,000

2.90%

0.95%

8/09/2016

10/09/2018

24

Total Medium Term Deposits

 

20,989,123

20,989,123

4.25%

20.04%

 

 

 

Floating Rate Notes - Senior Debt

 

 

 

 

 

 

 

 

Macquarie Bank

A

3,017,754

3,012,678

BBSW + 290

2.88%

9/03/2012

9/03/2017

60

CUA

BBB+

1,007,182

1,002,019

BBSW + 130

0.96%

28/05/2014

20/03/2017

34

Bendigo-Adelaide

A-

1,003,056

998,132

BBSW + 93

0.95%

17/09/2014

17/09/2019

60

BOQ

A-

2,007,860

1,997,940

BBSW + 110

1.91%

5/08/2014

24/06/2019

58

BOQ

A-

998,114

998,203

BBSW + 107

0.95%

6/11/2014

6/11/2019

60

BOQ

A-

1,000,000

1,002,149

BBSW + 107

0.96%

10/11/2014

6/11/2019

60

ME Bank

BBB+

1,000,709

1,003,057

BBSW + 100

0.96%

17/11/2014

17/11/2017

36

ME Bank

BBB+

1,000,091

1,000,139

BBSW + 100

0.96%

17/11/2014

17/11/2017

36

Teachers Mutual

BBB+

999,295

1,002,353

BBSW + 105

0.96%

4/12/2014

4/12/2017

36

Newcastle Permanent

BBB+

999,590

1,002,460

BBSW + 110

0.96%

27/02/2015

27/02/2018

36

Macquarie Bank

A

1,996,362

2,000,589

BBSW + 110

1.91%

3/03/2015

3/03/2020

60

ANZ

AA-

750,471

751,673

BBSW + 82

0.72%

17/04/2015

17/04/2020

60

Heritage Bank

BBB+

998,560

1,001,610

BBSW + 115

0.96%

7/05/2015

7/05/2018

36

NAB

AA-

995,104

996,401

BBSW + 80

0.95%

3/06/2015

3/06/2020

60

Heritage Bank

BBB+

998,560

1,001,610

BBSW + 115

0.96%

9/06/2015

7/05/2018

35

CBA

AA-

1,001,372

1,003,805

BBSW + 90

0.96%

17/07/2015

17/07/2020

60

Westpac

AA-

1,001,760

1,003,830

BBSW + 90

0.96%

28/07/2015

28/07/2020

60

Bendigo-Adelaide

A-

1,000,070

1,002,050

BBSW + 110

0.96%

18/08/2015

18/08/2020

60

Credit Suisse

A

999,860

1,002,510

BBSW + 105

0.96%

24/08/2015

24/08/2018

36

Bendigo-Adelaide

A-

999,363

1,001,019

BBSW + 110

0.96%

28/09/2015

18/08/2020

59

Westpac

AA-

2,000,053

2,003,801

BBSW + 90

1.91%

30/09/2015

28/07/2020

58

Suncorp-Metway

A+

1,008,612

1,010,598

BBSW + 125

0.96%

20/10/2015

20/10/2020

60

Westpac

AA-

4,028,720

4,036,320

BBSW + 108

3.85%

28/10/2015

28/10/2020

60

AMP

A+

1,813,140

1,805,940

BBSW + 110

1.72%

11/12/2015

11/06/2019

42

CBA

AA-

1,008,476

1,010,406

BBSW + 115

0.96%

18/01/2016

18/01/2021

60

BOQ

A-

1,003,722

1,005,896

BBSW + 100

0.96%

5/02/2016

5/02/2018

24

Rabobank

A+

2,023,994

2,029,394

BBSW + 150

1.94%

4/03/2016

4/03/2021

60

Newcastle Permanent

BBB+

1,009,356

1,003,827

BBSW + 160

0.96%

22/03/2016

22/03/2019

36

CUA

BBB+

2,015,382

2,004,482

BBSW + 160

1.91%

1/04/2016

1/04/2019

36

ANZ

AA-

1,010,455

1,010,757

BBSW + 118

0.97%

7/04/2016

7/04/2021

60

Suncorp-Metway

A+

1,011,238

1,013,620

BBSW + 138

0.97%

21/04/2016

12/04/2021

60

AMP

A+

1,006,065

1,007,583

BBSW + 135

0.96%

24/05/2016

24/05/2021

60

Westpac

AA-

1,012,530

1,007,280

BBSW + 117

0.96%

3/06/2016

3/06/2021

60

CBA

AA-

1,009,767

1,011,442

BBSW + 121

0.97%

12/07/2016

12/07/2021

60

ANZ

AA-

2,008,337

2,007,286

BBSW + 113

1.92%

16/08/2016

16/08/2021

60

BOQ

A-

1,504,531

1,508,268

BBSW + 117

1.44%

26/10/2016

26/10/2020

48

NAB

AA-

1,000,054

1,000,667

BBSW + 105

0.96%

21/10/2016

21/10/2021

60

Teachers Mutual

BBB+

1,504,602

1,508,930

BBSW + 140

1.44%

28/10/2016

28/10/2019

36

Bendigo-Adelaide

A-

999,562

1,001,409

BBSW + 110

0.96%

21/11/2016

21/02/2020

39

Total Floating Rate Notes - Senior Debt

 

51,753,728

51,772,133

49.44%

 

 

 

Managed Funds

 

 

 

 

 

 

 

 

NSW TCorp

NR

1,201,937

1,238,765

3.06%

1.18%

17/03/2014

1/12/2021

92

Total Managed Funds

 

1,201,937

1,238,765

3.06%

1.18%

 

 

 

TOTAL CASH ASSETS, CASH
EQUIVALENTS & INVESTMENTS

 

106,757,943

104,725,248

3.78%

100.00%

 

 

 

LESS: RIVERINA REGIONAL LIBRARY (RRL) CASH

 

2,318,372

2,051,129

 

 

 

TOTAL WWCC CASH ASSETS, CASH
EQUIVALENTS & INVESTMENTS

 

104,439,571

102,674,119

 

 

 

 

 

Council’s portfolio is dominated by Floating Rate Notes (FRN’s) at approximately 50% across a broad range of counterparties. Cash equates to 11% of Council’s portfolio with Term Deposits around 38% and growth funds around 1% of the portfolio.

 

 

Council’s investment portfolio is well diversified in complying assets across the entire credit spectrum. It is also well diversified from a rating perspective. Credit quality is diversified and is predominately invested amongst the investment grade ADIs (BBB- or higher), with a smaller allocation to unrated ADIs.

 

 

All investments are well within the defined Policy limits, as outlined in the Rating Allocation chart below:

 

 

 

 

 

 

 

 

 

 

Investment Portfolio Balance

 

Council’s investment portfolio balance has decreased slightly from the previous month’s balance, down from $104.4M to $102.7M.

 

 

 

MONTHLY INVESTMENT MOVEMENTS

 

Redemptions/Sales - Council redeemed the following investment securities during December 2016:

 

Institution and Type

Amount

Investment

Term

Interest

Rate

Comments

Auswide Bank Term Deposit

$1M

10 months

3.07%

This term deposit was redeemed for cashflow purposes.

Bankwest Term Deposit

$2M

2 months

2.55%

This term deposit was redeemed and reinvested with ME Bank.

 

New Investments - Council purchased the following investment securities during December 2016:

 

Institution and Type

Amount

Investment

Term

Interest

Rate

Comments

Bankwest Term Deposit

$2M

2 months

2.55%

The Bankwest rate of 2.55% compared favourably to the rest of the market for this investment term. This term was chosen to align with the estimated timing of capital project expenditure.

ME Bank Term Deposit

$2M

10 months

2.80%

The ME Bank rate of 2.80% compared favourably to the rest of the market for this investment term. This term was chosen to align with the estimated timing of capital project expenditure.

 


Rollovers – Council rolled the following investment securities during December 2016:

 

Institution and Type

Amount

Investment

Term

Interest

Rate

Comments

Police Credit Union Term Deposit

$1M

12 months

2.87%

This term deposit was a six (6) month investment at 3.02% and was rolled at maturity into a twelve (12) month term deposit at 2.87%. This investment term was chosen to ensure a maturity gap was filled.

 

MONTHLY PERFORMANCE

 

Interest/growth/capital gains for the month totaled $336,645 which compares favourably with the budget for the period of $257,250 – out performing budget for the December month by $79,395. This is mainly attributable to the positive adjustment of $36,828 for Council’s managed funds (NSW T-Corp) for the December period. Council’s Floating Rate Note (FRN) portfolio has continued a period of strong growth, with many of these investments continuing to trade at a premium.

 

It should be noted that the capital market value of these FRN investments will fluctuate from month to month and that Council continues to receive the coupon payments and the face value of the investment security when sold or at maturity.

 

 

Council’s portfolio performance continues to be anchored by the longer-dated deposits in the portfolio, particularly those locked in above 4% yields. It is to be noted however that the average deposit yield will inevitably fall as some of the longer-dated deposits mature within the next year.

 

In comparison to the AusBond Bank Bill Index* (+2.07%pa), Council’s investment portfolio in total returned 3.78% for December. Short term deposits returned 2.83%. These funds are utilised for daily cash flow management and need to be available to meet operating and contractual payments as they come due.

 

 

* The AusBond Bank Bill Index is the leading benchmark for the Australian fixed income market. It is interpolated from the RBA Cash rate, 1 month and 3 month Bank Bill Swap rates.

Cash & Investments Budget Review Statement

I hereby certify that all of the above investments have been made in accordance with the provision of Section 625 of the Local Government Act 1993 and the regulations there under, and in accordance with the WWCC Investments Policy adopted by Council on 26 August 2013.

 

The Cash at Bank amount has also been reconciled to Council's physical Bank Statements.

 

Report by Responsible Accounting Officer

The following statement is made in accordance with Clause 203(2) of the Local Government (General) Regulations 2005. It is my opinion that the Quarterly Budget Review Statement for Wagga Wagga City Council for the quarter ended 31 December 2016 indicates that Council’s projected financial position at 30 June 2017 will be satisfactory at year end, having regard to the projected estimates of income and expenditure and the original budgeted income and expenditure.

 

Carolyn Rodney

Responsible Accounting Officer

 

Policy

Budget Variations are reported in accordance with POL 052 Budget Policy.

Investments are reported in accordance with POL 075 Investment Policy.

 

Link to Strategic Plan

1. We are an engaged and involved community

1.1 We are a community that is informed and involved in decisions impacting us

 

Risk Management Issues for Council

No specific issues identified.

Internal / External Consultation

All relevant areas within Council have consulted with the Finance Division in regards to the budget variations listed in this report.

 

The Finance Division has consulted with relevant external parties to confirm Council’s investment portfolio balances.

 

  

 

   


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                         M-1

 

Committee Minutes

M-1                 RIVERINA REGIONAL LIBRARY ADVISORY COMMITTEE MINUTES - 30 NOVEMBER 2016

Author:                        Knight, Robert

General Manager:    Eldridge, Alan

         

Recommendation

That Council:

a       receive and note the minutes of the Riverina Regional Library Advisory Committee Meeting held on 30 November 2016

b       endorse the inclusion of $20,000 additional funding for the Mobile Library collection in the 2017-18 budget

c        endorse the cost of this funding increase to be divided amongst the member Councils that use the mobile library on the same basis that existing mobile costs are allocated, that being on a percentage of use basis

d       endorse the Mobile Library collections allocation to be subject to the agreed RRL funding model, which applies the annual rate pegging variation to operational costs

 

Key Reasons

The Riverina Regional Library Advisory Committee meeting was held on 30 November 2016. Minutes of the meeting and mobile library collections funding report are attached.

 

The Riverina Regional Library operates under two primary pieces of legislation – the Local Government Act 1993 and the Library Act 1939.

 

Wagga Wagga City Council undertakes the role of ‘Executive Council’ under the current Riverina Regional Library Deed of Agreement, and the Riverina Regional Library operates under the policies of the Executive Council in order to comply with the requirements of the Local Government Act. An advisory committee, known as the Riverina Regional Library Advisory Committee, provides advice and recommendations to the Executive Council on matters pertaining to Riverina Regional Library.

 

Financial Implications

An additional proposed $20,000 budget for Collections is to be included in the 2017/18 budget. Based on the 2015-16 population statistics, the apportionment of costs amongst participating Councils is as follows:

 

Coolamon

Federation

Greater Hume

Lockhart

Snowy Valleys

Temora

Wagga Wagga

Total

$1,620

$3,382

$4,874

$3,826

$2,332

$814

$3,152

$20,000

Policy

N/A

 

Link to Strategic Plan

1. We are an engaged and involved community

1.1 We are a community that is informed and involved in decisions impacting us

 

Risk Management Issues for Council

No specific issues identified.

Internal / External Consultation

N/A

 

Attachments  

1.

RRL Advisory Committee Minutes - 30 November 2016

 

2.

Mobile Library Collections Funding Report - 30 November 2016

 

 

 

 


Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                                M-1

 







Report submitted to the Ordinary Meeting of Council on Monday 30 January 2017.                                                                                M-1

 




  


Report submitted to the Confidential Meeting of Council on Monday 30 January 2017.

 

QUESTIONS/BUSINESS WITH NOTICE

 


Confidential Reports

CONF-1                       DISCHARGE OF MORTGAGE

Author:                        Butterfield, David

Sector Manager:       Te Pohe, Natalie

 

This report is CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, which permits the meeting to be closed to the public for business relating to the following: -

(a)         personnel matters concerning particular individuals.        

 

 


Report submitted to the Confidential Meeting of Council on Monday 30 January 2017.                                            CONF-2

 

CONF-2                       WAGGA WAGGA MAIN CITY LEVEE – STAGE 1 TENDER AND REVIEW OF ENVIRONMENTAL FACTORS DETERMINATION

Author:                        Woods, Darryl

Sector Manager:       Angel, Caroline

 

This report is CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, which permits the meeting to be closed to the public for business relating to the following: -

(d) (ii)    commercial information of a confidential nature that would, if disclosed, confer a commercial advantage on a competitor of the Council.        

 

 


Report submitted to the Confidential Meeting of Council on Monday 30 January 2017.                                            CONF-3

 

CONF-3                       RFT2017/05 SUPPLY OF SWIMWEAR AND ACCESSORIES

Author:                        Eames, Maurice

Sector Manager:       Somerville, Paul

 

This report is CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, which permits the meeting to be closed to the public for business relating to the following: -

(d) (i)     commercial information of a confidential nature that would, if disclosed, prejudice the commercial position of the person who supplied it.        

 

 


Report submitted to the Confidential Meeting of Council on Monday 30 January 2017.                                            CONF-4

 

CONF-4                       RFT2017/12 HIRED PLANT, FLEET AND EQUIPMENT

Author:                        Butterfield, David

Sector Manager:       Te Pohe, Natalie

 

This report is CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, which permits the meeting to be closed to the public for business relating to the following: -

(d) (i)     commercial information of a confidential nature that would, if disclosed, prejudice the commercial position of the person who supplied it.        

 

 


Reports submitted to the Ordinary Meeting of Council to be held on Monday 30 January 2017.

CONF-5                       EXTRAORDINARY AUDIT AND RISK COMMITTEE MINUTES - 15 DECEMBER 2016

Author:                        Hensley, Ingrid

General Manager:    Eldridge, Alan

 

This report is CONFIDENTIAL in accordance with Section 10A(2) of the Local Government Act 1993, which permits the meeting to be closed to the public for business relating to the following: -

(a)         personnel matters concerning particular individuals; and

(g)         advice concerning litigation, or advice that would otherwise be privileged from production in legal proceedings on the ground of legal professional privilege.        

 

   

 


 

Present

The Mayor, Councillor Greg Conkey OAM

Councillor Yvonne Braid

Councillor Dan Hayes

Councillor Vanessa Keenan

Councillor Rod Kendall

Councillor Tim Koschel

Councillor Kerry Pascoe

Councillor Dallas Tout

In Attendance

Community Sector Manager                                                 (Mrs J Summerhayes)

Commercial Operations Sector Manager                           (Mrs C Angel)

Commercial Development Manager                                    (Mr P Somerville)

Chief Financial Officer                                                           (Mrs N Te Pohe)

Manager Special Projects                                                      (Mr C Richardson)

Acting Manager City Strategy                                               (Mrs C Priest)

Manager Finance                                                                   (Mrs C Rodney)

Manager Community Services                                             (Mrs M Scully)

Acting Manager City Development                                      (Mrs A Gray)

Manager Executive Support                                                  (Mr S Gray)

Manager Audit, Risk and Governance                                (Mrs I Hensley)

Project Manager                                                                      (Mr D Woods)

Manager Project Operations                                                 (Mr S Postma)

Manager Livestock Marketing Centre                                  (Mr P Martin)

Team Leader Visitor Economy                                             (Mrs F Hamilton)

Strategic Partner – Corporate Governance & Risk           (Mrs N Johnson)

Communications and Engagement Officer                        (Mr J Lang)

Governance Officer                                                                (Miss B King)

 


 

Prayer

 

Almighty God,

 

Help protect our Mayor, elected Councillors and staff.

 

Help Councillors to govern with justice, integrity, and respect for equality, to preserve rights and liberties, to be guided by wisdom when making decisions and settling priorities, and not least of all to preserve harmony.

 

Amen. 

Acknowledgement Of Country

I would like to acknowledge the Wiradjuri people who are the Traditional Custodians of this Land. I would also like to pay respect to the Elders both past and present of the Wiradjuri Nation and extend that respect to other Community members present.

 

 

APOLOGIES

An apology for non-attendance was received and accepted for the General Manager, Mr Alan Eldridge on the Motion of Councillors V Keenan and D Tout.

CARRIED

 

LEAVE OF ABSENCE

 

16/336       RESOLVED:

                   On the Motion of Councillors V Keenan and D Tout

That Council note a leave of absence was granted at the Supplementary Council Meeting held 5 December 2016 to Councillor P Funnell for 12 December 2016.

CARRIED

 


CONFIRMATION OF MINUTES

 

CM-1         ORDINARY COUNCIL MEETING - 21 NOVEMBER 2016

 

16/337       RESOLVED:

                   On the Motion of Councillors R Kendall and D Hayes

That the Minutes of the proceedings of the Ordinary Council Meeting held on 21 November 2016 be confirmed as a true and accurate record subject to resolution 16/320 CONF-5 RFT2017/013 LAKEHAVEN REAR OF BLOCK DRAINAGE INSTALLATION being corrected to read:

That Council:

a       in accordance with clause 178(1)(b) of the Local Government (General) Regulation 2005 (LG Regulation), decline to accept any of the tenders submitted in response to the RFT

b       in accordance with 178(3)(e) of the LG Regulation, authorise the General Manager or their delegate to enter into direct negotiations with any person whether they were a tenderer or not with a view to entering into a contract in relation to the subject matter of the RFT

c       note that the reason for declining to invite fresh tenders or applications is that it is not expected that further market testing will provide a more satisfactory result

d       note that the reason for determining to enter into negotiations is the terms and conditions are at variance with those of the tender documentation and will be negotiated to settle the final terms of the contract

e       subject to successful negotiations authorise the General Manager or their delegate to enter into a contract for the subject matter of this tender

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 


 

CM-2         SUPPLEMENTARY COUNCIL MEETING - 5 DECEMBER 2016

 

16/338       RESOLVED:

                   On the Motion of Councillors R Kendall and D Hayes

That the Minutes of the proceedings of the Supplementary Council Meeting held on 5 December 2016 be confirmed as a true and accurate record.

CARRIED

  

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

Declarations Of Interest

Councillor T Koschel declared a Non Pecuniary, Non-Significant Interest in PSRP – 4 POMINGALARNA MULTISPORT CYCLING COMPLEX the reason being that he is a member of the Tolland Cycle Club and remained in the chamber during its consideration.

 

Councillor T Koschel declared a Non-Pecuniary Interest in CONFMM-1 CONFIDENTIAL MAYORAL MINUTE - LIVESTOCK MARKETING CENTRE CANTEEN the reason being that the people in the tender are all clients of his private business and vacated the chamber during its consideration.

 

Councillor Braid declared a Non-Pecuniary, Non-Significant Interest in RP-4 MAJOR EVENTS FUNDING REQUEST the reason being that she is a member of the Wollundry Rotary and remained in the chamber during its consideration.

 

Councillor K Pascoe declared a Pecuniary Interest in RP-4 MAJOR EVENTS FUNDING REQUEST the reason being that he is a member of the Wollundry Rotary and vacated the chamber during its consideration.

 

The Mayor, Councillor G Conkey OAM declared a Non-Pecuniary Interest in RP-4 MAJOR EVENTS FUNDING REQUEST the reason being that he is a member of Wollundry Rotary and vacated the chamber during its consideration.


MAYORAL MINUTE

 


MM-1         AIRPORT ADVISORY COMMITTEE

 

16/339       RESOLVED:

                   On the Motion of The Mayor, Councillor G Conkey OAM

That Council:

a       receive and note the draft Airport Advisory Committee Terms of Reference attached to this Mayoral Minute

b       consult with members identified in the body of this report regarding the draft Terms of Reference before presenting back to Council for endorsement

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

 

REPORTS FROM POLICY AND STRATEGY COMMITTEE

 

PS-1          POLICY AND STRATEGY COMMITTEE MEETING - 5 DECEMBER 2016

The Mayor, Councillor G Conkey OAM requested Councillors to nominate any recommendations from the minutes they wished to discuss.

 

16/340       RESOLVED:

                   On the Motion of Councillors R Kendall and T Koschel

That the Minutes of the Policy and Strategy Committee Meeting held on 5 December 2016 be confirmed and recommendations numbered PSCM-1, PSRP-3 to PSRP-8 and PSM-1 contained therein be adopted.

CARRIED

 


RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

 

REPORTS FROM STAFF

 

PSRP-1    DA16/0185 - DEVELOPMENT APPLICATION FOR 2 x 4 BEDROOM HOUSES WITH TORRENS TITLE SUBDIVISION AT 83, BROOKLYN DRIVE, BOURKELANDS

16/341       RESOLVED:

                   On the Motion of Councillors R Kendall and D Tout

That Council approve DA16/0185 - DEVELOPMENT APPLICATION FOR 2 x 4 BEDROOM HOUSES WITH TORRENS TITLE SUBDIVISION AT 83, BROOKLYN DRIVE, BOURKELANDS subject to the conditions outlined in the Section 79C Assessment Report for DA16/0185 with the additional conditions below:

 

Prior to release of Construction Certificate

11(a)     Prior to the release of Construction Certificate a geo-technical report must be submitted to the Principal Certifying Authority that demonstrates that the proposed excavation will not adversely impact the adjoining properties and will be classified in accordance with Part 3.2.4 "Site Classification", of the Building Code of Australia and AS 2870 Residential Slabs and Footings.

This report must be carried out by an experienced geo-technical engineering consultant, with associated testing being conducted by a NATA registered laboratory. The report shall identify the type of "site classification" that exists on the subject site. Any footing/slab design is to be designed having regards to the identified site classification.

REASON: It is in the public interest that all building elements are designed to be able to withstand the combination of loads and other actions to which they may be subjected. Section 79C(1)(b) and (e) of the Environmental Planning and Assessment Act 1979, as amended.

During Works

21(a)     If it is required or intended to excavate below the level of the base of the footings of a building or structure on the adjoining allotment, including a public place, the person causing the excavation must:

(a)     Preserve and protect the building from damage;

(b)     Take into consideration any cut and fill design works that are proposed for any adjoining site(s) in the design of works to the site with the benefit of this consent;

(c)     If necessary, underpin and support the building or structure in an approved manner. Where underpinning is required, details prepared by a practising structural engineer are to be submitted to the Principal Certifying Authority before underpinning works commence; and

(d)     Give at least 7 days notice together with details to the owner(s) of the adjoining allotment of the intention to excavate below the base of the footings;

(e)     Subject to the agreement of the owner(s) of the adjoining allotment, a dilapidation report must be prepared by a qualified structural engineer, for the building or structure on that property, at the expense of the person acting on the consent, and presented to the owner(s) of that property.

Where underpinning is required, details prepared by a practising structural engineer are to be submitted to the Principal Certifying Authority before underpinning works commence.

(f)      engineered design of the retaining structure by a certified practicing engineer prior to the release of the construction certificate

REASON: To minimise the impact of building works on adjoining land and structures and to ensure that all proposed works are designed to be able to withstand the combination of loads and other actions to which they may be subjected. Section 79C(1)(b) of the Environmental Planning and Assessment Act 1979, as amended.

CARRIED

 

RECORD OF VOTING ON DEVELOPMENT OR PLANNING MATTERS - SECTION 375A(3) LOCAL GOVERNMENT ACT 1993

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 


 

PSRP-2    AMENDMENT NUMBER 12 TO THE WAGGA WAGGA DEVLOPMENT CONTROL PLAN 2010

16/342       RESOLVED:

                   On the Motion of Councillors T Koschel and D Tout

That Council endorse the exhibition of the proposed amendments to the Wagga Wagga Development Control Plan 2010 in accordance with the Environmental Planning and Assessment Act 1979 public consultation provisions.

CARRIED

 

RECORD OF VOTING ON DEVELOPMENT OR PLANNING MATTERS - SECTION 375A(3) LOCAL GOVERNMENT ACT 1993

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 


MOTIONS OF WHICH DUE NOTICE HAS BEEN GIVEN

 

NOM-1      NOTICE OF MOTION - FOOTPATH NETWORK CONNECTIVITY

 

16/343       RESOLVED:

                   On the Motion of Councillors D Hayes and V Keenan

That Council receives a report as part of the 2017/18 Operational Plan budget process which outlines the gaps and potential funding sources for the consideration of new footpaths to enable improved accessibility and connectivity between the existing footpath network.

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

NOM-2      NOTICE OF MOTION - COST SHIFTING OF PUBLIC LIBRARY FUNDING

 

16/344       RESOLVED:

                   On the Motion of Councillors D Hayes and D Tout

That Council write to the Premier requesting an update on the progress made by the NSW Government in addressing the inequity in funding for public libraries.

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 


 

PROCEDURAL MOTION - ENGLOBO

16/345       RESOLVED:

On the Motion of Councillors V Keenan D Hayes

 

That the standing orders be varied for the meeting as set out hereunder:

·    Items where councillors wish to speak

·    Items where no councillors wish to speak

·    Confidential

·    Matter of urgency

·    Closure of Meeting

That RP-3 and M-1 be adopted as recommended in the business papers.

 

 

REPORTS FROM STAFF

 

RP-1          COUNCIL AND COMMITTEE MEETING DATES AND TERMS OF REFERENCE - DEVELOPMENT ASSESSMENT STANDING COMMITTEE

 

16/346       RESOLVED:

                   On the Motion of Councillors R Kendall and D Tout

That Council:

a       endorse the schedule of Ordinary Council meetings for the period January 2017 to December 2017 as outlined in the report

b       that the remainder of the report be deferred to the January 2017 Ordinary Council Meeting

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 


 

RP-2          FINANCIAL PERFORMANCE REPORT NOVEMBER 2016

 

16/347       RESOLVED:

                   On the Motion of Councillors D Tout and T Koschel

That Council:

a       approve the variations to the 2016/17 original budget for November 2016 and note the deficit budget of ($62K) as presented in this report

b       note the Responsible Accounting Officer’s reports, in accordance with the Local Government (General) Regulation 2005 (Part 9 Division 3: Clause 203) that the financial position of Council is satisfactory having regard to the original estimates of income and expenditure and the recommendations made above

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

 

RP-3          PETITION - EMBLEN PARK

 

16/348       RESOLVED:

                   On the Motion of Councillors V Keenan and D Hayes

That Council:

a       receive and note the petition in opposition to the Pump/BMX Bike Track proposed for Emblen Park Tolland

b       receive a further report in March 2017 following further community consultation

CARRIED

 

 

 

 

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

 

RP-4          MAJOR EVENTS FUNDING REQUEST

Councillor K Pascoe declared a Pecuniary Interest and vacated the chamber, the time being 6:30pm.

The Mayor, Councillor G Conkey OAM declared a Pecuniary Interest and vacated the chair and the chamber, the time being 6:30pm.

The Deputy Mayor, Councillor D Tout assumed the chair the time being 6.30pm.

16/349       RESOLVED:

                   On the Motion of Councillors R Kendall and T Koschel

That Council:

a       authorise the General Manager or his delegate to enter into a one year event support agreement up to an amount of $20,000 with Wollundry Rotary Club to sponsor the Gears and Beers Festival for 2017

i         the one year support agreement is committed from 2016/17 Major Events Sponsorship budget

b       undertake a review of the Major Events Sponsorship Policy with the objective of creating a competitive multi-year events sponsorship application process in 2017/18

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

D Hayes

V Keenan

 

R Kendall

 

T Koschel

 

D Tout

 

 

Councillor D Tout vacated the chair, the time being 6.38pm.

 

 

Councillor K Pascoe re-entered the chamber, the time being 6:38pm.

 

The Mayor, Councillor G Conkey OAM re-entered the chamber and assumed the chair, the time being at 6:39pm.

 

COMMITTEE MINUTES

 

M-1            AUDIT AND RISK COMMITTEE MINUTES - 10 NOVEMBER 2016

 

16/350       RESOLVED:

                   On the Motion of Councillors V Keenan and D Hayes

That Council endorse the recommendations contained in the minutes of the Audit and Risk Committee Meeting held on 10 November 2016.

 

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

The Mayor, Councillor R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

 

 


QUESTIONS/BUSINESS WITH NOTICE

 

 

The following Questions/Business with Notice were raised and answered at the meeting:

 

1.      Councillors D Hayes and V Keenan discussed the recent Forest Hill community consultation and concerns of PFAS contamination. Although Council have no authority or responsibility in this matter, Councillors requested feedback on if Council could assist by providing an update or assist in disseminating information provided by the Government to better inform the community.

 

2.      Councillor D Hayes enquired if Council was aware of grant funding for the Rural Fire Service, with advice provided that Council are currently processing opportunities in partnership with emergency services.

 

3.      Councillor T Koschel requested feedback on what strategies and processes Council have in place and what is planned  to proactively share good things that Council does through media and community engagement.

 

 

closed COUNCIL

16/351       RESOLVED:

                   On the Motion of Councillors K Pascoe and D Hayes

That the Council now resolve itself into a Closed Council, the time being 6.49pm.

CARRIED

AT THIS STAGE OF THE MEETING THE PRESS AND PUBLIC GALLERY RETIRED FROM THE COUNCIL MEETING.

 


CONFIDENTIAL MAYORAL MINUTE

 

CONFMM-1  CONFIDENTIAL MAYORAL MINUTE - LIVESTOCK MARKETING CENTRE CANTEEN

Councillor T Koschel declared a Pecuniary Interest and vacated the chamber, the time being 6:55pm.

16/352       RESOLVED:

                   On the Motion of The Mayor, Councillor G Conkey OAM

That Council:

a       note the lease agreement to the original candidate is no longer proceeding

b       authorise the General Manager or their delegate to negotiate to enter into a lease for the Livestock Marketing Centre canteen with one of the other applicants noted in the report dated 31 October 2016, or any other party upon similar terms to those detailed in the report

c       authorise the General Manager or their delegate to execute any necessary documents on behalf of Council

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

K Pascoe

 

D Tout

 

 

 

Councillor T Koschel re-entered the chamber, the time being 6:56pm.


CONFIDENTIAL REPORTS

 

CONF-1    RFT2017/11 ROAD STABILISATION PRODUCTS SUPPLY

 

16/353       RESOLVED:

                   On the Motion of Councillors D Tout and K Pascoe

That Council:

a       accept the offers of Boral Cement Limited, Independent Cement & Lime Pty Ltd and Stabilised Pavements of Australia Pty Ltd for the supply of road stabilisation products at the schedule of rates in their respective tender submissions and authorise the General Manager or their delegate to enter into Contracts with the aforementioned suppliers

b       authorise the fixing of Council’s seal to documents as required

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

 

CONF-2    RFT2017/10 CONSTRUCTION OF CATTLE YARDS AND PEN EXTENSION LIVESTOCK MARKETING CENTRE

 

16/354       RESOLVED:

                   On the Motion of Councillors T Koschel and D Hayes

That Council:

a       accept the offers of Proway Livestock Equipment Pty Ltd for the construction of cattle yards and pen extension in the lump sum amount of $2,704,565 excluding GST and authorise the General Manager or their delegate to enter into a Contract with the aforementioned supplier

b       authorise the fixing of Council’s seal to documents as required

c       note and approve the budget variation/s as detailed in the financial implications section of the report

CARRIED

 

RECORD OF VOTING ON THE MOTION

 

For the Motion

Against the Motion

Y Braid

 

G Conkey OAM

 

D Hayes

 

V Keenan

 

R Kendall

 

T Koschel

 

K Pascoe

 

D Tout

 

 

 

REVERSION TO OPEN COUNCIL

 

16/355       RESOLVED:

                   On the Motion of Councillors R Kendall and K Pascoe

That this meeting of the Closed Council revert to an open meeting of the Council, the time being 7.10pm.

CARRIED

report of proceedings of closed COUNCIL

16/356       RESOLVED:

                   On the Motion of Councillors K Pascoe and R Kendall

That the recommendations contained in the report of the proceedings of the Closed Council be adopted.

CARRIED

 

 

THIS COMPLETED THE BUSINESS OF THE COUNCIL MEETING WHICH ROSE AT 7.10pm.

 

 

…………………………………………………..